Development of Integrated Cost-Schedule Management Guidelines for EPC Modular Projects

EPC 모듈러 프로젝트의 원가·공정 통합연계관리 지침서 개발

  • Kim, Donghee (School of Architectural Engineering, Korea University of Technology & Education (Koreatech)) ;
  • Ha, Minhui (School of Architectural Engineering, Korea University of Technology & Education (Koreatech)) ;
  • Choi, Jaehyun (School of Architectural Engineering, Korea University of Technology & Education (Koreatech))
  • 김동희 (한국기술교육대학교 건축공학부) ;
  • 하민희 (한국기술교육대학교 건축공학부) ;
  • 최재현 (한국기술교육대학교 건축공학부)
  • Received : 2020.04.08
  • Accepted : 2020.05.25
  • Published : 2020.05.31

Abstract

The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.

플랜트 산업의 대형화, 복잡화 추세에 따라 플랜트 프로젝트의 수행효율을 극대화하기 위해 모듈러 플랜트의 적용비율이 높아지고 있다. 모듈러 프로젝트의 성공적인 수행을 위해서는 사업수행 전 단계에 걸친 사업수행 전략 수립 및 이행이 필수적이다. 그러나 국내 건설업체는 플랜트 사업관리기술의 정립이나 적용이 미비한 실정으로 특히 사업관리 기술의 핵심요소로써 원가와 공정의 통합관리 방법을 정립하고 체계화 하는 것이 필수적이다. 본 연구는 모듈러 플랜트 프로젝트의 원가와 공정을 통합관리하기 위한 방법론 및 지침서 개발을 목적으로 수행되었다. 모듈러 공법의 일반적인 사항, 원가·공정관리의 업무절차에 대한 이론적 고찰을 토대로 원가관리 방법론, 공정관리 방법론을 개발하고 원가·공정을 모듈단위로 통합관리 할 수 있는 방법론과 지침서를 개발하였다. 모듈러 플랜트 프로젝트에 특화된 원가·공정 통합관리 방법론 및 지침서의 적용을 통해 프로젝트 관리의 효율성을 높일 수 있을 것으로 판단된다.

Keywords

References

  1. Choi, J., Kang, S.H., Shin, H.C., Son, C.B., and Park, H.S. (2019). Construction Management-Schedule, Productivity, Cost Management, and Economic Analysis. CIR.
  2. Choi, J.O. (2019). "Related Research Trends of Modularization." Korean Journal of Construction Engineering and Management, KICEM, 20(1), pp. 45-48.
  3. Choi, J.O., and Yoon, B.K. (2005). Construction Management, SEOWOO Publication, pp. 13-14.
  4. Construction Industry Institute (2012). "Industrial Modularization: How to Optimize; How to Maximize (Best Practice)"
  5. Gibb, A., and Pendlebury M. (2005). Glossary of terms, Buildoffsite: Prompting Construction offsite, London.
  6. Gotlieb, J., Stringfellow, T., and Rice, R. (2001). "Power Plant Design taking Full Advantage of Modularization." Power Engineering, Carter & Burgess Inc., (Jun. 01, 2001).
  7. Samjong KPMG ERI Inc. (2019). Open Innovation in the Construction Industry: Notice Modularization, Automation and Digitalization, Issue Monitor, 107.
  8. Hwang, J., Choi, S., Lee, J., and Kim, Y. (2014). "Development of Bill Service Framework for Modular Housing Construction." Korean Journal of Construction Engineering and Management, KICEM, 15(5), pp. 138-146. https://doi.org/10.6106/KJCEM.2014.15.5.138
  9. Kang, N.H., and Choi, J.H. (2017). "Construction Cost-Schedule Integration Management Methodology by using Progress Integration Unit." Korean Journal of Construction Engineering and Management, KICEM, 18(3), pp. 42-52. https://doi.org/10.6106/KJCEM.2017.18.3.042
  10. Kim, D.M., Lee, J.S., Kim, J.H., and Kim. J.J. (2014). "Marketing Strategy and Influential Factors based on the Attribute of Unit Modular System." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 78-86. https://doi.org/10.6106/KJCEM.2014.15.1.078
  11. Kim, H.J., and Choi, J.H. (2019). "Development of a Conceptual Estimate Methodology for Plant Construction Projects." Korean Journal of Construction Engineering and Management, KICEM, 20(1), pp. 141-150. https://doi.org/10.6106/KJCEM.2019.20.1.141
  12. Lapp, C. W., and Golay, M.W. (1997). "Modular design and construction techniques for nuclear power plants." Nuclear Engineering and Design, 172(3), pp. 327-349. https://doi.org/10.1016/S0029-5493(97)00031-9
  13. Lee, H. (2015). Technology and R&D Trends in Plant Modularized Construction Market. The Society of Air-conditioning and Refrigeration Engineers of Korea, SAREK, 44(9), pp 54-62.
  14. Li, H.X., AI-Hussein, M., Lei, Z., and Ajweh, Z. (2013). "Risk Identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation." Canadian Journal of civil Engineering, 40(12), pp. 1184-1195. https://doi.org/10.1139/cjce-2013-0013
  15. Park, B.J., Lee, M.J., and Lee, T.S. (2008). "Development of EPC Business Process Management Model for Improving Plant Project Management."
  16. Park, C.Y., Kim, H.J., Won, J.W., Jang, W.S., and Han, S.H. (2016). "A Study for Selecting Modular Construction Method-Focus on Benefits and Barriers of Modular Method." Korean Journal of Construction Engineering and Management, KICEM, 17(4), pp. 12-19. https://doi.org/10.6106/KJCEM.2016.17.4.012
  17. Park, K.J. (2012). "Introduction of Modular Construction Method for Overseas Plant Projects." Korean Journal of Construction Engineering and Management, KICEM, 13(1), pp. 21-25.
  18. Rogan, A.L., Lawson, R.M., and Bates-Brkljac, N. (2000). "Value and benefits assessment of modular construction." The Steel Construction Institute, Ascot.
  19. Tatum, C.B., Vanegas, J.A., and Wiliams, J.M. (1987). "Construction Improvement using Prefabrication." Pre-assembly and Modularization, Technical Report 297, Austin: Construction Industry Institute.
  20. Wang, H.K., and Choi, J.H. (2019). "Data-Driven Interactive Planning Methodology for EPC Plant Projects." Korean Journal of Construction Engineering and Management, KICEM, 20(2), pp. 95-104. https://doi.org/10.6106/KJCEM.2019.20.2.095
  21. Ministry of Land, Infrastructure and Transport (2019). Integrated Cost-Schedule Management Guidelines for Plant Projects. Report Number: 19IFIP-B091004-06.