• 제목/요약/키워드: Electric Facilities

검색결과 838건 처리시간 0.022초

간접활선용 압축 슬리브를 이용한 전선 직선접속에 대한 실험적 연구 (Experimental Study on Tensile Strength of Straight-Line Connection Using Sleeve for Indirect Method)

  • Kim, Sang-Bong;Kim, Kang-Sik;Oh, Gi-Dae;Song, Won-Keun;Keum, Ui-Yeon
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.85-91
    • /
    • 2021
  • With the social atmosphere of respect for human life and the increasing interest in safety of field workers, research and development is underway in various ways to transform direct live method into indirect live method in the field of distribution. As part of this measure, it was necessary to convert electric pole and complex facilities work from machining power distribution to indirect live operation, and install a straight connecting sleeve that connects cut wires for by-pass method, but it failed to meet the tensile strength standard when constructing a sleeve constructed by direct method. In this paper, the design factors were derived based on the case of overseas similar sleeves and the tensile strength evaluation of each variable was performed, based on the analysis of these test results, the method for securing tensile strength of straight-line access sleeves for indirect running was presented.

실시간 시뮬레이터 기반의 스마트 인버터 제어기능 시험 환경 구축 및 시험 결과 (Test bed for Advanced function of Smart Inverter and Results Based on Real-Time Simulation Platform)

  • Sim, Junbo;Ban, Minho;Lim, Hyeonok;Cho, Seong-Soo
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권1호
    • /
    • pp.107-114
    • /
    • 2021
  • High penetration of renewable energy generators causes unnecessary investment for power system facilities. Especially with Korean government policies such as Renewable Energy 3020 and Inter-connection support Responsibility of KEPCO for 1 MW DERs, the applications of DER interconnection in distribution system have been increasing. To save the investment, smart control functions for DERs are required and the test bed for the inverters which have not been prepared are necessary to insure DER inter-connection stability. For this, test bed for advanced functions of a smart inverter has been constructed and the tests for necessary functions have been implemented. In this paper, the test bed and environment as well as specifications are introduced and the test results for the validation of the functions are analyzed.

지중 배전용케이블 고장통계 분석 및 고장률 활용 진단대상 우선순위 선정방법 (MV Cable Failure Statistics Analysis and Failure Rate Utilization Method of Prioritization of Diagnosis Targets)

  • 조종은;이온유;김상봉;김강식
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제7권2호
    • /
    • pp.263-268
    • /
    • 2021
  • This paper statistically analyzes the time required for each failure cause and describes a diagnostic method for 159 reports of failure analysis of MV cables that occurred in the distribution system of KEPCO over the past 18 years. In addition, the manufacturer's failure rate compared to 100C-km was calculated using 381 cases of MV cable deterioration failure between 2008 and 2020. It is hoped that this paper will help those in charge of maintaining underground facilities at the business office to use the failure rate to prioritize facility diagnosis.

발전소용 4.16 kV급 차단기에서 감전사고 사례 분석 (Analysis of Electric Shock Accident on 4.16 kV Class Circuit breaker for Power Plant)

  • 박남규;송재용;김진표;고재모
    • 한국안전학회지
    • /
    • 제29권4호
    • /
    • pp.54-60
    • /
    • 2014
  • This paper describes electric shock accidents on a 4.16 kV class circuit breaker for power plant. Electric shock accidents mostly involve damage of human life, in comparison with electrical fire, rate of human death tend to be higher in electric shock accidents. Specially, in a high voltage facilities rate of human death comprised about 43.7% by electric shock accidents. If electric shock accidents happen in a 4.16 kV class circuit breaker for power plant, then the power plant discontinue power production. Electric shock accidents in a power plant have a great ripple effect such as an electric power shortage. In this paper, we analyzed electric shock accidents on a 4.16 kV class circuit breaker for power plant. From the analysis results, we confirmed a cause of electric shock accidents on a 4.16 kV class circuit breaker, it happened by defect of interlock equipment or occurrence of breakdown between first feeder contactor and shielding plate. In order to reduce electric shock accidents on a 4.16 kV class circuit breaker, the power plant should consider improvement of interlock equipment and insulation of feeder contactor in circuit breaker.

사물인터넷 기반 수배전반 상태 모니터링 시스템 (Distributing Board Monitoring System based on Internet of Things)

  • 이영동
    • 한국정보통신학회논문지
    • /
    • 제20권1호
    • /
    • pp.200-206
    • /
    • 2016
  • 수배전반 전기사고 사전 예방을 위해 전기 관리자가 시간과 장소에 구애받지 않고 전력설비의 상태를 실시간으로 감시할 수 있는 시스템 개발이 필요하다. 본 논문에서는 사물인터넷 기반 수배전반 상태 모니터링 시스템을 제안한다. 제안된 시스템은 기존 수배전반 및 제어반 등에 설치하여 수배전반 및 제어반의 상태정보와 제어정보를 인터넷망과 연결된 클라우드 서버와 근거리 무선통신망으로 실시간 전송된다. 관리자는 관리자 단말기를 통해 언제, 어디서나 상태정보 모니터링을 신속하고 용이하게 관리할 수 있으며, 수배전반 상태정보의 성능평가 결과 판정기준 ${\pm}5%$ 이내 오차범위 내의 측정결과를 얻었다.

