References
- Amirkhanian, S. and Baker, N. (1992). "Expert system forequipment selection for earth-moving operation." Journal Constr. Eng. Manage., Vol. 118, No. 2, pp. 318-331. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:2(318)
- Balqies, S. and Omar, A.-B. (2007). "LBS and GIS technology combination and applications." AICCSA '07. IEEE/ACS International Conference on, Computer Systems and Applications, pp. 578-583.
- Cheng, Z., eAmin, H. and Homam, B. (2009). "Collaborative multi-agent systems for construction equipment based on real-time field data capturing." ITcon, Vol. 14, Special Issue, pp. 204-228.
- Easa, S. M. (1988). "Improved method for locating centroid of earthwork." Journal of Surveying Engineering, ASCE, Vol. 114, No. 1, pp. 13-25. https://doi.org/10.1061/(ASCE)0733-9453(1988)114:1(13)
- Kim, S. K. and Russell, J. S. (2003b). "Framework for an intelligent earthwork system: Part II. Task identification/scheduling and resource allocation methodology." Automation in Construction, Vol. 12, No. 1, pp. 15-27. https://doi.org/10.1016/S0926-5805(02)00033-X
- Marzouk, M. and Moselhi, O. (2004). "Fuzzy clustering model for estimating haulers' travel time." Journal of Construction Engineering and Management, ASCE, Vol. 130, No. 6, pp. 878-886. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(878)
- Moselhi, O. and Alshibani, A. (2009). "Optimization of earthmoving operations in heavy civil engineering projects." Journal of Construction Engineering and Management, ASCE, Vol. 135, No. 10, pp. 948-954. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:10(948)
- Jeong, M. G., Kim, C. S., Kang, B. S. and Kim, J. W. (2000). "The design of control system for mobile objects using the GPS / GIS and wireless communication." Korea Information Science Society, Vol. 27, No. 1, pp. 289-291.
- Smith, S. (1999). "Earthmoving productivity estimation using linear regression techniques." Journal of Construction Engineering and Management, ASCE, Vol. 125, No. 3, pp. 131-141.
- Guionmet, T., Guilemost, C. and Pateux, S. (2001). "Embedded multiple description cording for progressive image transmission over unrelizble channels." Proc IEEE Trans., pp. 1005-1008.
- Tam, C. M., Tong, T. L. and Wong, B. L. (2007). "An integrated system for earthmoving planning." Journal of Construction Management and Economics, ASCE, Vol. 25, pp. 1125-1135.
- Yoon, J. G. and Han, K. J. (2002). "Develop of LBS (Loaction Based Service)." The Magazine of the IEEK 29(12), The Institute of Electronics Engineers of Korea, Vol. 29, No. 12, pp. 21-30.
- Zhang, H. (2008). "Multi-objectives simulation-optimization for earthworkmoving operations." Automation in Construction, Vol. 18, No. 1, pp. 78-86.