• Title/Summary/Keyword: Energy plant

Search Result 3,892, Processing Time 0.03 seconds

Failure Analysis of Circulating Water Pump Shaft in Power Plant (발전 계획에서 순환 물 펌프 고장 분석)

  • Lee, Jaehong;Jung, Nam-gun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.125-128
    • /
    • 2021
  • This paper presents the root cause failure analysis of the circulating water pump in the 560 MW thermal power plant. A fractured austenitic stainless-steel shaft operated for 24 years was examined. Fracture morphology was investigated by micro and macro-fractographic analysis. The metallurgical analyses including chemical analysis, metallography and hardness testing were performed. The analysis reveals that the pump shaft was fractured due to the reverse bending load with combination of rotating bending load. Corrective actions for plant operator was recommended based on the analysis.

Planning research for Floating Power Plant by modifying LNG carriers (LNG선 개조 발전플랜트 기획연구)

  • Lee, Kangki;Bae, Jaeryu;Shin, Jaewoong;Park, Jongbok
    • Plant Journal
    • /
    • v.16 no.3
    • /
    • pp.37-41
    • /
    • 2020
  • Lately old LNG carriers increased and ship price is getting down. So Interest for reuse and modification of used LNG carriers is growing. Also the needs for replacement of old power plant is increasing. Additionally eco friendly fuel such as LNG become attractive. Consequently gas power plant is getting much more popular than before. So in this research planning, we consider the floating power plant by modifying LNG carriers. This plant has the various function including storage, power plant and bunkering fuction etc. Through this multifunctional plant, we are ready for the old power plant shutdown and energy crisis in the future when we can supply the urgent mobile floating power plant quickly in time.

Improvement of University Education for Supplying Technical Manpower for Plant Engineering Industry in the Architectural Engineering Field (국내 플랜트 엔지니어링 산업의 건축공학 분야 기술인력 수급을 위한 대학교육 개선에 관한 연구)

  • Shim, Hyun-Sun;Kim, Young-Il;Chung, Kwang-Seop
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.1
    • /
    • pp.15-20
    • /
    • 2014
  • In this study, improvement of university education is suggested so that university graduates in Architectural Engineering can work in the plant engineering industry without major retraining, which is generally required by plant engineering companies. Before the disposition of manpower to a plant engineering site, new recruits are retrained for about 2~3 years, since university education is neither sufficient, nor appropriate to handle plant engineering tasks. It is necessary to implement practical plant engineering into university education, so that graduates can work effectively in plant engineering fields, without major retraining. For a case study of an S2 University located in Seoul, it is enough to supplement the interdisciplinary program with plant engineering subjects, if proper texts are developed. To replace the plant engineering education offered by the company with university education, the following measures should be taken. First, basic plant engineering should be taught for 15 hours. Second, education on design and drawings should be reinforced.

A Study on Profitability of Power Plant for Landfill Gas (매립가스 자원화를 위한 가스엔진 발전의 수익성에 관한 연구)

  • Kim, Oh-Woo;Lee, Jeong-Il
    • Korean Business Review
    • /
    • v.19 no.2
    • /
    • pp.69-94
    • /
    • 2006
  • Landfill gas is a mixture of methane and carbon dioxide produced by the bacterial decomposition of organic wastes, and it is considered to produce bad smells and pollute the environment. Economic trials and the developments of landfill gas, as an alternative energy resource, become known at the recent years. Resource development of landfill gas, which is managed by Korea up to now, is for the most part generation using gas engine. Medium BTU and High BTU are considered for the power generation as well. I\10st income of generation using gas engine is selling charge through a power plant. Expecting to manage the power plant for up to 10 years, the analysis based on revenue and expenditure shows when the unit price is 65.2 Won and the operating rate reaches 90%, it is possible to be into the black in 2012 without considering additional financial expense. It was also analyzed that the profit at a unit price of 85 Won under the anticipated rising unit price by the operating rate of 71% is larger than at the operating rate of 90% under limited unit price of 65.2 Won. It means to manage the power plant at a unit price of 65.2 Won and the operating rate must be higher than 90% for economic logicality. If we assume that the operating rate is 90% and it increases the unit price, the unit price must be higher than 85 Won for the management of a power plant. Analysis of changing a unit price, however, might be expected to have a gradual rise of prices. If there is no price rising and additional income related to CDM(Clean Development Mechanism) and emission trading upon Kyoto protocol, the management of a power plant using gas engine will get financial difficulties because of many operating expenses. However, since landfill gas is considered as a worthy energy resource for the guarantee of sustainable development and for the equity between recent generation and future generation, the development of it must be accomplished by the government's additional supporting and efforts under the interest of all stakeholder who are involved.

  • PDF

Analysis of Operational Economic Efficiency in a Cogeneration Power Plant (열병합 발전소의 운전경제성 분석에 관한 연구)

  • Kim, Gun-Hoe;Hur, Jin-Huek;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.40-44
    • /
    • 2009
  • This study presents an operational technique to maximize the profit of a cogeneration power plant under cost-based pool power market. In benefit side energy sale profit, heat sale profit, and supplementary fund profit for electric power industry are included and the changeable cost was considered in cost side. The profit of a cogeneration power plant is varied enormously by the operation conditions, and constraint conditions. The result of this case study can be used as a reference to a cogeneration power plant under the same power trading system.

