• Title/Summary/Keyword: Emergency power

Search Result 745, Processing Time 0.024 seconds

PSPICE Modeling of Solar Cells for Use in Emergency Power System (비상발전용 전원으로 사용하기 위한 태양전지의 PSPICE 모델링)

  • Baek, Dong-Hyun;Song, Ho-Bin
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.52-57
    • /
    • 2010
  • Power supply to the motor using the emergency power system is being used. However, this system is rarely used except during emergency power is not inefficient. On the other hand, the use of solar power systems Emergency backup power supply as well as in normal maintenance savings, as many have benefits. In this paper, general-purpose simulator PSPICE simulations performed using the PV system to be used in the various models made by the library. In addition, for use as an emergency power generation solar power system design, modeling and analysis of the characteristics and practical use make an effective device was confirmed.

A Study on the Development of Digital Power Supply for Ship′s Emergency Lighting System (선박 비상조명용 디지털 전원장치 개발)

  • Lee, Sung-Geun
    • Journal of Navigation and Port Research
    • /
    • v.28 no.8
    • /
    • pp.667-671
    • /
    • 2004
  • This paper describes an development of digital power supply for ship's emergency lighting system(SELS). Proposed system is composed of emergency power supply system(EPSS), half bridge(HB) inverter, fluorescent lamp(FL) starting circuit and microprocessor control system. Experimental works using proposed system confirm that speedy and stable power to be supplied when main power source cut-off, compared with conventional analog type, and control input power up to 35.0[%] by adjusting pulse frequency of the HB inverter.

Development of Ultrasonic Sensor for Engine Condition Diagnosis of EDG (비상디젤발전기 엔진 상태진단 초음파 탐촉자 개발)

  • Lee, Sang-Guk;Choi, Kwang-Hee
    • Journal of Power System Engineering
    • /
    • v.17 no.4
    • /
    • pp.31-35
    • /
    • 2013
  • The emergency AC power supply system of the nuclear power plant is designed to supply the power to the nuclear power plant at the emergency operating condition. The safety function of the diesel generator at the nuclear power plant is to supply AC electric power to the safety system whenever the preferred AC power supply is unavailable. The reliable operation of onsite standby diesel generator should be ensured by a condition monitoring system designed to maintain, monitor and forecast the reliability level of diesel generator. The purpose of this paper is to improve the existing ultrasonic sensor used for condition diagnosis of engine fuel pump and cylinder head for the accurate diagnosis in actual engine condition of emergency diesel generator(EDG). As a result of this study, we could design and develop much more reliable ultrasonic sensor than existing ones.

Energy Demand Estimation in Metropolitan Area in Case of Emergency using Spatial Information (공간정보를 활용한 대도시권역 비상시 에너지 수요량 예측)

  • Nam, Gyeongmok;Lee, Hong Chul;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.105-112
    • /
    • 2019
  • Due to abnormal high temperature, electric power demand has exceeded the backup power reserved for emergency case, hence, resulting in a major power outage. In today's overcrowded cities, the unexpected disruption in energy supply and demand is a major threat to the enormous economic damage and urban malfunctions. Existing methods for estimating the demand of the emergency power source do not lend themselves to predict the actual demand in the spatial dimension of the city. In addition, the reserve power is arbitrarily distributed in the case of emergency. This paper presents a method that predicts the emergency power demand using the spatial distribution of emergency power demand by applying the daily energy consumption intensity and emergency power demand according to urban spatial information and building use.

A Study on Current Status Survey and Utilization of Emergency Generator Installation (비상발전기 설치 실태조사 및 활용 방안에 대한 고찰)

  • Lim, Hyun-Sung;Han, Un-Ki;Jung, Jin-Soo;Park, Chan-Eom;Song, Young-Sang;Choi, Jong-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.10
    • /
    • pp.34-38
    • /
    • 2015
  • Recently, the power supply situation has deteriorated and the plan has issued to utilize of emergency generators for securing standby power. If a part of Emergency Generators was utilized by peak shaving, it can be avoiding over-investment in supply power facility. In this paper we investigate management of Emergency Generator and understand the current situation. So, we verify demand response resource possibility of Emergency Generator.