PV 시스템이 설치된 대학건물의 전력 생산에 따른 신재생에너지 공급비율 분석 (The analysis of the renewable energy supply ratio for the school building applied PV system)

  • 강수현;이용호;황정하;조영흠
    • 한국태양에너지학회 논문집
    • /
    • 제32권2호
    • /
    • pp.50-57
    • /
    • 2012
  • Recently the renewable energy has been used widely and the importance of renewable sources is bigger than before. And the government enforced a law to the public buildings to install the renewable energy facilities. The capacity of facilities was 5% of total construction cost until April 13, 2011. Since then, the government changed the law from 5% of total construction cost to 10% of predicted energy usage for the resonable use of the renewable energy facilities. In this study, the comparative analysis is conducted according to the law to the building installed PV system through the Energy Plus simulation. And the method for improving renewable energy supply ratio was analyzed using existing PV array. Adjusting the PV array angle is the best way to generate more electric power without additional fee. When applying the month optimum angle, 3,600kWh of electric power are more generated compared to the existing angle.

고장데이터를 이용한 대용량 전력설비 통계적 수명분석 (Statistical Lifetime Analysis for Large Electric Power Equipments using Failure Data)

  • 김정태
    • 전기학회논문지
    • /
    • 제66권11호
    • /
    • pp.1605-1611
    • /
    • 2017
  • In this study, the characteristic lifetime of power facilities such as power transformers and GIS were investigated as the basis of power facility asset management. It is difficult to obtain the operation and failure data of the facilities in Korea. Therefore, the number of failures of the electric power facilities was calculated from the operation data and hazard rate shown in the overseas literatures, and the statistical analysis was performed using the Weibull distribution function. As a result of extracting and analyzing the data of the UK National Grid for power transformers, the characteristic lifetime (scale parameter) of 116.45 years was considered to be a very appropriate value for power transformer management and can be used as a comparative data of the analysis of the domestic transformers. As for the GIS, based on the Bays and Bay-Years data and the hazard rate according to the operation years of the 123kV GIS in Germany, it is found out that the characteristic lifetime of GIS is not so meaningful. It is necessary to decide a maintenance strategy and lifetime expectancy considering the characteristics of the design, materials and manufacturing process of GIS.

전력수급 종합시스템 현장적용 (Implementation of Highly Integrated Total Energy System)

  • 박시우;윤용범;남재현;추진부;최봉수;이효상;김준환;류성호;한승구;백웅기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1525-1525
    • /
    • 1999
  • The main purpose of HITES(Highly Integrated Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The HITES can be utilized to supply a stable electric power and operate KEPCO's power system facilities economically. This system was put into operation in 1999. This paper describes the main feature of the HITES, main functions, numerical methods adopted in this system and network configuration.

  • PDF

다양한 손상상태를 반영한 피뢰기 설비의 지진취약도 해석 (Seismic Fragility Analysis of Lightning Arrester Considering Various Damage States)

  • 신유성;송종걸
    • 한국지진공학회논문집
    • /
    • 제18권1호
    • /
    • pp.19-28
    • /
    • 2014
  • The seismic evaluation of electric power facilities in the switchyard of nuclear power plants is currently insufficient. In order to evaluate the seismic performance of lightning arrester subjected to four types of earthquake (near- and far-fault earthquakes, NEHRP Site Class A&B and D earthquakes), seismic fragility analysis using maximum likelihood estimation is performed considering various damage states. The comparison of the seismic fragility curves for three main parts of lightning arrester that are the busing, anchor and steel frame, reveals that the failure of lightning arrester is governed by the bushing damage mode such as porcelain cracking.

대수용가 공급 신뢰도 조사 (The Electric Service Reliability Investigation of the large Customers)

  • 홍순학
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1987년도 정기총회 및 창립40주년기념 학술대회 학회본부
    • /
    • pp.154-156
    • /
    • 1987
  • An important aspects of power system design involves consideration of service reliability requirements of load to be supplied and service reliability provided by any proposed system. This paper shows the investigation of the 1984 KEPCO service reliability to the large electric consumer whose contracted maximum demand is over 500 kw. 68 customers of the total 111 investigated are located in Myungdong area and Yuido in Seoul. Of the customers are included hotel Lotte, Giobo and Seoul national University Hospital. The average service reliability of Myungdong area customers is 316min/yr/customer and about 7 times/yr/customer, and 160 min, 6 times for Yuido. Which the service reliability the interruption and the interruption frequency which caused by the customers receiving facilities were showed. The investigation is telling that the service reliability of the underground distribution area are very superior to the other area reliability. The investigated reliability seem not appropriate to be improved by change of distribution System as well as equipments and facilities improvement in the near future.

  • PDF