  • PDF

Conceptual Design of 100 MWe Oxy-coal Power Plant-Youngdong Project (100 MWe 순산소 석탄연소 발전시스템의 개념설계-영동 프로젝트)

  • Choi, Sangmin
    • Journal of the Korean Society of Combustion
    • /
    • v.17 no.3
    • /
    • pp.30-45
    • /
    • 2012
  • An existing unit of power plant is considered to refurbish it for possible application of carbon capture and storage(CCS). Conceptual design of the plant includes basic considerations on the national and international situation of energy use, environmental concerns, required budget, and time schedule as well as the engineering concept of the plant. While major equipment of the recently upgraded power plant is going to be reused, a new boiler for air-oxy fired dual mode operation is to be designed. Cryogenic air separation unit is considered for optimized capacity, and combustion system accommodates flue gas recirculation with multiple cleaning and humidity removal units. The flue gas is purified for carbon dioxide separation and treatment. This paper presents the background of the project, participants, and industrial background. Proposed concept of the plant operation is discussed for the possible considerations on the engineering designs.

Risk Monitor Development for On-Line Maintenance (가동중 정비를 위한 Risk Monitor 개발)

  • 김길유;한상훈;김태운
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.4
    • /
    • pp.21-26
    • /
    • 1997
  • Korea Atomic Energy Research Institute (KAERI) developed a risk monitor called Risk Monster which supports for plant operators and maintenance schedulers to monitor plant risk and to avoid high peak risk by rearranging maintenance work schedule. Risk Monster can update the plant risk continuously according to the change of system/component configuration since Risk Monster reevaluates the plant risk based on the Probabilistic Safety Assessment (PSA) results. A brief description of Risk Monster is provided. The PSA model of UCN 3, 4 nuclear power plant was converted by KAERI to Risk Monster model. Using this Risk Monster model, a feasibility study of the on-line maintenance of an Essential Service Water (ESW) pump was performed. On-line maintenance of one ESW pump has been shown to be acceptably safe, and has economic benefits. In addition, it is not a violation of technical specification to continue plant operation with an out-of-service ESW pump.

  • PDF

A Case Study on the Foundation Work of Uldolmok Tidal Current Power Plant (울돌목 시험조류발전소의 기초 시공 사례)

  • Kwon, Oh-Jung;Oh, Myoung-Hak;Lee, Kwang-Soo;Park, Jin-Soon
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.610-613
    • /
    • 2009
  • Uldolmok tidal current power plant was constructed on May 2009 at Jindo Gun in Korea. However it had much trouble in installing structure due to the extremely fast tidal current velocity(max. 5.5m/sec) and the jacket type plant structure. Therefore in this paper, The characteristics of tidal current and sea bed topography at Uldolmok tidal current plant site are investigated, and the detailed foundation work process of the plant is described.

  • PDF

A Study on Competitiveness Improvement and Countermeasure of Export Promotion in Korean Industry

  • Jae-Sung LEE
    • East Asian Journal of Business Economics (EAJBE)
    • /
    • v.12 no.3
    • /
    • pp.11-23
    • /
    • 2024
  • Purpose: The plant industry is a key order-taking industry that leads national industrial development through convergence and integration with various industries in all value chains from planning and marketing to financing, design and engineering, purchasing, construction, and operation and maintenance (O&M). Research design, data and methodology: The Korea government has been actively promoting overseas plant market development support projects to support large and public enterprises and medium and small enterprises. Results: The Korea government are working with the industry and the government so that the Korean plant industry can establish itself as a key driving force that provides the foundation for low-carbon and energy transition that our times demand and makes our world a better place to live. Conclusion: A high value-added industry that brings enormous profits and international fame to exporting countries. Korea is highly dependent on trade, should recognize the plant industry as a key national export sector.

A Multi-Criteria Spatial Decision Support System for Smart Hydrogen Energy Plant Location Planning in the Gangwon-Do Region, South Korea (강원도 지역 스마트 수소에너지 플랜트 입지계획을 위한 다기준 공간의사결정 지원 시스템 연구)

  • Yum, Sang-Guk;Adhikari, Manik Das
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.3
    • /
    • pp.381-395
    • /
    • 2023
  • This paper presents a GIS-based site suitability analysis for a smart hydrogen energy plant in the Gangwon-Do region, South Korea. A GIS-based multi-criteria decision analysis (MCDA) was implemented in this study to identify the most suitable sites for the development of smart hydrogen energy plants. The study utilizes various spatial data layers, including hydrogen generation potential and climatic conditions, environmental and topographic conditions, and natural catastrophic conditions, to evaluate the suitability of potential sites for the hydrogen energy plant. The spatial data layers were then used to rank and prioritize the sites based on suitability. The findings revealed that 4.26% of the study area, or 712.14 km2, was suitable for constructing smart hydrogen energy plants. Some regions of Cheorwon-gun, Chuncheon-si, Wonju-si, Yanggu-gun, Gangneung-si, Hoengseong-gun, and near the coastal region along the east coast were found to be suitable for solar and wind energy utilization. The proposed MCDA provides a valuable tool for decision-makers and stakeholders to make informed decisions on the location of smart hydrogen energy plants and supports the transition to a sustainable and low-carbon energy system. Decision-makers can use the results of this study to select suitable sites for constructing smart hydrogen energy plants.