• Title/Summary/Keyword: Equipment productivity

Search Result 526, Processing Time 0.024 seconds

Productivity Changes in Korea Railway Lines Using MPI (MPI를 이용한 한국철도 노선별 생산성 변화 분석)

  • Kim, Hyun-Woong;Lee, Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.4
    • /
    • pp.462-467
    • /
    • 2010
  • This paper uses MPI (Malmquist Production Index) method to provide basic information and policy direction derived to improve the productivity. This can identify whether or not the railroad service have excellent services, if there are structural problem, in which sector is experiencing a degree of productivity, in which sector should be set targets to some degree. According to the result, the productivity of Korea railway lines is measured 1.1 both publicity and profitability aspects. Changes in production technology were the most important causes. Strategic planning should consider to increase the productivity such as modernization of facilities and equipment, cost savings, and increase in productivity of employee and rail cars.

Key motivating factors affecting skilled workers' productivity in Construction projects

  • Enshassi, Adnan;Mahdi, Mahdi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.142-146
    • /
    • 2015
  • Human resources development is considered a critical issue for improving productivity of workers in construction industry. The aim of this study is to identify and rank the key motivating factors that impact skilled workers productivity according to their relative importance. A total of 27 factors were identified through a literature review, which were categorized into 2 group financial and un-financial motivators. A questionnaire instrument was adopted in this study. The study revealed that the most significant group which affected skilled workers' productivity in construction projects was financial group with the recognition of the un-financial group importance. The results emphasized that the financial group has an edge over the un-financial group which reflect the priority of need for the respondents. The results indicated that the un-financial group represents a backbone in its importance after the financial group which reflects that un-financial factors can improve productivity. The findings showed that the provision of companies to safety conditions factor such as protective safety clothing and protective equipment was ranked very low by the respondents. This is due to the dominant culture of the workers as well as the lack of their awareness regarding their own safety and lack of companies' interest in safety and health for workers. Construction companies are advised to take the key motivating factors obtained from the results of this study into serious consideration in order to improve the satisfaction of their workers and improve their productivity.

  • PDF

Improving Road Construction Productivity by Developing a Programmatic Resource Distribution System for Equipment Sharing in Multi-sectioned Road Construction Projects (다(多)공구 도로 건설 현장의 장비 공유시스템 구축을 통한 생산성 향상에 관한 연구)

  • Koo, Bonsang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.134-145
    • /
    • 2013
  • Road construction projects are parcelled into sub-sections which are then tendered to individual contractors for construction. The type of work and equipments used are similar for each sub-section. However, such equipment are not shared on a regular basis among the contractors and only partially performed in an informal and ad hoc manner. Consequently, road construction equipment suffer from low utilization and increased leasing costs. Lean construction and Program Management approaches stress the importance of collaboration among individual participants in a way that increases the collective cost savings of the entire project. This research attempts to apply such theories with the notion that under utilization of expensive equipment can be improved by formalizing a way to enable the sharing of equipment in large, public sponsored, multi-sectioned road construction projects. A system was developed consisting of a set of criteria and processes that enables automatic allocation of equipment to multiple sites on daily basis, in a way that minimizes equipment costs and improves their individual utility. The system was then applied in allocating three different types of equipment to an actual road construction project with four sub-sections for three months. A new metric, nDPR showed that utilization improved for all equipment and also equipment related costs were decreased by 4.45%. Results also showed that increased shared opportunities of equipment correspond to an increase in utilization and cost savings.

Cost Structure of Chemical Plants in Korea- Dae-Woo Engineering Co. (한국에서의 화학공장 건설비 구조 분석)

  • 송영규
    • Journal of the Korean Professional Engineers Association
    • /
    • v.14 no.2
    • /
    • pp.5-11
    • /
    • 1981
  • This analysis has been conducted for 8 chemical plants built in Korea during 1975-1976 and the results have been compared with those in U.S.A. observed by Kenneth M. Guthrie. Equipment and materials supplied by domestic makers are limited in activity field and occupy only 12% of all equipment and material cost. However, unit costs of most materials supplied by home such as cement, steel, cables and carbon steel pipes, etc. being relatively cheaper than those of abroad, their effects on material-to-equipment ratios are apparent. There is a deep difference in labor wage rates between Korea and U.S.A. as much as 16 times. However, the labor productivity observed in these model projects is in the range of 1.1-1.4 to the Gulf Coast, U.S.A. during the same period. And this low wage rate and relatively high productivity have the greatest influence on deviation of Korean cost structure from that of U.S.A. In these model projects, engineering and construction management was conducted by foreign contractors (mostly U.S.A.), and the resulting project indirect cost amounts to 7.5 times as high as most cases executed by Korean contractors alone. Weighted percentage of each component and L/M-ratio by activities of direct field cost derived from this analysis are shown in detail in Tables 2 and 5 to provide a basis for futher study and comparison.

