A Study on Static Lateral Loading Test for Large Diameter Drilled Shaft Pile Considering the Pile Lead Fixity Conditions (말뚝두부구속조건을 고려한 대구경 현장타설말뚝에 대한 수평정재하시험 연구)

  • Lee, Min-Hee;Hwang, Geun-Bae;Jung, Sung-Min;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.36-43
    • /
    • 2004
  • Most of pile foundations are fixed head condition, but lateral loading test for pile is performed under free head condition generally In this study, a lateral loading test for a large diameter drilled shaft was performed under the fixed pile head and the free pile head condition, where lateral displacement along the pile depth was measure. Test results and theoretical values were compared and analyzed.

  • PDF

Performance-based comparison of energy pile of various heat exchange pipe arrangement by in-situ thermal response test (현장 열응답 시험을 통한 에너지파일의 열교환파이프 배열 방식에 따른 성능 비교)

  • Min, Sunhong;Koh, Hyungseon;Yoo, Jaihyun;Jung, Kyoungsik;Lee, Youngjin;Choi, Hangseok
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.196.1-196.1
    • /
    • 2011
  • In this study, a test bed was constructed in order to evaluate thermal efficiency of the energy pile which carries out combined roles of a structural foundation and of a heat exchanger. The energy pile in this study is designed as a large-diameter drilled shaft equipped with the heat exchange pipes which configures a W-shape and an S-shape. The drilled shaft reached to the depth of 60 m whilst the heat exchange pipes were installed to about 30 m deep from the ground surface. The W-shaped and S-shaped heat exchange pipes were installed in the opposite sections of the same drilled shaft. In-situ thermal response tests were performed for both the shapes of heat exchange pipes. To avoid underestimating the thermal performance due to hydration heat of concrete inside the drilled shaft, the in-situ thermal response tests for the energy pile were performed after four weeks since the installation of the energy pile.

  • PDF

Bearing Capacity Characteristics of Drilled Shafts using Percussion Rotary Drilling (PRD 공법을 이용한 매입말뚝의 지지력 특성)

  • 윤형준;정국상;정상섬
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.307-314
    • /
    • 2001
  • The bearing capacity of drilled shafts that take excavation by Percussion Rrotary Drilling(PRD) into consideration was evaluated using static and dynamic pile load tests. The emphasis was on quantifying the allowable bearing capacity and point load-transfer at the pile tip on seven instrumented steel piles. Of the seven instrumented piles, five piles are placed to the bottom of the excavation by rotary and pushing into the final depth of the excavation, as opposed to the two driven piles. Based on the results obtained, it is shown that the skin friction mobilized by PRD is much greater than point resistance, whereas in driven piles, the point resistance is greater than skin friction. It is also found that much greater pile capacity was proved in the case of drilled shafts, compared to the driven piles and thus, the excavation by rotary drilling gives reliable pile capacity required to design axially loaded piles.

  • PDF

Analysis of Diameter Effects on Skin Friction of Drilled Shafts in Sand (사질토 지반에 설치된 현장타설말뚝의 말뚝지름에 따른 주면마찰력 분석)

  • Lee, Sung-June
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.1
    • /
    • pp.161-170
    • /
    • 2013
  • In this paper, numerical pile segment analysis is conducted with an advanced soil elastoplastic model to investigate the diameter effects on skin friction behaviour of a drilled shaft in sand. Ultimate skin friction and 't-z' behavior from the pile segment analyses for drilled shafts show good agreement with those from design methods. Higher ultimate skin friction for the smaller diameter pile is related to the greater increase in the effective radial stress at the interface due to the localized dilation at and near the pile interface. Stiffer t-z curve for the smaller diameter pile is related to the early occurrence of three shear stages (early, dilation, constant volume shear stages). The diameter effects on ultimate skin friction of drilled shafts are more prominent for denser sand and lower confining pressure.

A Case Study on Construction Cost Reduction of Large-size Building Foundation using Bi-directional High Pressure Pile Load Test(BDHPLT) (양방향 고유압 말뚝재하시험을 이용한 대형건축물 기초의 공사비 절감에 관한 사례 연구)

  • Kim, Nam-Il;Kim, Sang-Il;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.518-525
    • /
    • 2009
  • The bi-directional high pressure pile load test(BDH PLT) which is a kind of pile load tests was conducted to find out a reasonable design procedure of large-diameter drilled shafts of large-size building structures. The behaviors of bearing capacity and settlement of the large-diameter drilled shafts were analyzed and the results obtained from BDH PLT were also compared with those obtained from the equations suggested in the specification. In case of the reasonable design procedure adopted, the construction cost could be saved at least 15 ~ 28%. It could be concluded that BDH PLT should be needed for the foundation construction cost reduction of the high-rise building structures.

