• Title/Summary/Keyword: Dispute Management

Search Result 232, Processing Time 0.021 seconds

The Legal Issues of Nagoya Protocol and Related Proposals for Korea (나고야 의정서의 법적 쟁점과 우리나라 입장에 관한 제언)

  • Jin, Mingzi;Son, Younghyun;Kim, Hyeyoung
    • Journal of Environmental Policy
    • /
    • v.13 no.4
    • /
    • pp.161-190
    • /
    • 2014
  • The Nagoya Protocol will enter into force on 12 October, 2014 during the period of UNCBD COP12 which will be held in Pyeongchang, Korea. In this circumstance, it is essential to analyze other countries' legislations and find various related issues. Based on that analysis, Korea can set its course for related policies and also improve its own legislations. EU and China were selected as comparison countries since EU is one of the leading countries trying to establish an international environmental law system and China is regarded as a model country representing LMMC (Like-Minded Mega-diverse Countries) in the world. Based on this study, it is highly recommended for Korea to assert the need for dispute resolution between private and government parties and also trilateral co-management of trans-boundary genetic resources and related traditional knowledge among Korea, China and Japan. In addition, Korea also needs to improve its legislation towards integrating the management and control of genetic resources.

  • PDF

The Rights of Patients as Consumers (환자의 소비자로서 권리)

  • Kwon, Yong Jin;Son, Sang Sik;Lim, Young Deok
    • Health Policy and Management
    • /
    • v.22 no.3
    • /
    • pp.315-346
    • /
    • 2012
  • The legal relationship between patient and physician is legally equal relationship. But, in times past, patients be compelled to sign an unequal contract, substantially. Because of the imbalance between supply and demand in the health care market. Today, the law of supply and demand in the health care market is running well. And as the cognition of citizens' rights grows, the relationship between patient and physician can also get a lot of changes. Patients have the right to know the information about medical care, and to decide whether or not to get treatment including invasions against their own bodies. In other words, Doctors have an obligation to explain to their patients. If doctors did not provide patients sufficient explanation or information, it violates the right of patients. This is a tort, or a breach of contract. To improve the remedy for violation of patient's right, patient is able to be protected by status as consumer. If patient is a kind of consumer in terms of medical consumption, he/she as consumer can enjoy supplementally the consumer's right. The patient as a consumer can exercise now a consumer's right as a constitutional right. In addition, with respect to consumer's rights, Framework Act on Consumers was enacted. This Act is based on constitutional provisions of Article 124 and the Act can be seen as a law that embodies consumer right because the provision of the constitutional law delegates specific contents. In the health care field, patients need to win recognition the statue of the consumer to hold the sovereignty of the consumer. In particular, if patients are consumers, they may be able to make good use of the quickly and efficiently collective dispute resolution and association lawsuit to rescue their damage, the Alternative Dispute Resolution(ADR) of Framework Act on Consumers.

A Study on the Improvement of Long-Term Continuing Construction Contracts Dispute Using FGI (FGI를 활용한 장기계속공사계약 분쟁 개선방안 기초연구)

  • Kim, Jae-Sik;Lee, Jung-Won;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.79-87
    • /
    • 2023
  • Given that most government contracts are based on a fiscal year, long-term continuing construction contracts require appropriate provisions as significant amounts of budget is supposed to be invested for several years. This study drew problems and improvements of the long-term continuing construction contracts by analyzing the contents of FGI and list of construction order. We found that a number of problems, such as the mismatch between laws and enforcement decrees, difference in calculating overheads due to the extension of construction period, many construction orders that are hard to see as budget efficiency and over investment in the final annual contract, were tangled up in the process. To solve the problems mentioned, we suggested several improvements as follows: (1) effect of total construction period and total amount should be guaranteed by a law, (2) it is suggested that the scope of long-term continuing construction contract is determined by a law, and (3) it should be clear about the calculation of overheads concerned with the extension of construction period as well as the estimation of construction period to prevent over investment in the final contract.

Effective Handling of Construction Disputes for Strengthening the International Competitiveness of the Construction Industry (건설산업 국제경쟁력강화를 위한 건설분쟁처리절차 개선방안)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.3-11
    • /
    • 2020
  • Problems related to construction contracts arise if they are not reflected in the design phase from the planning phase of the construction project, or if they are not properly dealt with despite various changes in the construction phase. So far, there have been a number of discussions in Korea regarding the improvement of the procedures for resolving construction disputes, and the problems related to the procedures for solving construction disputes have been raised steadily, but the problems related to the procedures for solving construction disputes are still unresolved. Therefore, in this study, the followings were proposed to strengthen the international competitiveness of the construction industry. First, the so-called Construction Dispute Mediation Act should be enacted to prepare the basis for the establishment of a tentatively named Construction Dispute Mediation and Arbitration Agency(CDMA). Second, the work of the CDMA should be limited to the work of supporting the DRB, mediation and Arbitration the private and public sectors. Third, it is required to choose between adjustment and arbitration when obtaining a contract and to operate the DRB during construction phase. Fourth, CDMA should be established as standing bodies, and branches should be operated in various parts of the country. Fifth, construction experts from various areas should be included as members so that disputes over construction contracts can be dealt with quickly. And finally, relevant laws that specify the procedures for dealing with construction disputes should be amended together.

