• Title/Summary/Keyword: Economic damage cost

Search Result 123, Processing Time 0.024 seconds

Reliability-based Life Cycle Cost Analysis for Optimal Seismic Upgrading of Bridges

  • Alfredo H-S. Ang;Cho, Hyo-Nam;Lim, Jong-Kwon;An, Joong-San
    • Computational Structural Engineering : An International Journal
    • /
    • v.1 no.1
    • /
    • pp.59-69
    • /
    • 2001
  • This study is intended to propose a systematic approach for reliability-based assessment of life cycle cost (LCC) effectiveness and economic efficiency for cost-effective seismic upgrading of existing bridges. The LCC function is expressed as the sum of the upgrading cost and all the discounted life cycle damage costs, which is formulated as a function of the Park-Ang damage index and structural damage probability. The damage costs are expressed in terms of direct damage costs such as repair/replacement costs, human losses and property damage costs, and indirect damage costs such as road user costs and indirect regional economic losses. For dealing with a variety of uncertainties associated with earthquake loads and capacities, a simulation-based reliability approach is used. The SMART-DRAIN-2DX, which is a modified version of the well-known DRAIN-2DX, is extended by incor-porating LCC analysis based on the LCC function developed in the study. Economic efficiencies for optimal seismic upgradings of the continuous PC segmental bridges are assessed using the proposed LCC functions and benefit-cost ratio.

  • PDF

LCC Optimization for Reinforced Concrete Structures under Seismic Hazards

  • Park, Soon-Kyu
    • KCI Concrete Journal
    • /
    • v.13 no.2
    • /
    • pp.26-32
    • /
    • 2001
  • A simple expected damage cost model is developed and a systematic approach to evaluate the economic effects of seismic hazards to reinforced concrete structures is presented. An expected damage cost function during a specific lifetime is modeled by a Poisson's process with uniform continuous cash flow assumption. It is possible that the proposed method can decouple the damage cost effect from random earthquake events. Thus, expected damage cost function can be formulated as a combination of three independent terms; a present worth factor of Poisson's process, a damage cost interpolation function and a mean occurrence rate of earthquake intensity. The validity of the proposed method is demonstrated by a comparative study of LCC evaluations with the previous study.

  • PDF

Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs (최소기대비용에 기초한 교량의 최적내진신뢰성)

  • 조효남;임종권;심성택
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF

Effects of Long-Term Harbor Shutdown and Temporal Operational Stoppage upon Optimal Design of Vertical Breakwater Caisson (장기간의 항만 폐쇄와 일시적 운영 중단이 직립 방파제 케이슨의 최적 설계에 미치는 영향)

  • Suh, Kyung-Duck;Kim, Deok-Lae;Kim, Kyung-Suk
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.19 no.2
    • /
    • pp.113-127
    • /
    • 2007
  • In this study, a model to calculate the expected total construction cost is developed that simultaneously considers the rehabilitation cost related to the sliding of the caisson, the economic damage cost due to harbor shutdown in the event of excessive caisson sliding, and the economic damage cost due to temporal operational stoppage by excessive wave overtopping. A discount rate is used to convert the damage costs occurred at different times to the present value. The optimal cross-section of a caisson is defined as the cross-section that requires a minimum expected total construction cost within the allowable limit for the expected sliding distance of the caisson during the lifetime of the breakwater. Two values are used for the allowable limit: 0.3 and 0.1 m. It was found that the economic damage cost due to harbor shutdown by excessive caisson sliding is more critical than the rehabilitation cost of the caisson or the economic damage cost by excessive wave overtopping in the decision of the optimal cross-section. In addition, the optimal cross-section of the caisson was shown to be determined by the allowable limit for the expected sliding distance rather than the minimum expected total construction cost as a larger value is used for the threshold sliding distance of the caisson for harbor shutdown.

Development of regression functions for human and economic flood damage assessments in the metropolises (대도시에서의 인적·물적 홍수피해 추정을 위한 회귀함수 개발)

  • Lim, Yeon Taek;Lee, Jong Seok;Choi, Hyun Il
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.12
    • /
    • pp.1119-1130
    • /
    • 2020
  • Flood disasters have been recently increasing worldwide due to climate change and extreme weather events. Since flood damage recovery has been conducted as a common coping strategy to flood disasters in the Republic of Korea, it is necessary to predict the regional flood damage costs by rainfall characteristics for a preventative measure to flood damage. Therefore, the purpose of this study is to present the regression functions for human and economic flood damage assessments for the 7 metropolises in the Republic of Korea. A comprehensive regression analysis was performed through the total 48 simple regression models on the two types of flood damage records for human and economic costs over the past two decades from 1998 to 2017 using the four kinds of nonlinear equations with each of the six rainfall variables. The damage assessment functions for each metropolis were finally selected by the evaluation of the regression results with the coefficient of determination and the statistical significance test, and then used for the human and economic flood damage assessments for 100-year rainfall in the 7 metropolises. The results of this study are expected to provide the basic information on flood damage cost assessments for flood damage mitigation measures.

