DOI QR코드

DOI QR Code

A Study on 3D Geospatial Information Model based Influence Factor Management Application in Earthwork Plan

3차원 지형공간정보모델기반 토공사 계획 및 관리에 미치는 영향요인 관리 애플리케이션 연구

  • Park, Jae-woo (Construction Policy Institute, Korea Institute of Civil Engineering and Building Technology) ;
  • Yun, Won Gun (Construction Policy Institute, Korea Institute of Civil Engineering and Building Technology) ;
  • Kim, Suk Su (Dept. of Railways & Metro, SOOSUNG ENGINEERING CO.,LTD) ;
  • Song, Jae Ho (Dept. of Civil Engineering, Kumoh National Institute of Technology)
  • 박재우 (한국건설기술연구원, 건설정책연구소) ;
  • 윤원건 (한국건설기술연구원, 건설정책연구소) ;
  • 김석수 ((주)수성엔지니어링 철도부) ;
  • 송재호 (금오공과대학교 토목과)
  • Received : 2018.10.26
  • Accepted : 2019.03.05
  • Published : 2019.03.31

Abstract

In recent years, the digital transformation age represented by the "Fourth Industrial Revolution", which is a universalization of digitalization across all industries, has become a reality. In the construction sector in 2018, the Ministry of Land, Infrastructure and Transport established the Smart Construction 2025 vision and established the 'Smart Construction Technology Roadmap' aiming to complete construction automation by 2030. Especially, in the construction stage, field monitoring technology using drones is needed to support construction equipment automation and on-site control, and a 3D geospatial information model can be utilized as a base tool for this. The purpose of this study is to investigate the factors affecting earthworks work in order to manage changes in site conditions and improve communication between managers and workers in the earthworks plan, which has a considerable part in terms of construction time and cost as a single type of work. Based on this, field management procedures and applications were developed.

Keywords

SOOOB6_2019_v22n2_125_f0001.png 이미지

Fig. 1 Earthworks construction planning stage

SOOOB6_2019_v22n2_125_f0002.png 이미지

Fig. 2 Earthquake risk case

SOOOB6_2019_v22n2_125_f0003.png 이미지

Fig. 3 Deriving influence factors of earthworks work plan

SOOOB6_2019_v22n2_125_f0004.png 이미지

Fig. 4 Filter TLS data and MMS data and save them as one file

SOOOB6_2019_v22n2_125_f0005.png 이미지

Fig. 5 Mapping of geotechnical survey results to 3D geospatial model

SOOOB6_2019_v22n2_125_f0006.png 이미지

Fig. 6 Create and calculate main system cells

SOOOB6_2019_v22n2_125_f0007.png 이미지

Fig. 7 Analysis cell based soil properties and influence factor management data example

SOOOB6_2019_v22n2_125_f0008.png 이미지

Fig. 8 Linking 3D geospatial information model and influence factor management technology

SOOOB6_2019_v22n2_125_f0009.png 이미지

Fig. 9 Earthwork influence factor management process

SOOOB6_2019_v22n2_125_f0010.png 이미지

Fig. 10 Impact Factor Management Application Example

References

  1. Y. S. OH, S. K, LEE, Y. S. KIM, "A Review of the Role of Spatial Information and Demonstration Proposal for Smart Construction", Proceedings of the Korean Society for Geospatial Information Science, pp. 31-32, (2018).
  2. J. P. Park, "Designing and Utilizing a Smart Factory Roadmap for CEOs: Leveraging from University-Industry Research Collaboration", Journal of The Korean Society of Industry Convergence 21(6), pp .285-299, (2018). https://doi.org/10.21289/KSIC.2018.21.6.285
  3. H. Y. Park, Y. H. Tae, S. K. Woo, "A Study on the Estimating of the Dump Truck's Travel Speed Based on Analysis of Factors Affecting Earthmoving Operation", Korean Journal of Construction Engineering and Management, KICEM, 8(3), pp. 97-105, (2007).
  4. K. B, Lee, Y. S. Kim, "Development of a Subsurface Exploration Analysis System Using Clustering Technique on Bore - hole Information ". Proceedings of KOREA INFORMATION SCIENCE SOCIETY, 27(1B), pp. 93-95, (2000).
  5. Hugenholtz, C. H., Walker, J., Brown, O. and Myshak, S., "Earthwork Volumetrics with an Unmanned Aerial Vehicle and Softcopy Photogrammetry", Journal of Surveying Engineering, Vol. 141, Issue 1, (2015).
  6. Sebastian, S., Jochen, T., "Mobile 3D mapping for surveying earthwork project using an Unmanned Aerial Vehicle (UAV) system", Automation in Construction, 41, pp. 1-14, (2014). https://doi.org/10.1016/j.autcon.2014.01.004
  7. S. B. Lim, C. W. Seo, H. C. Yun, "Earthwork Management for Dredged Soil Dumping Area by using Drone", Proceedings of the Korean Society of Civil Engineers, KSCE, pp.99-100, (2015).
  8. S. W. Moon, C. G. Moon, "Utilization of a Smart Glass for Improving Data Interface During the Earthwork Operation", Journal of the Korean Society of Civil Engineers, 37(1), pp.167-174, (2017). https://doi.org/10.12652/Ksce.2017.37.1.0167
  9. S. Y. Lim, S. K. Kim, "A Study on the Real-time Earthwork with Optimal Operation System of Construction Equipment", Proceedings of the conference on Korean Society of Civil Engineers, KSCE, pp. 1253-1254, (2017).
  10. D. H. Lee, J. W. Park, "System Improvement for Application and Diffusion of Earthwork Surveying Automation Technology", Journal of the Korea Contents Association, 18(6), pp. 303-313, (2018). https://doi.org/10.5392/JKCA.2018.18.06.303
  11. S. S. Lee, K. N. Kim, J. W. Seo, "Analyzing effect factor in earthwork and skillful excavator operator's behavior", Proceedings of the Korean Society of Civil Engineers, KSCE, pp. 1867-1870, (2008).
  12. Korea Occupational Safety & Health Agency (KOSHA), Education Materail for Construction Industry 91(2008-11), Safety for Excavation, (2008).
  13. KOREA INSTITUTE of CIVIL ENGINEERING and BUILDING TECHNOLOGY(KICT), Standard of Construction Estimate, (2019).