1 |
Choo, J.H., Park, S.W., Kim, H.T., Jee, K.H., Yoon, T.G., (2011), "Analysis and cause of occurrence of lining cracks on NATM tunnel based on the precise inspection for safety and diagnosis - Part I", Journal of Korean Tunnelling and Underground Space Association, Vol. 13, No. 3, pp. 199-214.
DOI
|
2 |
Federal Highway Administration and Federal Transit Administration (2004), Highway and rail transit tunnel maintenance and rehabilitation manual, pp. 4-1-4-19.
|
3 |
Federal Highway Administration (2015), Tunnel operations maintenance inspection evaluation (TOMIE) manual, pp. 3-1-3-20.
|
4 |
http://www.weather.go.kr/weather/climate/past_cal.jsp?stn=221&yy=2018&mm=1&obs=1&x=21&y=8.
|
5 |
Kim, D.G. (2018), "Long-term performance of drainage system for leakage treatment of tunnel operating in cold region", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 6, pp. 1177-1192.
DOI
|
6 |
Kim, D.G., Jung, H.S., Bae, G.J., Shin, H.S. (2009), "Characterization of deterioration of concrete lining in tunnel structures", Journal of Korean Tunnelling and Underground Space Association, Vol. 11, No. 4, pp. 387-394.
|
7 |
Kim, D.G., Yim, M.J. (2017b), "Improvement of existing drainage system for leakage treatment in exiting underground structures", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 4, pp. 669-683.
DOI
|
8 |
Kim, D.G., Yim, M.J. (2017c), "Effect of freezing and thawing on the drainage system for leakage treatment", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 6, pp. 1059-1075.
DOI
|
9 |
Kim, Y.S., Shin, H.C., Kim, Y.G. (2012), "Waterproofing method and new technologies for construction structure", Magazine of the Korea Concrete Institute, Vol. 24, No. 4, pp. 23-28.
DOI
|
10 |
Kwon, K.J., Oh, S.G. (2008), "A performance test method of waterproofing system to evaluate the responsiveness to the movement of box culvert structure for underground electronic power facility (mock-up test method of waterproofing layer to response 10 mm movement of expansion joint)", Magazine of the Korea Concrete Institute, Vol. 20, No. 4, pp. 57-62.
DOI
|
11 |
Lee, Y.S., Park, S.W., Whang, I.B., Shin, Y.S., Kim, S.G. (2009), "Analysis of cause and deterioration about using 3-Arch tunnel", Journal of Korean Tunnelling and Underground Space Association, Vol. 11, No. 1, pp. 97-105.
|
12 |
Kim, D.G., Yim, M.J. (2017a), "Development and performance verification of induced drainage method for leakage treatment in existing underground structures", Journal of Korean Tunnelling and Underground Space Association, Vol. 19, No. 3, pp. 533-549.
DOI
|