• 제목/요약/키워드: Earthworks

검색결과 56건 처리시간 0.026초

3D 스캐닝 기술을 이용한 토공사 기성관리 감독 및 검사 가이드라인 개발 (A Study on the Development of the Guidelines for Supervision and Inspection of Earthworks Quantity Using 3D Scanning Technology)

  • 이영호;윤원건;박재우
    • 한국산업융합학회 논문집
    • /
    • 제23권5호
    • /
    • pp.735-746
    • /
    • 2020
  • Recently, in Korea, various technology developments have been made to utilize 3D space and facility data such as unmanned aerial vehicles (UAV) and laser scanners with the goal of improving productivity at construction sites. However, the lack of related regulations for 3D laser scanner surveying has been a barrier to using the technology across the surveying industry. As a result, owners, contractors, and construction supervisors are reluctant to introduce and apply technology to the site. In this study, the guidelines (drafting and inspection work to be supervised by construction supervisors when constructing earthworks using laser scanners) was developed and presented so that the earth surveying and quantity calculation technology using a laser scanner could be applied and diffused in a construction site. Through the development of this guideline (proposal), it is judged that the supervision and inspection of earthworks quantity using a laser scanner will be activated in the field.

토성(土城)의 공간구조 특성 연구 (A Study on Spatial Structure Characteristics of Earthen Walled Fortresses)

  • 이상석;장미란
    • 한국전통조경학회지
    • /
    • 제32권1호
    • /
    • pp.74-82
    • /
    • 2014
  • 본 연구의 목적은 지형에 의한 입지, 평면 및 단면 형태 등 토성의 공간구조적 특성을 규명하는 것이다. 사적이나 시도기념물로 지정된 37개소의 토성을 대상으로 문헌연구, 현장조사, 지형자료조사, 지형과 공간구조와의 관계 분석이 이루어졌다. 토성의 공간구조 연구의 결과는 다음과 같다. 첫째, 평지형 토성은 강이나 천과 같은 수계와 인접하였으며, 토성의 평면 형태는 정형적이었으며, 토루의 단면 형태는 단일경사의 사다리꼴형이 가장 많이 나타났다. 둘째, 구릉지형 토성은 1.5km이하의 근거리에 수계가 존재하는 곳이 70%이상을 차지했다. 평면 형태는 부정형이 73%이상으로 가장 많았고, 토루의 단면 형태는 테두리형과 산탁형이 86%이상을 차지하였다. 셋째, 산지형 토성은 1.5km이하의 근거리에 수계가 존재하는 곳이 59%이하로 평지형이나 구릉지형에 비해 외부 수계의존도가 낮았다. 평면 형태는 부정형이 67%이상으로 주류를 이루었으며, 토루의 단면 형태는 단일경사방식의 테두리형과 산탁형이 94%이상으로 나타났다.

A Study on the Variation of Ground Safety Factor by Earthworks

  • Kim, Jinhwan;Kwon, O-Il;Baek, Yong;Kim, Chang-Yong
    • 지질공학
    • /
    • 제24권3호
    • /
    • pp.333-341
    • /
    • 2014
  • The construction of roads, tunnels, and bridges results in changes to the local terrain that may influence the ground safety factor, which represents the stability of geotechnical structures. In this study, we assessed construction sites that had collapsed as a result of terrain change, and then simulated variation in the ground safety factor with respect to terrain change caused by road construction. We assumed steep slopes to simulate changes in terrain in a mountainous area and assumed that earthworks took place for road construction by cutting a platform into the slope and altering the slope angle of the terrain both above and below the road. We calculated values of the ground safety factor through a stability analysis of the slope both above and below the road, and examined the variation in the safety factor of the above- and below-road slopes with respect to changes in road width. We found that if the slope angle was the same above and below the road, then the change in the ground safety factor during/after road construction occurred in the slope below the road, and if the slope angle above the road differed from that below, then the change occurred in both the above- and below-road slopes. Furthermore, the ground safety factor was essentially constant for road widths exceeding 2-6 m, depending on both above- and below-road slope angle. The findings of this study can be used to guide the management of construction sites and to assess changes in ground stability during road construction work, particularly in the early stages of earthworks, when the road width is narrow.

건설공사 중 토공사의 핵심 지표 체계(KPI) 구축을 위한 기초연구 (Basic Research to Establish a Key Performance Indicator(KPI) System of Earthworks during Construction Project)

  • 정용일;이찬우;강경인;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.85-86
    • /
    • 2021
  • KPI, an indicator that measures the performance of factors that contribute to achieving strategies of individuals or organizations, is used a lot to analyze the performance of construction work. Construction work consists of individual construction types with different characteristics such as progress method, scale, and input resources, but currently, KPIs for performance analysis of individual construction types are lacking. Therefore, this study aims to obtain and analyze data for establishing construction performance analysis KPIs during construction work to prepare the basis for the creation of future construction KPIs. Preliminary KPIs for earthwork performance analysis selected through this study are expected to be the basis for deriving preliminary KPIs for other individual construction types.

