• 제목/요약/키워드: Escalation & Price Escalation

검색결과 33건 처리시간 0.021초

A Delphi Study on the Price Escalation Clause in a Construction Contract

  • Choi, Min Soo;Kim, Moo Han
    • Architectural research
    • /
    • 제8권1호
    • /
    • pp.69-76
    • /
    • 2006
  • The purpose of this study is to suggest policies to improve the price escalation system in a construction contract through a Policy Delphi technique. The Delphi, including two times questionnaires and a group discussion, was conducted by joining 14 experts. Also, the escalation provisions of various countries were examined. Results of the Delphi showed that the minimum fluctuation rate for price escalation was desirable at a level of 3%. To compute the fluctuation rate, calculating the price fluctuation of overall articles was more desirable than using price indices. A bidding date was more reasonable as the initial date of change in price. Losses caused by price change should be shared between contractor and owner; therefore a deduction rate should be introduced in price escalation. Meanwhile, overhead and profit should be adjusted in proportion to the fluctuation rate; but advance payment or the delayed construction amount should be deducted from the adjusted amount.

Exploring Escalation of Commitment Situation in the Internet C2C Auction

  • Park, Sang-Cheol;Kim, Jong-Uk;Jang, Si-Young;Lee, Won-Jun
    • 한국경영정보학회:학술대회논문집
    • /
    • 한국경영정보학회 2007년도 International Conference
    • /
    • pp.126-131
    • /
    • 2007
  • Most Internet auction studies have focused on examining the determinants of auction success or closing price. However, there has been little previous research which investigates dark-side factors such as overbidding behavior in the Internet C2C transactions. For this reason, this study attempts to find situations with the escalation of commitment to bids using Internet auction systems and also examines whether the bidder's bidding is irrational. Therefore, this study applies escalation of commitment to explain the auction process such as the "going, going, gone period" with competition in Internet C2C auctions. In order to describe the auction process in terms of escalation of commitment, this study proposes psychological sunk costs, completion effect, and self-justification as the key factors of escalation of commitment and also willingness to continue bidding reflecting the decision maker's escalation behavior in terms of persistence perspective as final dependent variable. The results of PLS analysis indicate that a bidder's overbidding behavior is explained by the escalation of commitment.

  • PDF

공공 건설공사에서의 실적공사비 적용에 따른 물가변동률 산정기준 개선방안 (Improved Escalation Method for the Cost Estimation System using Previous Bid Price in Public Construction Projects)

  • 백승호;강태경;이유섭
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.108-114
    • /
    • 2012
  • 본 연구에서는 실적공사비 적용분에 대한 지수조정율 산정기준의 현황과 문제점을 분석하고 개선방향을 제시하였다. 실적공사비 적용분에 대해 공종별 실적공사비 단가의 평균값을 적용하는 기존 방식은 단가 규모가 큰 6개 공종의 변동이 전체를 좌우하여 유사 물가지표와 다른 추세를 보이는 등 비판 소지가 있다. 이에 건설공사비지수 등을 활용하는 개선방안을 제시하고 사례분석을 통해 개선의 당위성을 검증하였다. 실적공사비 비목군에 대해 건설공사비지수 등락율을 적용하는 첫번째 대안의 경우 건설공사비지수가 생산자물가지수를 활용한 가공통계이므로 유사지표간 등락추세의 일관성을 기할 수 있고, 기존 방식에 비해 물가변동 대가가 현실화될 수 있게 된다. 노무비 부분을 분리하여 별도 기준을 적용하는 두 번째 방안도 실적공사비 적용분 노무비율 만큼 투입구조 왜곡 문제가 완화되며, 유사 물가변동지표에 근접하게 되고, 물가변동 대가가 현실화된다는 측면에서 효과를 기대할 수 있다.

건설공사 중 물가변동에 따른 효율적인 계약금액 조정에 관한 기초 연구 (A Basic Study on Effective Adjustment Method for Construction Escalation/De-Escalation Price)