Panel Data Analysis between Flood Damage and Recovery Cost (Panel Data 분석을 통한 홍수피해와 복구비 관계분석)

  • Park, Doo-Ho;Kim, Sun-Young
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.1
    • /
    • pp.1-8
    • /
    • 2011
  • This paper addresses the correlation between the flood damage cost and recovery cost. National data (15 regions) for 20 years, panel data, has been analyzed for this test. Model specification of panel data analysis depends on the characteristics of data set and "fixed" or "random" effects model can be used. The results are represented in both models. As we expected all independent variables show positive relationship with recovery cost, except for the number of death and suffers. The damage of public facilities, such as rivers and road are the major factors on the damage and recovery cost, which means that flood damage can not be decreased without decreasing damages of public facilities from floods. Especially, the recovery cost is always higher than the damage cost and investment for flood control. Unlikely, government investment for flood control is the highest and recovery cost is the always lower than da mage cost andinvestment in Japan. Which means that proper investment can reduce economic damage cost of flood and recovery cost.

Development of the Performance Indicator for the Mitigation of Greenhouse Gas Emissions from Products - Estimation of Social Cost for Global Warming Impact using the Conjoint Analysis - (제품의 온실가스 배출저감에 대한 성과지표 개발 - 컨조인트 분석(conjoint analysis)을 이용한 지구온난화 영향의 사회적 비용 추정 -)

  • Jeong, In-Tae;Lee, Kun-Mo;Song, Jong-Sung
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.30 no.12
    • /
    • pp.1245-1254
    • /
    • 2008
  • Proposing a method for the estimation of the social cost for global warming impact (external cost) is the aim of this paper. Both the endpoint approach and conjoint analysis were applied to estimating the social cost for global warming. The endpoint approach was used to assess the damage on the safeguard subjects by global warming due to the emission of greenhouse gases into the atmosphere. The conjoint analysis was used to estimate the economic values for safeguard subjects which measure the social preferences and willingness to pay (WTP) on safeguard subjects. The economic values of human health and social asset were estimated at 62,261,700 Won / DALY (yr) and 10,000 Won / 10,000 Won, respectively. Moreover, cost factors of GHGs were calculated by multiplying the damage factor which is quantified the unit damage on safeguard subject and the economic value. In the case of CO$_2$, the cost factor was calculated at 13.52 Won / kg (13,520 Won / ton). External cost of products or services can be calculated by multiplying the GHG inventory result of products or services by the cost factor of each GHG. inventory.

Correlation Analysis between Building Damage Cost and Major Factors Affected by Typhoon

  • Yang, Sungpil;Yu, Yeongjin;Kim, Sangho;Son, Kiyoung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.702-703
    • /
    • 2015
  • Currently, according to the climate change, serious damage by Typhoon has been occurred in the world. In this respect, the research on the damage prediction model to minimize the damage from various natural disaster has been conducted in several developed countries. In the case of U.S, various damage prediction models of buildings from natural disasters have been used widely in many organizations such as insurance companies and governments. In South Korea, although studies regarding damage prediction model of hurricane have been conducted, the scope has been only limited to consider the property of hurricane. However, it is necessary to consider various factors such as socio-economic, physical, geographical, and built environmental factors to predict the damages. Therefore, to address this issue, correlation analysis is conducted between various variables based on the data of hurricane from 2003 to 2012. The findings of this study can be utilized to develop for predicting the damage of hurricane on buildings.

  • PDF

A Study on Cost-Effectiveness Evaluation and Optimal Design of ant dampers for Cable-Stayed Bridges (사장교에 장착된 MR 댐퍼의 비용효율성 평가 및 최적설계 연구)

  • Park, Won-Suk;Hahm, Dae-Gi;Koh, Hyun-Moo;Park, Kwan-Soon
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.10 no.6 s.52
    • /
    • pp.47-56
    • /
    • 2006
  • A method is presented for evaluating the economic efficiency of a semi-active magneto-rheological (MR) damper system for cable-stayed bridges under earthquake loadings. An optimal MR damper capacity maximizing the cost-effectiveness is estimated for various seismic characteristics of ground motion. The economic efficiency of MR damper system is addressed by introducing the life-cycle cost concept. To evaluate the expected damage cost, the probability of failure is estimated. The cost-effectiveness index is defined as the ratio of the sums of the expected damage costs and each device cost between a bridge structure with the MR damper system and a bridge structure with elastic bearings. In the evaluation of cost-effectiveness, the scale of damage cost is adopted as parametric variables. The results of the evaluation show that the MR damper system can be a cost-effective design alternative. The optical capacity of MR damper is increased as the seismic hazard becomes severe.

Optimum Life-Cycle Cost-Effective Seismic Design for Continuous PSC Bridges Considering Lifetime Expected Seismic Risks (구조 수명간 지진위험도를 고려한 연속 PSC교의 LCC 최적 내진설계)

  • Cho Hyo Nam;Lee Kwang Min;Park Kyung Hoon;Kim Pyung Seok
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.720-723
    • /
    • 2004
  • This study is intended to propose a systematic approach for determining optimum Life-Cycle Cost (LCC)-effective seismic design for continuous PSC bridges considering lifetime expected seismic risks. In the paper, a set of cost function for LCC analysis of bridges is proposed. The total LCC functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect socio-economic losses. The damage costs are expressed in terms of Park-Ang median global damage indices (Park and Ang, 1985) and lifetime damage probabilities. The proposed approach is applied to model bridges of both moderate seismicity regions like Korea and high seismicity regions like Japan. Since, in case of bridges, a number of parameters may have an influence on optimal target reliability, various sensitivity analyses are performed in this study. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as continuous PC bridges.

  • PDF