• Title/Summary/Keyword: Environmental Site Assessment

Search Result 724, Processing Time 0.031 seconds

Comparative Study of Regional-scale Ecological Risk Assessment used in Developed Countries (지역단위 생태위해성평가 선진국사례 분석)

  • Shin, Yu-Jin;Lee, Woo-Mi;An, Youn-Joo
    • Environmental Analysis Health and Toxicology
    • /
    • v.25 no.2
    • /
    • pp.169-177
    • /
    • 2010
  • Ecological risk assessment (ERA) has been used to establish environmental quality standards or evaluate ecological risk in site-specific areas. The scope of ERA was expanded based on regions, and the concept of regional-scale ecological risk assessment was recently introduced in developed countries. In the present study, regional ERA approaches of relative risk model (RRM), contaminants in aquatic and terrestrial ecosystems (CATS) model, and procedure for ecological tired assessment of risks (PETAR) in advanced countries were extensively investigated. Regional ERA was compared with traditional ERA process. Stressors, receptor and response in traditional ERA were replaced with sources of stressors, habitats, and ecological impacts, respectively in regional ERA. This study introduces the concept and assessment process of regional ERA, and provides a wide perspective how the relative ERA could be applied in Korean ecosystem.

A Study of Useability of Ecosystem Service Assessment on Strategic Environmental Assessment (전략환경영향평가 시 생태계서비스 평가 결과의 활용가능성에 관한 연구)

  • Park, Yoon-Sun;Kim, Choong-Ki;Lee, Who-Seung
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.115-126
    • /
    • 2021
  • Strategic Environmental Impact Assessment (SEA) is a decision-making process taking into account the environmental impact, economic and social impact of policies, plans, and programs at the higher stage prior to the project plan for promoting sustainable development. In this study, we analyzed the process and criteria for selecting appropriate alternatives when establishing development plan in SEA. First, the criteria for estimating changes in ecosystem services following the implementation of development project of industrial complex were presented. Second, alternative evaluations were conducted through an analysis of ecosystem service scenarios to explore suitable alternatives in Anseong. As a result, the environmental quality of selected area as the existing project site deteriorated according to the implementation of the project, and the dimensional reduction technique confirmed that the change in ecosystem service factors in project area was the optimal location. In addition, the results of the scenario assessment to explore suitable alternatives in Anseong City showed that the existing site had large capacity in terms of water quality control services (scenario 1), scenario 2 in terms of preconditioning services, and scenario 3 in terms of water supply services. The guidance of Ecosystem service assessment is expected to be available in decision-making of large-scale strategies (e.g., SEA) and projects by presenting more quantitative criteria for determining the adequacy and location feasibility of development plans and policy plans. This is expected to require various support, including legislation and revision of related laws, believed to be supported by advanced research.

Diversity of Arbuscular Mycorrhizal Fungi Associated with a Sb Accumulator Plant, Ramie (Boehmeria nivea), in an Active Sb Mining

  • Wei, Yuan;Chen, ZhiPeng;Wu, FengChang;Li, JiNing;ShangGuan, YuXian;Li, FaSheng;Zeng, Qing Ru;Hou, Hong
    • Journal of Microbiology and Biotechnology
    • /
    • v.25 no.8
    • /
    • pp.1205-1215
    • /
    • 2015
  • Arbuscular mycorrhizal fungi (AMF) have great potential for assisting heavy metal hyperaccumulators in the remediation of contaminated soils. However, little information is available about the symbiosis of AMF associated with an antimony (Sb) accumulator plant under natural conditions. Therefore, the objective of this study was to investigate the colonization and molecular diversity of AMF associated with the Sb accumulator ramie (Boehmeria nivea) growing in Sb-contaminated soils. Four Sb mine spoils and one adjacent reference area were selected from Xikuangshan in southern China. PCR-DGGE was used to analyze the AMF community composition in ramie roots. Morphological identification was also used to analyze the species in the rhizosphere soil of ramie. Results obtained showed that mycorrhizal symbiosis was established successfully even in the most heavily polluted sites. From the unpolluted site Ref to the highest polluted site T4, the spore numbers and AMF diversity increased at first and then decreased. Colonization increased consistently with the increasing Sb concentrations in the soil. A total of 14 species were identified by morphological analysis. From the total number of species, 4 (29%) belonged to Glomus, 2 (14%) belonged to Acaulospora, 2 (14%) belonged to Funneliformis, 1 (7%) belonged to Claroideoglomus, 1 (7%) belonged to Gigaspora, 1 (7%) belonged to Paraglomus, 1 (7%) belonging to Rhizophagus, 1 (7%) belonging to Sclervocystis, and 1 (7%) belonged to Scutellospora. Some AMF sequences were present even in the most polluted site. Morphological identification and phylogenetic analysis both revealed that most species were affiliated with Glomus, suggesting that Glomus was the dominant genus in this AMF community. This study demonstrated that ramie associated with AMF may have great potential for remediation of Sb-contaminated soils.

