A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

An Empirical Approach Study on Construction Cost Estimation in Public Work Projects (공공사업 예정공사비에 대한 실증적 접근)

  • Yoo, Chang-Kyu;Song, Jeong-Gyu;Lee, Yun-Sun;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.1
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

Identification of Claim Elements for Design Build Projects using FMEA Method (FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출)

  • Yoon, Seokmin;Hyun, Changtaek;Han, Sangwon;Cha, Yongwoon
    • Journal of KIBIM
    • /
    • v.5 no.2
    • /
    • pp.26-33
    • /
    • 2015
  • Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

A Foundation Study for User Satisfaction Degree's Estimated Model of Post-Evaluation in the public construction (공공공사 사후평가의 사용자 만족도 평가모델에 대한 기초연구)

  • Kim, Jae-Woo;Cho, Chang-Yeon;Shin, Tae-Hong;Kwon, Soon-Wook;Kim, Yea-Sang;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.432-435
    • /
    • 2008
  • It's necessary to judge between success and failure of a project in order to secure the objective evaluation index and the transparency of that. In case of the public works including a construction section, the large-scale budget input proceeds, but the awareness regarding the efficiency and usefulness of the public works is decreasing because it's hard to estimate benefit originated from the results of the budget input. Therefore, this study is to propose the measurement standard for the post-evaluation based on the list of the resident response degree and user satisfaction degree to systematically and quantitatively measure the results of the post-evaluation for the public projects within the range of quantifying the consumer satisfaction degree for the facilities which preform the post-evaluation among the public projects with 50 billion budget.

  • PDF

Development of the Construction Post-evaluation System in Public Construction Projects (공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구)

  • Ok, Hyun;Yang, Sung-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.12
    • /
    • pp.7364-7371
    • /
    • 2014
  • Construction post-evaluation (CPE) boosts the efficiency of public construction projects by assessing the performance results of public construction projects and using the results to pursue similar projects. This evaluation comprehensively analyzes and assesses the planning of construction work, the estimated and actual construction costs, the construction period, the demand for construction projects, and the effects of construction projects after the construction work to ensure efficiency. The data was used to prevent lax project execution and enhance the quality and efficiency of similar construction projects. On the other hand, CPE results information must be managed systematically to refer to and use CPE data in similar construction projects. Therefore, in this study, the CPE system was developed as a measure of the systematic and comprehensive management and use of the CPE results information of individual ordering agencies. Therefore, the groundwork was laid for the assurance of quality enhancement and efficient project execution in public construction projects. This system is expected to serve as a useful tool for comprehensively analyzing and assessing construction works.

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF

THE DEVELOPMENT OF BUILDING MAINTENANCE SYSTEM FOR DETERMINING PRIORITIES OF PUBLIC FACILITY REPAIRS & REPLACEMENT (I)

  • Chun-Kyong Lee;Tae-Gab Jung;Byong-Jin Yu;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.376-381
    • /
    • 2011
  • In Korea Water Resources Corporation (K-Water) has seen four problems rising in four aspects of property management of approximately 1,300 buildings scattered through put to country. To solve these, ground data for repair and replacement works to be conducted for prevention will be prepared and building maintenance system (hereinafter referred to as PBMS) intended to record related repair and replacement work histories and calculate LCC of the related these items will be developed. PBMS, a web-based system, will be developed for users' convenience and data monitoring in real time. To sum up, PBMS are expected to maximize efficiency in four aspects including the establishment of repair and replacement work plans for prevention, history management, DB for predicting future work to be occurred and enable the determination of priorities by being developing into facility condition assessment systems through the results of analysis of repair and replacement histories and LCC.

  • PDF

Critical Factors of Subcontractor Evaluation and Selection: A Case Study in Vietnam

  • VO, Khoa Dang;PHAM, Cuong Phu;PHAN, Phuong Thanh;VU, Ngoc Bich;DUONG, My Tien Ha;LE, Loan Phuc;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.8 no.3
    • /
    • pp.297-305
    • /
    • 2021
  • A contractor or a main contractor is a company with full capacity to construct all project's works for the owner. A subcontractor is an organization that works with the main contractor to execute and complete work packages for the project. Selecting an effective subcontractor will help the efficiency and success of any projects in the construction industry. Therefore, this study identified subcontractor evaluation factors in Vietnam by collecting questionnaire survey data from engineers and staffs in the construction industry project environment. An exploratory factor analysis (EFA) was then performed to identify the critical factors when evaluating and selecting the subcontractor in construction projects. Moreover, when considering the impact level in terms of the average value, the research results showed that the most critical concern was the subcontractor's reputation. Furthermore, the top five factors affecting the sub-contractor evaluation and selection are (i) reputation, (ii) price, (iii) construction techniques, (iv) ability to implement projects according to commitments, and (v) subcontractor competence (the team of workers, technician staff, engineers with full capacity according to regulations). These research results provide an overall perspective that will help main contractors develop suitable subcontractors' evaluation and selection factors in their projects in the construction industry.

Application Method of Remote Site Monitoring in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6550-6557
    • /
    • 2013
  • The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.