Solution of the Product Safety and Reliability responsive to Product Liability Prevention (PL 예방을 위한 제품안전 및 신뢰성 제고 방안)

  • Kim Jin-Gyu
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.31-36
    • /
    • 2002
  • Product Liability(PL) is a legal policy to deal with global competition by improving domestic industrial competitive power and to reduce the cost of defect products. The purpose of this paper is to address the state of the art solutions to dispute on PL, in reality of a frequent occurrence of global product exchange focussing on product safety that is one of the most important functions of PL and to improve solution of the product safety and reliability responsive to PL. To minimize PL exposure, manufacturers should reflect comprehensive product safety and reliability concepts in establishing PL prevention policies. PL prevention policies are composed of administration system, product safety management system, and total quality management system in respect of prevention, safety, and defence.

  • PDF

Product Liability Prevention Policies through the Improvement of Product Safety and Reliability (제품안전 및 신뢰성 향상을 통한 제조물책임 예방대책)

  • Kim, Jin-Kyu
    • IE interfaces
    • /
    • v.15 no.3
    • /
    • pp.270-278
    • /
    • 2002
  • Product Liability(PL) is a legal policy to deal with global competition by improving domestic industrial competitive power and to reduce the cost of defect products. The purpose of this paper is to address the state of the art solutions to dispute on PL, in reality of a frequent occurrence of global product exchange focussing on product safety that is one of the most important functions of PL and to improve solution of the product safety and reliability responsive to PL. To minimize PL exposure, manufacturers should reflect comprehensive product safety and reliability concepts in establishing PL prevention policies. Total PL prevention policies are composed of total quality management and product safety management system in respect of safety design, risk, and reliability. These PL prevention activities should be performed consistently during the total product life cycle, especially product research and development periods.

The Proposal of Reforming for Resolving Medical Malpractice Disputes (의료분쟁 해결제도의 개혁-미국 및 일본의 경험을 중심으로-)

  • 이규식
    • Health Policy and Management
    • /
    • v.1 no.1
    • /
    • pp.72-94
    • /
    • 1991
  • The number of disputes between physicians and patients caused by medical malpractice are showing a sharp increasing over the past several years. The disputes on medical malpractice may be resolved either in court or by direct negotiation between both sides concerned. There are no special acts relating to the civil or penal liability of the physicians in Korea. The medical disputes are decided merely through legal technicalities and without reference to actual medical practice. The current system which does not compensate injured patients adequately or equitably leads to taking a long time consuming for dispute resolution processes. The things make worsed, the problem is due to not being of insurance system or a proper funds for compensation. This research proposes a outline of new and comprehensive alternative for these problems and failure of conventional resolution of medical disputes. So far, we have learned lessons from the excperiencies of resolving medical malpractice disputes of Japan and the United States. The proposal first calls for an administrative arbitration and pretrial screening panels as a condition precedent to trial. The proposal also includes to facilitate with the funds for compensating the injured.

  • PDF

Pricing Strategy for Access Charge of IPTV Network : A Dynamic Analysis (IPTV 망 임대의 가격책정 전략 : 동태적 분석)

  • Kim, Dong-Hee;Cha, Jeong-Hyun;Oh, Jung-Suk;Kim, Soo-Wook
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.35 no.3
    • /
    • pp.45-58
    • /
    • 2010
  • Due to rapid developments of IT technologies, convergence services like IPTV (Internet protocol television) are shown up. Even though expert and customer had great expectations for this innovative service, commercialization was delayed for years by the legal dispute between industry players. One of the biggest problems was that whether internet backbone providers have to share their internet network backbone with IPTV service providers (which don't have network backbone) or not. As other countries, Korean government set the rules that ISP have to offer indiscriminate access to other IPTV service provider. At the same time, internet backbone providers can charge access charge based on cost by way of compensation. Thus access charge is very critical to the IPTV industry players. The objective of this paper is to provide model that can calculate the reasonable access charge by system dynamics, based upon real data in Korean telecommunication industry.

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

Development of Delay Responsibility Determination Model based on the Probabilistic Risk Analysis

  • Cho, Ji Hoon;Lim, Dong Yui;Kim, Sang Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.599-599
    • /
    • 2015
  • This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.

  • PDF