Assessment on Stabilization of Open-dumping Landfill Based on Leachate - A Case Study of Salmi Landfill - (침출수 특성 분석을 통한 사용종료 비위생매립지 안정화 평가 - 살미매립지 사례연구 -)

  • Hong, Sang-Pyo;Kim, Kwang-Yul
    • Journal of Environmental Impact Assessment
    • /
    • v.15 no.5
    • /
    • pp.299-308
    • /
    • 2006
  • To utilize a closed municipal solid waste landfill site in environmentally secure conditions, it is necessary to verify the stabilization level of landfill leachate. To assess leachate stabilization of an open-dumping municipal solid waste landfill site (Salmi Landfill) which is located at the vicinity of Chungju Reservoir which flows into Paldang Reservoir utilized as Seoul Metropolitan water supplies, the landfill history and surrounding characteristics of the landfill site were surveyed. In this investigation, waste, leachate, groundwater and surfacewater samples from this landfill were physically and chemically analyzed, and the analysis results were evaluated by 'The Criteria of Landfill Waste Stabilization (CLWS)', 'Discharge Criteria of Landfill Leachate', 'The Criteria of Domestic Use in Groundwater Quality', and 'The Criteria of Domestic Use in Surfacewater Quality' that promulgated by Korean Ministry of Environment. From the analysis results on the Salmi open-dumping landfill, C/N ratio was 18.9 and $BOD/COD_{Cr}$ ratios in leachate were higher than 1/10. Based on the CLWS, this results seemed to imply that the process of leachate stabilization at this landfill was still proceeding.

Assessment on Stabilization of Open-dumping Landfill Gas - A Case Study of Salmi Landfill - (사용종료된 비위생매립지의 매립가스 안정화 평가 - 살미매립지 사례연구 -)

  • Hong, Sang-Pyo;Kim, Kwang-Yul
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.6
    • /
    • pp.365-375
    • /
    • 2005
  • For managing and utilizing a closed municipal solid waste landfill site in environmentally secure conditions, it is necessary to verify the stabilization level of landfill gas(LFG) and waste. For assessing LFG and waste stabilization of an open-dumping municipal solid waste landfill (Salmi Landfill) which is located at the vicinity of Chungju Reservoir which flows into Paldang Reservoir that has been used for Seoul Metropolitan water supplies, the history and the surrounding characteristics of the landfill site were surveyed. In this study, waste and LFG samples obtained from landfill site were physically and chemically analyzed, and then the analysis results were evaluated on the basis of 'The Criteria of Landfill Waste Stabilization(CLWS)' that were promulgated by Korean Ministry of Environment. Based on LFG composition of Salmi landfill, $CH_4$ was as high as 68%. In CLWS regulation, the stabilization criteria of $CH_4$ should be lower than 5%, and the criteria of C/N ratio should also be lower than 1/10. The result showed that C/N ratio of landfilled waste ranged 17.4~24.7. From this results, it was concluded that the LFG and C/N ratio stabilization level of this landfill based on the CLWS were still actively proceeding.

Assessment and Improvement of Documentation Status on the Statements for the Sea Area Utilization Consultation according to the Project of Ports and Fishery Harbors (항만·어항개발사업의 해역이용협의서 작성실태 평가 및 개선방안)

  • Tac, Dae-Ho;Oh, Hyun-Taik;Kim, Gui-Young;Lee, Dae-In
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.21 no.4
    • /
    • pp.361-371
    • /
    • 2015
  • This study analyzed the 91 cases of the statements for the Sea Area Utilization Consultation according to the developmental projects of ports and fishery harbors for 2012 2014 and the status of the record of document, and suggested the improvement way to go. The marine environmental timpact assessment items both marine chemistry such as water quality, sediment and marine biology such as benthic animal, plankton, and fisheries show highly rate of site survey. But, the utilization of those data through site survey is too low, and it is necessary to adopt the QA/QC for the reliability of survey data. The items of marine physics such as tide, tidal current analyzed based on references not a site survey. However, the simulation performed actively without calibration and verification compared to the result of site survey. When the projects of port and fishery harbor perform, it is necessary to monitor the physical parameter such as wave, tide and tidal current especially. Based on the scale and the type of project, we need introduce the system of scoping for prediagnosis the key assessment items and checklists.

