• Title/Summary/Keyword: EPC 플랜트 프로젝트

Search Result 31, Processing Time 0.018 seconds

Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects (EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발)

  • Kim, Donghee;Ha, Minhui;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.76-84
    • /
    • 2020
  • The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

EPC Plant Project Lessons Learned Utilization Analysis (EPC 플랜트 프로젝트의 성공/실패사례 활용도 분석)

  • Yang, Sihoon;Kang, Taek-Ki;Cho, Young Duk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.5
    • /
    • pp.39-47
    • /
    • 2021
  • As domestic construction companies, which used to be concentrated in the Middle East, have expanded their overseas orders to new markets in Asia and Latin America, they have to cope with various conditions. The EPC plant project, which undertakes construction projects such as civil engineering and construction, design, purchase, construction and commissioning, has expanded its scope. As a result, it is important to collect Lessons Learned from the previous project, systematize it, and use it to respond to changes in the environment. However, many employees do not share their skills or experiences voluntarily. To do so, it is necessary to create and systematize a culture that shares experience and technology. In order to understand and analyze the current situation, a questionnaire was conducted on the EPC project-related departments of construction companies implementing the EPC plant project. About 74% of the participants said Lessons Learned's collection and utilization helped. About 53% of the people who collected and registered actual cases and 39% of the people who had experience in preventing problems using cases were identified as employees' perception and utilization of Lessons Learned systems. Detailed analysis showed differences in workplace, duties, and rank. Through this study, the current status of Lessons Learned collection and utilization of EPC plant projects is understood, and the research on collection and utilization improvement is being carried out.

Data-driven Interactive Planning Methodology for EPC Plant Projects (EPC 플랜트 프로젝트의 초기 공정계획을 위한 통합 데이터 활용 방안)

  • Wang, Hankyeom;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.95-104
    • /
    • 2019
  • EPC plant projects are large and complex, requiring systematic working methodologies, accumulated data, and thorough planning through communications between the entities. In this study, the method of extracting the process planning information using asset data of the plant project and using it to present the initial process plan is presented through the concept of IAP(Interactive Planning). In order to carry out the effective IAP at the early stage of the project, this study extracted the schedule element information from the asset data, created the process plan for each work package, and applied it to the sample project case. Through the proposed IAP methodology, it is possible to promote the utilization of asset data, to identify schedule risks, and to develop countermeasures, which can form the basis for establishing the process management strategy to successfully complete the project.

Development Of EPC Project Management Procedure Manual System For Plant Project Management (플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발)

  • Park, Bum-Jin;Lee, Min-Jae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.487-491
    • /
    • 2006
  • As Korea has been industrialized high recently, the constructional plant part which is the major driving force to Korean economic growth is being developed. In spite of the great importance, there are many ill-prepared parts in EPC project management procedure, and working in practice of EPC project management procedure manual is not systematic. That is why the governmental progressive policy on the relevant technology and the establishment of EPC project management procedure are needed. This study was aimed to derive reform measures by analyzing problems of EPC project management procedure manuals which are in use at 13 large-sized construction companies currently. The reform measures which are based on the theory of PMI(Project Management Institute)'s PMBOK(Porjcet Management Body Of Knowledge) are about deriving administration factors to control the project, and EPC project administration factors are derived from the definition of CMAA(Construction Mangement Association of America). The reformed electronic EPC project management procedure manual system is set up by standardizing derived administration factors.

  • PDF

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

Utilization of Failure Examples in Detail Design for Oil and Petrochemical Plant Project (석유화학 플랜트 프로젝트 상세설계 실패사례활용방안에 대한 연구)

  • Kang, Tae-Young;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.2
    • /
    • pp.62-67
    • /
    • 2009
  • The capability of design and engineering of global EPC companies has long been equalized through past similar construction experiences. Among various key factors in the success of EPC project, the capability of engineering is considered to be the most important factor since the engineering is preceding activities of EPC contract. The failure of engineering may adversely affect the subsequent procurement & construction activities and in turn may cause cost overrun or schedule delay. Therefore, an EPC company needs to continue to improve the engineering capabilities for the success of project. The engineering capabilities can be further improved if the EPC company should prevent recurrence of similar design faults that were previously committed. This study is intended to present how to make the most of the failure examples from previous projects towards a success of project. Failure is but a stepping stone to success. The EPC company can obtain useful lessons from the analysis of past failure examples.

  • PDF

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF