• 제목/요약/키워드: Electrical Substation System

검색결과 504건 처리시간 0.026초

상정사고를 고려한 배전용 변전소 신,증설 계획 수립에 관한 연구 (A study on the planning for construction and expanding of distribution substation considering contingency)

  • 최상봉;김대경;정성환;배정효;하태현;이현구;한상용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.552-554
    • /
    • 2000
  • This paper presents algorithm to plan construction and expanding of substation considering contingency accidents by proposing utilization factor according to configuration of bank system. In this paper, at first, proper sphere of supply area in each district which could be standardized with respect to its supply capacity is established under assumption which was made long term load forecasting in district respectively. Secondly, goal of utilization ratio according to configuration of substation bank was set to keep reliability by remaining sound bank when it happen to one bank accidents Finally, optimal construction and expanding of substation considering economy and reliability simultaneously about substation to exceed these ratio could be anticipated.

  • PDF

SCADA 기능과 전기품질 온라인 감시 및 배전설비 열화감시 기능을 갖는 배전지능화 시스템 개발 (Development of intelligent distribution automation system with the function of substation SCADA, power quality monitoring and diagnosis condition monitoring)

  • 하복남;이성우;신창훈;서인용;장문종;박민호;윤기갑;송일근;이병성;이정철;남궁원
    • 전기학회논문지
    • /
    • 제59권10호
    • /
    • pp.1776-1786
    • /
    • 2010
  • Intelligent distribution automation system have total monitoring and control capability. The system covers substation, distribution network, distributed generations and customers at HV system. Various intelligent distribution facilities installed at distribution systems have voltage sensor, current sensor, aging monitoring sensor. Intelligent Feeder Remote Terminal Unit (IFRTU) tied to intelligent distribution facilities process information from facilities and it checks information of fault, power quality and aging of distribution facilities. The information is transmitted to master station through communication line. The master station have remote monitoring system covers substation, distribution network, distributed generations and customers. It also have various application programs that maintain optimal network operation by using information from on-site devices.

네트워크 기반 자동화 변전소에서 SOAP을 이용한 IED간 정보교환기술 연구 (A Study on the Information Exchange Technology Between IEDs Using SOAP in Network Based Substation Automation System)

  • 고윤석
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권9호
    • /
    • pp.376-383
    • /
    • 2006
  • In this paper, autonomous information exchange methodology is studied between IEDs using SOAP protocol based on XML and PtP communication to archive the safety and reliability of large-scale system operation. The SOAP protocol has the advantages in the independency Problem for operating systems, using language, platforms and the security problem because it is XML-based RPC protocol. Inference-based solution of the IED is designed as rule-based solution so that the IED internal status, the system status or the faulted zone can be inferred autonomously using the internal data as well as information data obtained from free information exchange among other IEDS, Also, it is designed so that the inference results and the operation information are transmitted to the above SCADA system, and determined autonomously whether the commands from the SCADA are executed or not. Finally, The inference-based solution of IED and information exchange system among IEDS is implemented using MS Visual C++ MFC, MS SOAP and MS XML. Availability and accuracy of the proposed methodology and the design is verified from diversity simulation reviews for typical distribution substation.

P.C.에 의한 GIS형 AC Substation의 접지계 설계 (Grounding System Design of GIS type AC Substation using Personal Computer)

  • 임한석;김왕
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제4권1호
    • /
    • pp.46-53
    • /
    • 1990
  • GIS(Gas-Insulated Switchgear)형 옥내변전소에 있어서 접지계의 구성은 접지도체를 포설할 수 있는 면적이 협소하기 때문에 특별한 설계방법이 요구된다. 본 논문에서는 접지망의 전위해석과 축소형 변전소의 접지계 설계기법을 제시하였고, 아울러 컴퓨터 시뮬레이션을 위한 프로그램을 작성하고 그 시뮬레이션 결과를 측정치와 비교하여 프로그램의 타당성을 입증하였다.