Multi-unit risk assessment of nuclear power plants: Current status and issues

  • Yang, Joon-Eon
    • Nuclear Engineering and Technology
    • /
    • v.50 no.8
    • /
    • pp.1199-1209
    • /
    • 2018
  • After the Fukushima-Daiichi accident in 2011, the multi-unit risk, i.e., the risk due to several nuclear power plants (NPPs) in a site has become an important issue in several countries such as Korea, Canada, and China. However, the multi-unit risk has been discussed for a long time in the nuclear community before the Fukushima-Daiichi nuclear accident occurred. The regulatory authorities around the world and the international organizations had proposed requirements or guidelines to reduce the multi-unit risk. The concerns regarding the multi-unit risk can be summarized in the following three questions: How much the accident of an NPP in a site affects the safety of other NPPs in the same site? What is the total risk of a site with many NPPs? Will the risk of the simultaneous accidents at several NPPs in a site such as the Fukushima Daiichi accident be low enough? The multi-unit risk assessment (MURA) in an integrated framework is a practical approach to obtain the answers for the above questions. Even though there were few studies to assess the multi-unit risk before the Fukushima-Daiichi nuclear accident, there are still several issues to be resolved to perform the complete MURA. This article aims to provide an overview of the multi-unit risk issues and its assessment. We discuss the several critical issues in the current MURA to get useful insights regarding the multi-unit risk with the current state art of probabilistic safety assessment (PSA) technologies. Also, the qualitative answers for the above questions are addressed.

A Case Study of Expanding the Health Impact Assessment on the Residential Development Projects (주거지 개발계획에 대한 건강영향평가 확대와 사례분석)

  • Kim, Eunchae;Ha, Jongsik;Tak, Jongseok
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.4
    • /
    • pp.250-264
    • /
    • 2022
  • The development projects subject to health impact assessment (HIA) in the current environmental impact assessment (EIA) system are limited to some projects under Article 12 of the Enforcement Decree of the Environmental Health Act (Additional Assessment Objects Subject to Health Impact Assessment Items), but health impact-related matters are being evaluated and reviewed during consultation. In particular, when a development site is planned around some pollutant sources in a residential development plan, it is evaluated and reviewed whether the site meets the risk criteria through a current concentration survey of major hazardous air pollutants. This study prepared a quantitative method to confirm the validity of the location of the residential area to be developed in the residential development plan and proposed a plan to expand the project subject to HIA within the EIA procedure. A detailed methodology was proposed by reviewing the screening and scoping procedures of the EIA system, and a case analysis of the urban development plan discussed in the past was conducted to verify the methodology.

Development of Forest Ecosystem Evaluation Considering Biotope Type (비오톱 유형을 고려한 산림지역 생태계 평가기법 개발)

  • Kim, Jeong Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.3
    • /
    • pp.38-51
    • /
    • 2007
  • The purpose of this study is to analyze of biotope types and to develop assessment for forest ecosystem evaluation method. Vegetation types divided into 27 types. Considering the vegetation types, vegetation structures, DBH, potentials, and disturbance, it was decided to apply 58 biotope types and survey site's biotopes were divided into 24 biotope types. Assessment indicators were naturaliness, diversity, rarity, stability, potential, and disturbance. The areas given the first grade in ecological value included 9.2% of the site's total land. Areas with the second grade accounted for 43.0% of the total land. Areas with the third grade made up 47.8% of the site and mostly they were areas with dominance of fired area and artificial forest. To plan to build naturally-development for Site, there should be plans to conserve areas with the first grades. For the areas with the second, and third grades, plans for ecological land use based on conservation and restoration in terms of securing biodiversity are needed.

A Study on the Environmental Assessment of Development Projects within Management Zones (관리지역 내 개발사업에 대한 환경성 평가방안 연구)

  • Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.13 no.3
    • /
    • pp.114-127
    • /
    • 2010
  • This study aimed at reviewing the case examples of environmental assessment of development projects within management zones, identifying problems and improvement opportunities and suggesting the direction of environmental assessment for management zones that are increasingly segmented Findings showed that first, the assessment of environment soundness in management zones must incorporate the national land environmental map and wide-area ecological axes established by the Ministry of Environment. Second, regarding development activities in management zones, rather than an issue of simply destroying natural environment in a development site itself during a development period, an issue of permanently isolating ecosystems from surrounding areas in a mid/long-term perspective and continually polluting water in mid-stream/upstream regions where sites are located must be considered. Third, in the case of development projects with vast areas, existing plant communities will be disturbed and the naturalness of vegetation will gradually decline due to foreign tree species introduced for landscape architecture. Therefore, creating buffer forests at forest boundaries and planting native tree species that are same as nearby tree species must be examined. Last but not least, when assessing the environmental soundness of management zones, it would be crucial to comprehensively review the environmental, social and locational features of management zones, including surrounding areas, and set the direction of environmental assessment accordingly.