A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo (CERIK(Construction & Economy Research Institute of Korea)) ;
  • Kim, Moo Han (Dept. of Architectural Engineering, Chungnam National University)
  • Received : 2005.12.07
  • Published : 2006.06.30

Abstract

The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.

Keywords

References

  1. Goldfayl, G. (2004). 'Construction contract administration', 2nd edition, UNSW Press, pp.226-229
  2. Davison, R. P. (2003). 'Evaluating contract claims', Blackwell Publishing Ltd., pp.226-228
  3. Sierra, J. (1996). 'Basic contract administration principles', Addison Wesley Longman Australia Pty Limited, pp.69-73
  4. Fellows, R. and Fenn, P. (2001). 'JCT standard form of building contract', 1998 edition, Palgrave, pp.151-165
  5. Capano, C. D. and Karshenas, S. (2003). 'Applying accepted economic indicators to predict cost escalation for construction.' ASC Proceedings of the 39th annual conference, Clemson University, Clemson, South Carolina, pp.277-288
  6. Knight, K. and Fayek, A. R. (2000). 'Preliminary study of the factors affecting the cost escalation of construction projects.' Canadian Journal of Civil Engineering, Vol 27(1), pp.73-83 https://doi.org/10.1139/cjce-27-1-73
  7. FIDIC, (1999). 'Conditions of contract for construction (1st Edition)
  8. Park, J. G. (2001). 'Construction contract theory', Dong- Hwa Tech.., Korea
  9. Lee, J. S. (1998). 'Policies to improve price fluctuation system', CERIK, Korea
  10. Cha, H. S. (2004). 'Examination and suggestions to improve the base date for calculating price escalation in a construction project', CERIK, Korea
  11. Wada et al., (1996). 'Explanation for 'Standard Contract Agreement for Public Construction Works', Daisei Press, Japan