• Title/Summary/Keyword: Development Test

Search Result 18,882, Processing Time 0.04 seconds

A Study on Technique of Development Test by an Aircraft Captive Flight Test in Weapon System (무기체계의 항공기 탑재비행시험을 통한 개발시험 기법 연구)

  • Yeom, Hyeong-Seop;Oh, Jong-Hoon;Sung, Duck-Yong
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.37 no.10
    • /
    • pp.1010-1016
    • /
    • 2009
  • In this paper, we have described an aircraft captive flight test for the development test of weapon systems. We have conducted a captive flight test for the development of core onboard parts and sensors of airborne weapons and guided missiles. We have used KTX-1/XKO-1 aircraft as a platform for the captive flight test. In order to perform a captive flight test, we have made a captive test pod as a shape of external fuel tank in the XKO-1 and have modified XKO-1 aircraft for a system interface. We have taken a development test about all kinds of seekers, navigation & guidance systems, and core part of guided missile through the aircraft captive flight test.

On an Enhanced Model of System Readiness Level by Incorporating Safety for the Development of Live Fire Test Systems (실사격 시험시스템의 효율적인 개발을 위해 안전도 반영을 통해 개선된 시스템 성숙도 모델에 관한 연구)

  • Ye, Sung Hyuck;Lee, Jae-Chon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.195-204
    • /
    • 2015
  • The live fire test has been playing a critical role in evaluating the goals-to-meet of the weapon systems which utilize the power of explosives. As such, the successful development of the test systems therein is quite important. The test systems development covers that of ranges and facilities including system-level key components such as mission control, instrumentation or observation, safety control, electric power, launch pad, and so on. In addition, proper operational guidelines are needed with well-trained test and operation personnel. The emerging weapon systems to be deployed in future battle field would thus have to be more precise and dynamic, smarter, thereby requiring more elaboration. Furthermore, the safety consideration is becoming more serious due to the ever-increasing power of explosives. In such a situation, development of live fire test systems seems to be challenging. The objective of the paper is on how to incorporate the safety and other requirements in the development. To achieve the goal, an architectural approach is adopted by utilizing both the system components relationship and safety requirement when advanced instrumentation technology needs to be developed and deteriorated components of the range are replaced. As an evaluation method, it is studied how the level of maturity of the test systems development can be assessed particularly with the safety requirement considered. Based on the concepts of both systems engineering and SoS (System-of-Systems) engineering process, an enhanced model for the system readiness level is proposed by incorporating safety. The maturity model proposed would be helpful in assessing the maturity of safety-critical systems development whereas the costing model would provide a guide on how the reasonable test resource allocation plan can be made, which is based on the live fire test scenario of future complex weapon systems such as SoS.

(On-Line Test of High Speed Rail Development) (고속전철기술개발사업의 시운전시험계획)

  • 김석원;최강윤;김기환
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.376-384
    • /
    • 1999
  • In this paper, we introduce the on-line test plan of high speed rail development, which will be carried out at the test section of Seoul-Pusan high speed line from May to October, 2002. The test items are decided focused on the verification of the perofrmace and acquirement of the technical data of the high speed rail system development. The running time and distance of the train are calculated for several limited maximum speed cases. The detailed test scenario shall be developed according to the process of development and design of the system.

  • PDF

The Study of the Test and Evaluation Item Applies QFD in Research & Development Progject (연구개발사업에 QFD(품질기능전개)를 적용한 시험평가 항목 선정에 관한 연구)

  • Park, Jongwan;Lee, Jaewoo
    • Journal of Applied Reliability
    • /
    • v.18 no.2
    • /
    • pp.161-172
    • /
    • 2018
  • Purpose: Test & Evaluation items are main contents which verify performance of the development system and they are deduced going through project management system stages. However, there is no systematic or standardized framework for Test & Evaluation items, so a lot of differences occur between projects and people are questioning whether verification items are selected for the optimization of the development system. In this regard, this research proposes the process of deducing Test & Evaluation items in a systematic way during a development stage by applying QFD (Quality Function Deployment) technique which reflects customers' requirements. Methods: Test & Evaluation items are recognized as customers' requirements, and QFD technique which refines and gathers various requirements of customers effectively during general products' development stage is applied to complete HOQ (House of Quality) Conclusion: There is no specific methodology for Test & Evaluation items, so currently, they are selected by including items which are given by similar projects or higher authorities. However, by utilizing QFD technique, selection of evaluation items which goes through more systematic process is expected to be possible.

Development of Environmental Test Specifications for Aircraft Using Measured Vibration Data (항공기 실측 진동 데이터를 이용한 환경시험 규격 생성 연구)

  • Kim, Choonghyun;Song, Keehyeok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.24 no.3
    • /
    • pp.302-308
    • /
    • 2021
  • Developers generally use test standards suggested by military standards such as MIL-STD-810G when performing vibration tests in the materiel development. However, according to MIL-STD-810G, it is recommended to test by tailoring the test standard suitable for the developed materiel, and it is specified to apply the suggested test standard only when there is difficulty in tailoring. In addition, the test standards presented by MIL-STD-810G are standards created under operating conditions different from the actual operating environment of each developed materiel, so the test according to this standard may be excessive or understated. Therefore, the developer must create an appropriate vibration test standard for the developed materiel as similar to the operating conditions as possible. In this paper, the procedure for creating the functional test standard and durability test standard suitable for the operating environment of the equipment to be mounted on the propeller aircraft under development is described, and the created standard is introduced.

