1 |
Korea Rail Network Authority (2013) The Railway Design Criteria(Subbase Volume).
|
2 |
B.B. Broms, A.O. Casbarian (1965) Effects of rotation of principal stress axes and of the intermediate principal stress on the shear strength, Proceedings of the 6th ICSMFE, Vol. l, Montreal, pp. 179-183.
|
3 |
J.M. Duncan, G.W. Williams, A.L. Sehn, R.B. Seed (1992) Estimation Earth Pressure Due to Compaction, Journal of Geotechnical Engineering, 117(12), pp. 1833-1847.
DOI
|
4 |
D.R. Carder, R.G. Pocock, R.T. Murray (1977) Experimental Retaining Wall Facility-Lateral stress measurements with Sand Backfill, Transport and Road Research Laboratory Report No. LR 766.
|
5 |
D.R. Carder, R.T. Murray, J.V. Krawczyk (1980) Earth Pressure against an Experimental Retaining Wall Backfilled with Silty Clay, Transport and Road Research Laboratory Report No. LR 946.
|
6 |
S.J. Lee, I.W. Lee, J.W. Lee, J.S. Lee (2009) Long-term Compression Settlement of Granular(Rock/Soil Mixture) Fill Materials under Concrete Track, Journal of the Korean Geotechnical Society, 25(8), pp. 95-106.
|
7 |
T.J. Chen, Y.S. Fang (1992) Earth pressure due to vibratory compaction, Journal of Geotechnical and Geo Engineering, 134(4), pp. 437-444.
DOI
|
8 |
K.S. Park, S.H. Lee, J.W. Lee, S.Y. Seo (2012) The trackbed assurance management technique relation analysis and management reference improvement plan, Proceedings of Korean Society for Railway 2012 Spring Conference, Gyeong-Ju, pp. 1569-1576.
|