  • PDF

철도 교량접속부의 토압과 노반강도와의 상관관계 (A Correlation Analysis on Earth Pressure and Subgrade Stiffness in Bridge Abutment Transition Zone)

  • 김진환;조국환
    • 한국철도학회논문집
    • /
    • 제19권5호
    • /
    • pp.647-655
    • /
    • 2016
  • 고속철도 건설의 증가와 기존선 개량사업 등은 철도의 직선화를 필요로 하며, 이는 터널과 교량 건설의 증가로 이어지고 있다. 철도에서 접속부는 궤도지지강성이 변화하는 구간으로 열차운행의 안정 및 잦은 궤도틀림 발생 등으로 특별히 주의를 요하는 구간이 된다. 가장 대표적인 접속부 구간은 터널과 토공의 접속부와 교량과 토공의 접속부를 들 수 있다. 그 중 교량과 토공의 접속부는 여러 가지 요인에 의하여 많은 문제를 안고 있는 실정이다. 본 논문에서는 철도에서 교량과 토공의 접속부가 안고 있는 근본적인 문제를 분석하였다. 이를 통하여 철도 교량과 토공의 접속부에 대한 이해도를 높이고 지속적으로 발생하고 있는 이 구간에서의 문제를 해결하는 방안을 제시하고자 한다.

작업자의 휴리스틱을 적용한 토량배분 및 장비운영 모델 개발 (Development of a Soil Distribution Method and Equipment Operation Models Using Worker's Heuristics)

  • 임소영;김성근;안서현
    • 대한토목학회논문집
    • /
    • 제36권3호
    • /
    • pp.551-564
    • /
    • 2016
  • 토공작업은 건설공사에 기본이 되는 공종으로 건설장비에 의한 작업이 주를 이루고 있다. 최적 토량배분 및 장비운용은 건설공사 생산성에 많은 영향을 미치는 요소이다. 토공작업은 다수의 건설장비들의 협업에 의하여 진행되어지는 기계화 작업이며 건설장비로 인하여 많은 연료가 소비되는 작업이다. 현장에서 실질적으로 이루어지는 토공작업은 건설장비 운전자의 경험과 직관에만 의존하여 작업이 수행되고 있어서 비효율적인 측면이 있으며, 토공 작업 시에 많은 연료사용으로 인한 탄소배출은 환경적인 문제점을 발생시키고 있다. 근래에는 토공작업의 효율성을 향상시키기 위한 건설사업의 자동화 및 정보화 기술을 적용한 연구가 지속적으로 이루어지고 있다. 토공작업을 위한 휴리스틱스(Heuristics)는 시간이나 정보가 불충분하여 합리적인 판단을 할 수 없는 상황에서 신속하게 사용하는 전문가의 노하우이다. 이를 의사결정 요소로 고려하여 토량배분 계획에 적용하였으며, 토량배분 계획에 의하여 형성된 작업패키지를 형성하고 해당 작업을 위하여 건설장비의 효율적인 작업경로를 생성하도록 하였다. 시뮬레이션을 수행을 통하여 제시된 방법론이 건설장비의 공간간섭 및 전체 이동거리 측면에서의 효율을 검증하였다. 본 연구의 시스템을 적용하여 검증한 결과 건설장비의 공간 간섭률이 최소화되고 이동거리가 단축되어 생산성이 좋아지는 효율을 보였다.

A Glimpse of Earthwork and Foundations on Ancient China

  • Chen, Z.Y.;Ye, S.L.;Wu, X.M.
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1995년도 가을 학술발표회 논문집
    • /
    • pp.21.2-37
    • /
    • 1995
  • Some of the ancient earthworks and foundations in china such as the great Wall and Tu-jian-yan Irrigation Head Works as well as the foundations of several ancient bridges and pagodas are introduced in the paper with emphasis on their geotechnical engineering aspects.

  • PDF

3차원 지형공간정보모델기반 토공사 계획 및 관리에 미치는 영향요인 관리 애플리케이션 연구 (A Study on 3D Geospatial Information Model based Influence Factor Management Application in Earthwork Plan)

  • 박재우;윤원건;김석수;송재호
    • 한국산업융합학회 논문집
    • /
    • 제22권2호
    • /
    • pp.125-135
    • /
    • 2019
  • In recent years, the digital transformation age represented by the "Fourth Industrial Revolution", which is a universalization of digitalization across all industries, has become a reality. In the construction sector in 2018, the Ministry of Land, Infrastructure and Transport established the Smart Construction 2025 vision and established the 'Smart Construction Technology Roadmap' aiming to complete construction automation by 2030. Especially, in the construction stage, field monitoring technology using drones is needed to support construction equipment automation and on-site control, and a 3D geospatial information model can be utilized as a base tool for this. The purpose of this study is to investigate the factors affecting earthworks work in order to manage changes in site conditions and improve communication between managers and workers in the earthworks plan, which has a considerable part in terms of construction time and cost as a single type of work. Based on this, field management procedures and applications were developed.