  • PDF

345kV 의령변전소 예방진단시스템의 데이터 분석 (Data Analysis of the Preventive diagnostic system of the 345kV Eui-Ryung substations)

  • 권동진;강연욱;주병수;이옥배;이호진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 C
    • /
    • pp.1899-1902
    • /
    • 2002
  • KEPCO is planning to operate 765kV Sin-Tao-Back and Sin-Ga-Pyong substations from 2004. A preventive diagnostic system to obtain the reliability of transformer and GIS is being adopted in 765kV substations. KEPRI has developed a preventive diagnostic system for 765kV substation since 1997. The preventive diagnostic system developed in that project was installed to the 345kV Eui-Ryung substation in June, 2000, and it is under circumstance durability test and operation capacity tests. In this paper, we analyze data of the preventive diagnostic system in 345kV Eui-Ryung substation.

  • PDF

보호계전기 정보를 이용한 피보호 설비의 고장진단에 관한 연구 (A Study on the Fault Diagnoais of Protected Facility using Relay Information)

  • 이태영;김철환
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.151-153
    • /
    • 2002
  • This paper proposes a concept for fault diagnosis system based on the relay coordination to deal with unavoidable uncertainties imposed on fault dignosis of substation. This system uses information on the relay setting values and tripped data to identify the faulted element of power system. The proposed concept will be very useful and efficient for substation and control center operator.

  • PDF

IED 적합성 시험장치를 이용한 디지털 변전소 상호운용성 시험 (Interoperability Test of the Digital Substation using IED Conformance Testing System)

  • 이남호;장병태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.11-12
    • /
    • 2007
  • In order to verify a digital substation based on IEC 61850, KEPRI in charge of POWER IT project related to SAS has constructed IED conformance testing system, which consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator, and performed the interoperability test between two IEDs made by other vendors. The test was proceeded based on SCL and with system integrated tools

  • PDF

교류 고속철도계통에서 BESS의 도입을 위한 전력소비 및 충·방전효과 분석에 관한 연구 (Study on Analysis for Power Consumption and Charge/Discharge Effect with BESS in AC High-Speed Electric Railway System)

  • 전용주;강병욱;채희석;김재철
    • 조명전기설비학회논문지
    • /
    • 제28권9호
    • /
    • pp.20-27
    • /
    • 2014
  • The power consumption pattern of high-speed railway has rarely during night time. But, during service time, the power is consumed irregularly related to train operation. Especially certain unusual about 1-2 days of service time interval to indicate the power consumption is rapidly growing phenomenon, which causes the capacity of the power contract is the annual electricity bill to rise rapidly as the cause. Normally, amount of peak power consumption bill rate at railway substation is over 20% of total electrical bill. Therefore, high-speed railway substation is expected to be considerably larger savings by reducing the peak power of the default charge(demand power).

DC 급전시뮬레이션을 통한 도시철도 회생에너지 활용 분석 (Analysis of Utilizing Regenerative Energy in Railway System through a DC Power Supply Simulation)

  • 신승권;정호성;김형철;박종영
    • 전기학회논문지
    • /
    • 제63권10호
    • /
    • pp.1479-1484
    • /
    • 2014
  • This paper deals with regenerative energy in railway system which one of the largest customer in terms of load capability. Unlike the other loads of power system, loads of railway systems change in time and space. It has a characteristic amount of generating regenerative energy by frequent starting and braking in railway system. Therefore, it is expected higher utilization in railway system than the other systems. The purpose of DC power supply simulation is analyzing backed energy, regenerative energy by each railway vehicle and substation. In this paper, regenerative energy utilization are analyzed using DC power supply simulation and it is performed changing major influence on the design such as the number of installing absorber, internal resistance value, no-load voltage value at substation or operating parameters at regenerative energy utilization. After simulating, results are compared and analyzed.