A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works

공공사업의 CM제도 개선 및 정책방향

  • Published : 2002.11.01

Abstract

The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

우리나라에서 건설산업의 구조개편, 건설기술의 경쟁력 향상 등과 맞물려 CM에 대한 다양한 논의과정이 있었으며 건설산업기본법('97) 및 건설기술관리법('01)에 CM제도가 규정됨으로써 명실상부하게 체계를 갖추게 되었다. 이 중 특히 공공사업에 대해서는 효율성 제고라는 문제의식에서 출발하여 제도의 활성화를 위한 시범사업(Pilot Project)이 정부를 중심으로 추진중에 있다. 현재 추진중인 시범사업은 제도의 정착, 활성화 뿐만아니라 기존의 CM제도를 좀더 구체화하고 다양화하는 과정으로서 그 시행의 중요성을 인식할 수 있을 것이다. 이러한 시범사업의 추진을 통하여 현재의 감리중심의 CM제도에서 발주자 및 사업특성을 고려할 수 있도록 Owner형 CM, PM형, 민자사업 적용방안 등 다양한 CM적용형태를 모색해야 할 것이다. 이러한 노력들은 공공사업의 효율성 제고 뿐만아니라 민간부분에도 많은 영향을 미칠 것으로 기대된다.

Keywords