Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2004.03b
- /
- Pages.36-43
- /
- 2004
A Study on Static Lateral Loading Test for Large Diameter Drilled Shaft Pile Considering the Pile Lead Fixity Conditions
말뚝두부구속조건을 고려한 대구경 현장타설말뚝에 대한 수평정재하시험 연구
- Lee, Min-Hee (Dept. of Civil Eng., Pusan National Univ.) ;
- Hwang, Geun-Bae (Dept. of Civil & Environmental Eng., Kyungsung Univ.) ;
- Jung, Sung-Min (Dept. of Civil & Environmental Eng., Kyungsung Univ.) ;
- Choi, Yong-Kyu (Dept. of Civil & Environmental Eng., Kyungsung Univ.)
- Published : 2004.03.25
Abstract
Most of pile foundations are fixed head condition, but lateral loading test for pile is performed under free head condition generally In this study, a lateral loading test for a large diameter drilled shaft was performed under the fixed pile head and the free pile head condition, where lateral displacement along the pile depth was measure. Test results and theoretical values were compared and analyzed.