• Title/Summary/Keyword: Drainage pipe structures

Search Result 20, Processing Time 0.022 seconds

A Study for Drainage Pipe Construction Method using a Boring Machine (천공장치를 이용한 배수설비 연결관 시공 기술에 관한 연구)

  • Chang, Jae-Goo;Kang, Seon-Hong;Kim, Dong-Eun;Jung, Tae-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.25 no.6
    • /
    • pp.869-875
    • /
    • 2011
  • Ministry of Environment has been promoting BTL business of the sewer rehabilitation which continues from 2005 up to now. Sewer rehabilitation is classified into three parts : wastewater pipe rehabilitation, rainwater pipe rehabilitation and drainage equipment rehabilitation. Drainage equipment rehabilitation is that drainage pipe connects wastewater pipe directly without water-purifier. In the drainage equipment construction, it is inevitable to have the damage of ground structures(wall, gate and U drain, etc) when an open excavation method is used. Therefore it is necessary to develop non-excavation method to connect drainage pipe and wastewater pipe like jacking method to avoid the damage of ground structure. This paper has conducted an analysis of the non-excavation method using a boring machine attached to backhoe, which is issued the verification certificate of environmental technology according to the Development of and Support for Environmental Technology Act, article.7. The index set in this analysis was sectionalized to the condition of construction, the grade of drainage pipe, the size of excavated hole, the amount of waste cement concrete and asphalt concrete and the benefit effect compared to open excavation method.

An experimental study on the static behavior of advanced composite materials drainage pipe member for an undersea tunnel (해저터널용 복합신소재 배수복합관 부재의 정적거동에 관한 실험적 연구)

  • Shin, Jong-Ho;Kim, Kang-Hyun;Kim, Doo-Rae;Ji, Hyo-Seon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.2
    • /
    • pp.65-74
    • /
    • 2015
  • In order to design an advanced composite materials drainage pipe structures for an undersea tunnel, mechanical properties for the lamina types of the structural member must be predetermined. It is also reported that the size effect of the specimen is significant. In this study the tensile tests for the lamina types of the structural member are conducted at the room temperature ($20^{\circ}C$) and the seawater temperature ($0^{\circ}C$). In addition, the mechanical properties are predicted by theory based on the rule of mixtures and elasticity solution technique. The predicted mechanical properties are compared with test results obtained by a test method. In the design of an advanced composite materials drainage pipe structural members for an undersea tunnel, the used mechanical properties must be applied at the room temperature with considering the modified factors. These are to be offered the datum for the design an advanced composite materials drainage pipe structures for an undersea tunnel.

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.

Drainage system for leakage treatment of cement concrete structure in underground (콘크리트 지하구조물 누수 처리를 위한 유도배수시스템)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.573-585
    • /
    • 2019
  • The objective of this study is to propose the drainage system that has been improved the workability, waterproofing and drainage performance to treat the leakage from the cement concrete structures in underground. It is improved that the pipe for conveying ground leak in the existing drainage system had the problem in workability and waterproof. The drainage systems with the improved pipe for conveying ground leak were constructed in conventional concrete lining tunnels to evaluate the workability, waterproofing and drainage. The waterproof and the drainage performance of the drainage system was evaluated by injecting 1,000 ml of red water in the back of the drainage system at 3 weeks, 6 weeks, 9 weeks, 11 weeks, 14 weeks, 17 weeks and 23 weeks. During 6 months of field performance test, the average daily temperature of the tunnel site was measured from $-12.4^{\circ}C$ to $19.7^{\circ}C$. The daily minimum temperature was $-17.2^{\circ}C$ and the daily maximum temperature was $26.7^{\circ}C$. There was no problem in waterproof and drainage performance on the pipe for conveying ground leak and the drainage system during 6 months for field performance test. It is concluded that the improved drainage system can be applied to various cement concrete underground structures where leakage occurs, and has little seasonal effect.

A study on efficient management of the drainages of underground tunnels for environmentally friendly urban railway systems (도시철도 친환경 지하터널 배수형식의 효율적인 유지관리 방안 검토)

  • Baek, Jong-Myeong;Hong, Jong-Hun;Kim, Han-Bae
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1982-1990
    • /
    • 2010
  • Excepting tunnel of dorimstream - ccachimountain station section, the subway line No.2th section was build using ASSM and NATM methods because of soil pressure and land condition. The way of dealing underground water was selected without sufficient preconsideration of geographical features, ground condition, influence of lowing underground water, and long-term cost of running maintenance so that the form of undrained tunnel was build having decreased construction characteristics and technically improper elements. The form of partial drainage is very difficult to manage structures of tunnel, because water leakage, water pressure causing cracks of lining concretes and scaling are constantly happened. so partial drainage suggest that setting reinforced Anchor Bolt to prevent buoyancy and should increase center drainage way up to height of railroad. Partial drainage suggest that holey pipe(${\phi}$350mm) manhole, drainage checking pipe manhole are should be regularly dredged, when changing roadbed(gravel${\rightarrow}$concrete) drainage checking pipe manhole should be build and setting a limitation of entering underground water's quantities. Beside drainage degree in changed section of structures causing instability of structures is continuous degree. so if efficient drainage way and the patterns of flaws, problems are considered in survey, it will be expected to have a advantage condition in maintenance part.