  • PDF

Layout design optimization of pipe system in ship engine room for space efficiency

  • Lee, Dong-Myung;Kim, Soo-Young;Moon, Byung-Young;Kang, Gyung-Ju
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.37 no.7
    • /
    • pp.784-791
    • /
    • 2013
  • Recent advanced IT made layout design fast and accurate by using algorithms. Layout design should be determined by considering the position of equipment with satisfying various space constraints and its component works with optimum performance. Especially, engine room layout design is performed with mother ship data, theoretical optimal solution, design requirements and several design constraints in initial design stage. Piping design is affected by position of equipment seriously. Piping design depends on experience of designer. And also piping designer should consider correlation of equipment and efficiency of space. In this study, space evaluation method has been used to evaluate efficiency of space. And also this study suggested object function for optimal piping route, Average Reservation Index(ARI), Estimated Piping Productivity(EPP) and with modified space evaluation method. In this study, optimum pipe routing system has been developed to reflect automated piping route with space efficiency and experience of piping designer. Engine room is applied to the design of the piping in order to confirm validity of the developed system.

Productivity Analysis on Real-time Path Monitoring of Dumps (덤프의 이동경로 모니터링을 통한 생산성 분석)

  • Lee, Hak June;Kwon, Young Min;Yoon, Cha Woong;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.565-571
    • /
    • 2016
  • This study check the construction site and borrow pit location using GIS-based Open Global Map. Construction Equipment (Dump, Grader) utilizes the GPS (Global Positioning System) to gain equipment's real-time position, speed, altitude, using the data such as directions to perform real-time monitoring. The analysis of the productivity is completed through using the data, and the optimal number of equipment is calculated. It was found that the analysis results showed approximately 30% less cost compared to the actual design plan.

Productivity Analysis of Tunnel Muck Hauling Operations (터널 버력처리 공정의 생산성 분석;경부고속철도 원효터널을 중심으로)

  • Hwang, Ho-Jung;Kang, Chan-Sung;Kim, Kyoung-Min;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.827-831
    • /
    • 2007
  • For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system and offers reasonable decision making data using the simulation based planning of construction equipment operation.

  • PDF

Investigation on the Development of 3D Concrete Printing(3DPC) Technology Using Coarse Aggregation (굵은 골재를 이용한 3D 콘크리트 프린팅 기술개발에 대한 연구)

  • Hwang, Jun Pil;Kwon, Hong-Kyu
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.3
    • /
    • pp.66-77
    • /
    • 2022
  • Digitization and automation technologies have rapidly maximized productivity and efficiency in all industries over the past few decades. Construction automation technology has either stagnated over the same period or has not kept pace with overall economic productivity. According to the research studies up to now, the output of concrete structures using coarse aggregates (8mm or more) is very limited due to the limitations of equipment and materials. In this study, information on the development process of 3DCP equipment that can print concrete structures with the printing width (100 mm or more) and printing thickness (30 mm or more) using a 3DCP material mixed with coarse aggregate (8 mm or more) is provided. To verify the performance of the developed 3DCP equipment, experimental data are provided on output variables, the number of layers, and the inter-layer printing time interval. The evaluation and verification data of various mechanical properties (compressive and splitting tensile strength) of printed materials using coarse aggregates are provided.

Operating of Monitoring System for the Port Union (항만 통합 모니터링 시스템의 운영)

  • Bae, J.I.;Lee, D.C.;Woo, J.I.;Ahn, D.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.07d
    • /
    • pp.2546-2548
    • /
    • 2001
  • The contributing proportion of the increase of port productivity is more increasing concerning not only the port industry, but also all the informations of container crane which is the representative equipment by the rapid increase of the volume of freight of port. The basic of rapid service is the improvement of the productivity, the information of operation as to the productivity of crane for the quick handling within yard and especially the informations of breakdown and to handle breakdown as soon as possible has a great effect on the increase of productivity.

  • PDF

A Study for Effective Operating of Crane Using Monitoring Method (모니터닝 기법을 이용한 크레인의 운영 향상에 관한 연구)

  • Bae, Jong-Il;Hwang, Byung-Moon
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2759-2760
    • /
    • 2003
  • The contributing proportion of the increase of port productivity is more increasing concerning not only the port industry, but also all the informations of container crane which is the representative equipment by the rapid increase of the volume of freight of port. The basic of rapid service is the improvement of the productivity, the information of operation as to the productivity of crane for the quick handling within yard and especially the informations of breakdown and to handle breakdown as soon as possible has a great effect on the increase of productivity.

  • PDF