  • PDF

Evaluation of Skin Friction on Large Drilled Shaft (대구경 현장타설말뚝의 주면 마찰력 평가)

  • Hong Won-Pyo;Yea Geu-Guwen;Lee Jae-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.1
    • /
    • pp.93-103
    • /
    • 2005
  • Both static pile load test with load transfer measuring system and the pile dynamic load test are performed to estimate the skin friction and behavior characteristics of a large drilled shaft. And the numerical modeling of large drilled shaft is performed by applying the FDM program. Since the magnitude of friction resistance depends on the relative displacement between soil and shaft, load and displacement at the arbitrary depth along the large drilled shaft are estimated to analyze the correlation. According to the measuring results of load transfer, unit skin friction along the large drilled shaft was fully mobilized at gravel layer in the middle of shaft and the frictional resistance transmitted to bedrock was relatively small. Also, even for the same drilled shaft, the results of PDA and static load test are different with each other and the difference is discussed.

Shaft Resistance Characteristics of Rock-Socketed Drilled Shafts Based on Pile Load Tests (현장 말뚝재하시험을 통한 암반에 근입된 현장타설말뚝의 주면마찰력 결정)

  • Seol, Hoon-Il;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.9
    • /
    • pp.51-63
    • /
    • 2007
  • Behavior of rock-socketed drilled shafts subjected to axial load was investigated on the basis of pile load tests. The emphasis was laid on analyzing the shear load transfer characteristics from the shafts to surrounding rock. Field load tests were performed on nine test shafts under various conditions such as weathering of rock mass, borehole roughness, pile diameters, and loading directions. The borehole roughness at each test site was profiled using a laser borehole profiler. In order to evaluate and to propose ultimate shaft resistance($f_{max}$) of drilled shafts in rock of Korean peninsular, also, database of pile load tests was developed by reviewing various literature and technical reports.

A Case Study of Post-Grouted Drilled Shaft in Weathered Formation (풍화대소켓 대구경 현장타설말뚝의 선단보강그라우팅 사례)

  • Kwon, Oh-Sung;Lee, Jong-Sung;Jung, Sung-Min;Lee, Kyung-Jun;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.415-426
    • /
    • 2010
  • Post-grouting for the drilled shaft is known to increase the end bearing capacity of pile 2~3 times higher by consolidating and reinforcing the disturbed ground containing slime around the pile end. However, the general design guideline for post-grouting has not been established yet in Korea. Especially in the domestic application, the post-grouting is employed just for repairing the pile with the unacceptable resistance rather than for increasing the design resistance of pile. Therefore, little is reported about the effect of post-grouting on the pile resistance itself. In this study, the effect of post-grouting on the resistance of drilled shafts installed in the weathered rock in Korea was estimated by performing the bi-directional load tests on the piles with and without the post-grouting. The test results presented that the initial slope of end bearing-base displacement curve in the pile with post-grouting was 4 times higher than that without post-grouting. At the acceptable settlement (1% of pile diameter), the end bearing capacities of piles with and without the post-grouting were estimated to be 12.0 MPa and 7.0 MPa, respectively, indicating that the post-grouting could increase the end bearing resistance of pile in weathered rock more than 70%.

  • PDF

A Study on the Improvement of Bearing Capacity Prediction Equation for Auger-drilled Piling (매입말뚝공법의 지지력 예측식 개선에 관한 연구)

  • 최도웅;한병권;서영화;조성한
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.382-389
    • /
    • 2002
  • Recently, auger-drilled piling has been widely used in urban area to reduce the air pollution and noise. But this construction method that its basic theory was introduced from Japan may be changed depending on the each piling company and construction field condition. Therefore, the design code and management method for auger-drilled piling is not defined yet. Especially, the lack of research on the bearing capacity of auger-drilled piling leads to the absence of rational bearing capacity prediction equation. This paper presents the optimum design code and economical construction method of the auger-drilled piling by proposing the new bearing capacity prediction equation based on the site specific soil types and construction conditions. In this paper, existing bearing capacity prediction equations and current pile load tests were compared. And the end bearing capacity and skin friction characteristics were also analyzed by comparing the results of CAPWAP. From the results of analysis, a reliable bearing capacity prediction equation considered soil types is proposed.

  • PDF

Analysis on the Rigid Connections between the Large Diameter Drilled Shaft and the Pile Cap for the Sea-Crossing Bridges with Multiple Pile Foundations (다주식 기초 해상교량에서 대구경 현장타설말뚝과 파일캡의 강결합에 대한 분석)

  • Cho, Sung-Min;Park, Sang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.343-358
    • /
    • 2008
  • Piles of a bridge pier are connected with a column through a pile cap(footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. This difference causes a change of the design method. Connection methods between pile heads and the pile cap are divided into two groups ; rigid connections and hinge connections. KHBDC(Korea Highway Bridge Design Code) has specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However some specifications prescribe that conservative results through investigations for both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which have very good quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) are unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the very large diameter drilled shaft and the pile cap for Incheon Bridge which will the longest bridge in Korea were investigated through the full modeling for rigid connection conditions.

  • PDF