Early Emergency Responses of the Japan Atomic Energy Agency against the Fukushima Daiichi Nuclear Power Station Accident in 2011

  • Okuno, Hiroshi;Sato, Sohei;Kawakami, Takeshi;Yamamoto, Kazuya;Tanaka, Tadao
    • Journal of Radiation Protection and Research
    • /
    • v.46 no.2
    • /
    • pp.66-79
    • /
    • 2021
  • Background: The Japan Atomic Energy Agency (JAEA) is specified in the Disaster Counter-measures Basic Act as a designated public corporation for dealing with nuclear disasters. Materials and Methods: The Nuclear Emergency Assistance and Training Center (NEAT) was established in 2002 as the activity base providing technical assistance to both national and local governments during nuclear emergencies. The NEAT has a robust structure and utilities and special installations, and it organizes training and exercises. Results and Discussion: Due to an offshore earthquake that caused a devastating tsunami in March 2011, a nuclear accident occurred at the Tokyo Electric Power Company's Fukushima Daiichi Nuclear Power Station. The NEAT responded by conducting off-site environmental radiation monitoring and contamination screening, dispatching special vehicles, offering telephone consultations, and calculating the dispersion of radioactive materials. An examination of the emergency response activities revealed that the organization was prepared for these types of disasters and was able to plan long-term response. Conclusion: As a designated public corporation, the JAEA technically supports the national government, the Fukushima prefectural government, and the Ibaraki prefectural government, all of which responded to the off-site emergencies resulting from the March 2011 Fukushima Daiichi accident

Dynamic Analysis of Diesel Generators on Starting Large Induction Motors (대용량유도전동기 기동시의 비상용 디젤발전기 동특성 해석)

  • Han, Poong;Cho, Sung-Don
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.139-142
    • /
    • 1987
  • It is important to evaluate the voltage characteristics of diesel generator as an emergency power supply in nuclear power plant. On loss of offsite power sources, emergency safeguard loads required to safely shutdown the reactor should be supplied by diesel generator. This paper presents the dynamic stability program to evaluate diesel generator performance as an emergency power system. The results Indicate the diesel generator ability to start the motors successfully seems to life in its impedances and inertias.

  • PDF

Analysis of the Virtual Power Plant Model Based on the Use of Emergency Generators in South Korea

  • Chung, Beom Jin;Kim, Chang Seob;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.38-46
    • /
    • 2016
  • This study analyzes the economic efficiency of the virtual power plant (VPP) model that aims to integrate a number of emergency generators installed at the consumer end and operate them as a single power plant. Several factors such as the demand response benefits from VPP operation and costs incurred for converting emergency generators into VPP are considered to assess the economic efficiency of the proposed VPP model. Scenarios for yearly VPP conversion are prepared based on the installed capacities of the emergency generators distributed in South Korea, while the costs and benefits are calculated from the viewpoints of participants and power companies in accordance with California Test Methods. Furthermore, a sensitivity analysis is conducted on the cost factors among those affecting the economic efficiency of VPP business because these two factors have a great impact on benefits.

A Study on the Emergency Power of the Airport with the case study (사례연구를 통한 공항의 비상전원에 관한 연구)

  • Choi, Hong-Kyu;Choi, Young-Jun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.11a
    • /
    • pp.129-133
    • /
    • 2005
  • While everyone who uses electric power desires perfect frequency, voltage, stability, and reliability at all times, this cannot be realized in practice. The supplying utility cannot be expected to provide a perfect power supply because many of the causes of power supply disturbances are beyond the control of the utility. The outage happens but due to many reason. The electricity equipment requires consequently the emergency power supply. We classify the subordinate for quick supply of the emergency power supply and must grope the supply plan. We will find out in this paper through the case study about the emergency power efficient operation plan.

  • PDF

Multi Remote Control of Ship's Emergency Lighting Power Supply (선박 비상조명 전원장치의 다중 원격제어)

  • Lee Sung-Geun;Lim Hyun-Jung
    • Journal of Navigation and Port Research
    • /
    • v.29 no.10 s.106
    • /
    • pp.859-863
    • /
    • 2005
  • This paper describes the improvement of power control characteristics of ship's emergency lighting power supply(SELPS), by which electric power is controlled extensively, and power ON-OFF is controlled and system parameter monitored in remote distance by PC serial communication. Proposed system is composed of step-down converter(SDC), emergency power supply circuit(EPSC), half bridge(HB) inverter, fluorescent lamp(FL) starting circuit, microprocessor control and multi communication circuit. Experimental works confirm that relative system stops when over current is detected and speedy and stable emergency power is supplied when main power source cut-off, and controls input power up to 35[$\%$] by adjusting pulse frequency of the HB inverter, and ON-OFF control of multiple SELS, real time transmission and monitor of parameters as to voltage, current, and power values are performed appropriately by PC communication.