  • 성주용;김동진;이민재
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.3-11
    • /
    • 2019
  • 시설공사는 도로, 철도 등 기간시설과 주거, 사무 공간 등의 다양한 인프라를 구축하는 행위로써 주문제작방식으로 시행되는 산업의 특성 상 대부분 장기간이 소요된다. 장기간에 걸쳐 공사가 진행되는 동안 공사를 구성하는 원재료 가격이 등락이 발생한다. 따라서 공사비 등락 또한 필연적으로 발생하게 된다. 공사비의 등락은 곧 시공사의 이익 및 정부의 예산지출의 효율성에 민감하게 맞물린다. 따라서 요구되는 공사품질 확보와 효율적인 예산지출 위해서는 합리적으로 공사비를 조정하여 적정한 수준의 시공비가 유지되도록 해야 한다. 이러한 문제의 해결을 위한 완충제도가 물가변동으로 인한 계약금액 조정제도(Escalation/De-Escalation)이다. 본 연구에서는 효율적인 계약금액 조정방법의 제안을 위하여 품목조정방식을 기반으로 지수조정방법을 접목한 방법을 제안하였다. 또한, 물가변동 조정과 관련된 국가계약법령 및 계약예규에 반영되지 못한 사항들을 조사하여 법적으로 성문화하도록 제안하였다.

물가변동에 따른 계약금액 조정방식의 지수조정율 산출에 관한 연구 (A Study on the Escalation Method for Contract Adjustment Public Construction Project)

  • 배경태;최동수;황치원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 추계 학술논문 발표대회
    • /
    • pp.117-120
    • /
    • 2005
  • The business market of architecture has got a system that controls a deposit according to the price function. This system is written on a law of contract about countries. So the main body of construction has to make a reasonable contract. This study is written about a rate of numerical index on controling a deposit. We tried to fine problems and solutions of labor expenses, instrument costs and material costs which is so big and changable on the construction market Labor expenses are expressed according to the rate of construction scale between direct and indirect cost that applies ability of works. Instrument costs are expressed according to an output method of a unit price annually and a weight allowance of local instrument conditions and use frequence. The last material costs expressed according to a local weight allowance make a decision of the material cost index. They applies locally relative index more than absolute one on what uses the price rate of producers and importations. This solutions are not enough to apply to the real market, so it needs to exam and to be on the market after a feasibility study.

  • PDF

물가 변동에 따른 건설공사비 조정 제도의 개선 방안 - 델파이(Delphi) 설문 조사 결과를 중심으로 - (A Study on the Policies to improve the Escalating Regulations of Construction Price - With a Focus on Results of a Delphi Survey -)

  • 최민수
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.203-211
    • /
    • 2004
  • 본 연구는 전문가를 대상으로 한 델파이(Delphi) 설문조사를 통하여 물가 변동에 따른 건설공사 계약 금액 조정(escalation) 제도의 문제점 및 개선 방안에 대하여 살펴본 결과이다. 조사 결과, 에스컬레이션의 요건이 되는 건설공사비의 등락률은 소비자 물가 변동률 혹은 건설 공사비 지수에 근거하여 결정하는 것이 바람직하며, 전문가의 의견을 보면, 총 공사금액의 $3\%$ 수준이 적정한 것으로 나타났다. 나아가 환율 및 국제 원자재 가격 등 단기적 충격 요인에 기인하는 자재 가격의 급등은 건설업체가 사전적으로 예측하여 대응하는 것이 어렵다. 따라서 단품슬라이드 제를 도입하여 특정 자재의 가격 급등에 대하여 에스컬레이션을 허용할 필요성이 있다. 등락률의 산정 방식으로는 지수조정률보다는 개별 공사의 특성을 정확하게 반영할 수 있는 품목조정률이 더 바람직한 것으로 평가되었다. 지수조정률이 합리적으로 기능하기 위하여는 품목별 공종별로 노임지수와 자재지수, 기계경비지수 등이 산출되어 발표될 필요성이 있다. 에스컬레이션의 기산일로서는 현행 법령에서는 계약 체결일로 규정되어 있으나, 계약 체결 이전부터 물가 변동이 발생한다는 점을 고려할 때, 입찰일로 규정하는것이 바람직하다.

물가변동조정 사례분석을 통한 지수조정방법기반 계약금액조정 합리화방안 (The Rationalization of Contract Sum Adjustment through Case Study of Price Fluctuation Adjustment based on Index Adjustment Method)