  • PDF

Buckling of Laminated Cylindrical Composite Structures Subjected to Ply Angle Change Under External Uniform Pressure (등분포 하중 작용시 적층각 변화에 따른 원통형 적층구조물의 좌굴)

  • 나태수;염응준;한택희;강영종
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2004.04a
    • /
    • pp.349-355
    • /
    • 2004
  • The material such as steel or concrete has used to civil structures such as drainage pipes , but many problems such as corrosion in using steel and concrete pipes have happened. So, Necessity of developing new materials with high strength and anti-corrosion has been topic recently. One of this topics is study about ERP pipe. The strength of orthotropic FRP tends to be higher than it of isotropic FRP, the buckling problems can be significant in materials with high strength. thus, the study about bucking of orthotropic FRP-pipe is needed. In this study, buckling analysis of laminated cylindrical composite structures subjected In ply angle change under external uniform pressure was performed.

  • PDF

Analysis of runoff speed depending on the structure of stormwater pipe networks (우수관망 구조에 따른 유출 속도 분석)

  • Lee, Jinwoo;Chung, Gunhui
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.2
    • /
    • pp.121-129
    • /
    • 2018
  • Rainfall falling in the impervious area of the cities flows over the surface and into the stormwater pipe networks to be discharged from the catchment. Therefore, it is very important to determine the size of stormwater pipes based on the peak discharge to mitigate urban flood. Climate change causes the severe rainfall in the small area, then the peak rainfall can not be discharged due to the capacity of the stormwater pipes and causes the urban flood for the short time periods. To mitigate these type of flood, the large stormwater pipes have to be constructed. However, the economic factor is also very important to design the stormwater pipe networks. In this study, 4 urban catchments were selected from the frequently flooded cities. Rainfall data from Seoul and Busan weather stations were applied to calculate runoff from the catchments using SWMM model. The characteristics of the peak runoff were analyzed using linear regression model and the 95% confidence interval and the coefficient of variation was calculated. The drainage density was calculated and the runoff characteristics were analyzed. As a result, the drainage density were depended on the structure of stormwater pipe network whether the structures are dendritic or looped. As the drainage density become higher, the runoff could be predicted more accurately. it is because the possibility of flooding caused by the capacity of stormwater pipes is decreased when the drainage density is high. It would be very efficient if the structure of stormwater pipe network is considered when the network is designed.

Study on the Application of Press in Steel Pipe Pile for Restoring Building of different settlement (부동침하 건축물 복원을 위한 압입강관파일 공법 현장 적용에 관한 연구)

  • Sin, Jae-Kwon;Lee, Hee-Seok;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.85-86
    • /
    • 2015
  • Recently, As the high rise buildings have been demanded due to the rising current of land price, the permanent drainage method have been applied during and after the construction as a way to reduce the buoyancy acting on the bottoms of the foundations in the basement. This method has brought about the consolidation subsidence of the ground and turned out to be the problems of sinking hole and foundation re-settlement. The representative methods to be used for extending the life cycle of the existing building structure which is tilted by the foundation re-settlement or differential settlement of the foundation can be divided into the building structures reinforcement and soil reinforcement. The purpose of this study is to analyze and present the application example of steel pipe pile method to extend the life cycle of the six -stories building tilted in a soft ground.

  • PDF

Integrity Evaluation of Ice Plugged Pipes Applied on Short Jacket

  • Park, Yeong-Don;Son, Geum-Su
    • Nuclear Engineering and Technology
    • /
    • v.34 no.2
    • /
    • pp.105-116
    • /
    • 2002
  • In special industrial fields such 3s nuclear power plants and chemical plants, it is often necessary to repair system components without plant shutdown or drainage of system having many piping structures which may have hazardous or expensive fluid. A temporary ice plugging method for blocking internal flow is considered as a useful method in that case. According to the pipe freezing guideline of the nuclear power plant, the length of a freezing jacket must be longer than twice of the pipe diameter. However, for applying the ice plugging to short pipes which do not have enough freezing length because of geometrical configuration, it is inevitable to use shorter jacket less than twice of the pipe diameter. In this study, the integrity evaluation for short pipes in the nuclear power plant Is conducted by an experiment and the finite element analysis. From the results, the ice plugging process in short pipes can be safely carried out without any plastic deformation and fracture.

A Study on the Noise and Condensation Characteristics of Complex Structure Drainage Pipe Materials (복합 구조형 배수 배관재의 소음 및 결로 특성에 관한 연구)

  • Kim, Jae-Dol
    • Journal of Power System Engineering
    • /
    • v.20 no.5
    • /
    • pp.72-77
    • /
    • 2016
  • The present study investigates noise and condensation characteristics of polyvinyl chloride (PVC), which is widely used for drainage piping materials, complex double structure by comparing to those of PVC single structure piping materials. In addition, effects of insulation on drainage noise has been measured experimentally. As the results of the experiments, noise reduction effect of PVC complex double structure is superior to that of PVC single structure in terms of elbow and vertical piping materials which are employed for drainage pipes of toilet bowls and bathtub. The insulation barely have effect on the noise reduction in case of the PVC single structure since there is almost no changes in noise occurrence even though the insulation is applied on both elbow and vertical piping materials. Temperature differences between inside and outside of the pipes have been measures for the PVC single and complex double structures as well. In consequence, outside temperature of the PVC complex double structure is higher than that of the PVC single structure. The condensation occurrence time of the PVC complex double structure shows a distinct difference from that of the PVC single structure, thus, the PVC complex double structure has outstanding effect on preventing the condensation.