Development of Real-time Processing Measurement Device of the Vehicle Minimum Turning Circle Test (차량의 최소선회성능 시험의 실시간 계측 및 처리 장치 개발)

  • Ryu, Chiyoung;Lee, Jeonghwan;Cho, Jinwoo;Kang, Esok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.20 no.1
    • /
    • pp.48-54
    • /
    • 2017
  • A minimum turning circle test of vehicles is operated by using Real-Time Kinematic(RTK) surveying method which enhances the precision of the Global Positioning System(GPS). A procedure of the conventional method to obtain results is to take post processing after the test. Therefore, it is difficult to ensure results in an instant. This paper introduces developed process and equipment that can immediately obtain results after the minimum turning test without post processing.

An Overview of Thesaurus "TEST" (TEST 시소러스의 내용분석(內容分析))

  • Chun, Hak-Byoung
    • Journal of Information Management
    • /
    • v.23 no.1
    • /
    • pp.63-76
    • /
    • 1992
  • This is an overview of the TEST which effects on the development of thesaurus. Such term relations, display methods, classification schemes for the conventions of the thesaurus development are explained. This conventions of the TEST also effected on the ANSI guideline as well as UNESCO guideline for the thesaurus development. This explains on the development of microthesaurus through its application of TEST.

  • PDF

A Study on Development of Wireless Check-up Device for Captive Flight Test (탑재비행시험용 무선 점검장치 개발에 대한 연구)

  • Ryu, Sang-Gyu;Joo, Junghyun;Ko, Myoungjun
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.4
    • /
    • pp.501-508
    • /
    • 2019
  • In this paper, a study on a wireless check-up method of test equipment for captive flight test(CFT) was conducted. For CFT, test equipment is mounted on a POD, and check-up is carried on the test equipment's. For check-up the POD wirelessly, battery, power distribution unit, wireless communication devices were designed within the POD, and a check-up device is designed outside of the POD. Once the external check-up device sends a 'start signal' to the POD, it performs the overall check-up procedures and transmits the 'end signal' to the external check-up device. Detailed check-up results are stored in an internal storage device, and are possible to read from external check-up device if necessary, thereby improving the reliability of the wireless check-up. By implementing and applying these wireless check-up system, the reliability of the check-up was enhanced by dynamical and movable check-up, and safety is guaranteed as the check-up was carried without access to the aircraft.

A Study of the DEVOPS Test Automation Module for Integrated Development Environment (통합 개발환경에서 데브옵스 기반 테스트 자동화 모듈 개발에 대한 연구)

  • Jung Kwang Lak;Kim Sun Joo
    • Convergence Security Journal
    • /
    • v.22 no.1
    • /
    • pp.3-9
    • /
    • 2022
  • The role of the integrated development environment is very important in software development of a development project. After many developers develop different modules, software product is completed through compile, debugging, integration, testing, and distribution. However, bugs and various issues in the development process cause problems such as quality deterioration of software product and dissatisfaction with requirements. So the need for automated testing to avoid these problems and improve quality has increased. In this study, we propose test automation modules of four perspectives to improve quality throughout the test automation in an integrated development environment. Each automation module operates through the tool chain of an integrated build framework implemented on the devops.

EMC/LVD Compatibility Evaluation of ITER AC/DC Converter Subrack by EN 61000 and IEC 61010 (ITER AC/DC Converter 서브랙의 EN 61000 및 IEC 61010에 의한 EMC/LVD 시험평가)

  • Shin, Hyun-Kook;Oh, Jong-Seok;Song, In-Ho;Suh, Jae-Hak;Choi, Jung-Wan
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.26 no.3
    • /
    • pp.222-226
    • /
    • 2021
  • To comply with CE marking requirements, the electromagnetic compatibility (EMC) and low-voltage directive (LVD) tests are conducted on the sub-racks of International Thermonuclear Experimental Reactor (ITER) AC/DC converters and bypass switches. The EMC tests consist of a series of tests, including the electromagnetic interference test, the electromagnetic field immunity test, and the rapid transient burst immunity test. In the LVD test, the electric shock protection test, the xcessive temperature limit and heat resistance of equipment tests, and the fire spread prevention test are performed. This work presents and reviews the European Directive for EMC/LVD and introduces the methods of EMC and LVD tests for the sub-racks of AC/DC converters and bypass switches. It also evaluates the test method and results to meet the European Directive requirements for CE marking. The sub-racks of ITER AC/DC converters and bypass switches successfully pass the EMC and LVD tests.