The Electric Service Reliability Investigation of the large Customers

대수용가 공급 신뢰도 조사

  • Published : 1987.11.20

Abstract

An important aspects of power system design involves consideration of service reliability requirements of load to be supplied and service reliability provided by any proposed system. This paper shows the investigation of the 1984 KEPCO service reliability to the large electric consumer whose contracted maximum demand is over 500 kw. 68 customers of the total 111 investigated are located in Myungdong area and Yuido in Seoul. Of the customers are included hotel Lotte, Giobo and Seoul national University Hospital. The average service reliability of Myungdong area customers is 316min/yr/customer and about 7 times/yr/customer, and 160 min, 6 times for Yuido. Which the service reliability the interruption and the interruption frequency which caused by the customers receiving facilities were showed. The investigation is telling that the service reliability of the underground distribution area are very superior to the other area reliability. The investigated reliability seem not appropriate to be improved by change of distribution System as well as equipments and facilities improvement in the near future.

Keywords