  • 김성희
    • 한국건설관리학회논문집
    • /
    • 제12권4호
    • /
    • pp.70-78
    • /
    • 2011
  • 장기간에 걸쳐 진행되는 건설공사의 경우 공사수행기간동안 물가의 변동으로 인해 계약금액조정이 필요하며, 이를 적용하는 과정에서 일관되고 명확한 구체적 기준안이 요구되고 있다. 이에 본 연구는 물가변동이 발생되어 조정행위로 이어지기까지의 적용과정상 발생되는 핵심활동을 기반으로 실 사례를 통해 문제점을 파악하고 이에 따른 합리적 개선방안을 찾고자 하였다. 문헌연구 및 관련제도분석을 토대로 물가변동 조정행위의 적용 프로세스를 구분하였고 프로세스별 핵심활동 20개를 정의하였다. 이를 측정변수화 하여 37개의 물가변동 사례를 통해 사례분석을 실시하였다. 사례분석결과 각 프로세스별 문제점이 도출되었으며, 이에 대응하는 합리적 개선방안을 제시하였다. 본 연구를 통하여 발주자는 불필요하게 지급될 수 있는 예산의 낭비를 막을 수 있고, 계약상대자에게는 원활한 물가변동조정행위가 될 수 있는 기회가 제공되리라 기대한다.

신용장의 에스컬레이션 조항 (Price Escalation Clause of Letter of Credit)

  • 박세운
    • 통상정보연구
    • /
    • 제16권2호
    • /
    • pp.89-109
    • /
    • 2014
  • 에스컬레이션 조항의 목적은 외부가격 메카니즘에 따라 신용장금액을 증가시키기 위한 것이다. 이것은 금속이나 석유제품거래에서 발견된다. 신용장의 에스컬레이션 조항은 그 조항이 실행 가능한 것으로 신용장을 구성하느냐 여부에 대한 의문을 야기시킨다. 신용장 이외의 근거에 대한 참조는 신용장을 신용장 이외의 다른 약정에 구속시키는 비 서류적 조건이라는 것이다. 그러나 객관적이고, 쉽게 얻을 수 있는 지표에 대한 참조는 신용장 약정을 모호하게 하는 것이 아니고, 객관적 자료로 입증할 수 있다는 점에서 비서류적 조건이 아니다. 가능한 해결책은 UCP에서 신용장의 비서류적 조건 중 일부를 유효한 것으로 인정하는 것이다. 예컨대 신용장에 언급된 지표는 UCP가 적용되는 신용장거래에서도 ISP98이나 URDG75에 규정된 것처럼 무시하지 않는 것이다. 비서류적 조건이 "중심적이고 기초적"인 것이라면, 그것은 당사자가 비독립적인 지급약정을 할 의도가 있은 것으로 보인다. 당사자 간의 갈등을 극복하는 가장 공통적인 수단은 에스컬레이션 조항이 포함된 신용장을 발행하되, 개설은행의 최대지급약정의 한도를 설정하는 것이다.

  • PDF

Statistical model for forecasting uranium prices to estimate the nuclear fuel cycle cost

  • Kim, Sungki;Ko, Wonil;Nam, Hyoon;Kim, Chulmin;Chung, Yanghon;Bang, Sungsig
    • Nuclear Engineering and Technology
    • /
    • 제49권5호
    • /
    • pp.1063-1070
    • /
    • 2017
  • This paper presents a method for forecasting future uranium prices that is used as input data to calculate the uranium cost, which is a rational key cost driver of the nuclear fuel cycle cost. In other words, the statistical autoregressive integrated moving average (ARIMA) model and existing engineering cost estimation method, the so-called escalation rate model, were subjected to a comparative analysis. When the uranium price was forecasted in 2015, the margin of error of the ARIMA model forecasting was calculated and found to be 5.4%, whereas the escalation rate model was found to have a margin of error of 7.32%. Thus, it was verified that the ARIMA model is more suitable than the escalation rate model at decreasing uncertainty in nuclear fuel cycle cost calculation.

물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안 (Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation)

  • 정기창;김영애;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.540-545
    • /
    • 2008
  • 본 연구의 목적은 물가변동에 따른 실적공사비 등락률 산출 과정의 문제점과 개선방안을 제시하고자 수행되었다. 이 연구를 수행하기 위해서, 실적공사비 내역이 포함된 현장을 표본으로 실적공사비적용 방식 및 품셈적용 방식으로 물 가변동률을 산출하여 문제점을 분석하고 물가변동금액 산출에 대한 개선방안을 제안하였다. 이에 따른 연구의 결과는 다음과 같다. 1) 전체공사 내역 중 실적공사비 단가로 작성된 내역에 대해선 품셈 방식을 준용하여 물가변동 부분을 산출하는 것이 더 적정한 것으로 나타났다. 2) 산출방식에 혼선이 없도록 관련 법령 및 규정에서의 실적공사비 등락률 산출부분을 품셈으로 풀어 산정하도록 일부개정이 이루어져야 하는 것으로 나타났다.

  • PDF