A Case Study on Construction Cost Reduction of Large-size Building Foundation using Bi-directional High Pressure Pile Load Test(BDHPLT)
양방향 고유압 말뚝재하시험을 이용한 대형건축물 기초의 공사비 절감에 관한 사례 연구
- Kim, Nam-Il (POSCO Engineering & Construction Co., Ltd.) ;
- Kim, Sang-Il (Korea Bi-Directional Pile Load Test Association) ;
- Choi, Yong-Kyu (Dept. of Civil & Environmental Engineering, Kyungsung Univ.)
- Published : 2009.03.27
Abstract
The bi-directional high pressure pile load test(BDH PLT) which is a kind of pile load tests was conducted to find out a reasonable design procedure of large-diameter drilled shafts of large-size building structures. The behaviors of bearing capacity and settlement of the large-diameter drilled shafts were analyzed and the results obtained from BDH PLT were also compared with those obtained from the equations suggested in the specification. In case of the reasonable design procedure adopted, the construction cost could be saved at least 15 ~ 28%. It could be concluded that BDH PLT should be needed for the foundation construction cost reduction of the high-rise building structures.