• 제목/요약/키워드: Design-phase

검색결과 6,264건 처리시간 0.034초

설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 - (Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects -)

  • 이진웅;김태훈;조규만
    • 대한건축학회연합논문집
    • /
    • 제20권6호
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

계통 연계 3상 인버터를 위한 LCL 필터 설계 및 EMTP-RV 시뮬레이션 연구 (A Study on LCL Filter Design and EMTP-RV Simulation for Grid-connected Three Phase Inverter)

  • 고윤석
    • 한국전자통신학회논문지
    • /
    • 제16권2호
    • /
    • pp.261-270
    • /
    • 2021
  • 본 연구에서는 계통 연계 3상 인버터를 위한 LCL 필터를 설계 방법론을 연구하였다. 먼저, 대표적인 필터 구조들에 대해서 3상 인버터의 계통 연계를 위한 필터로서의 적용 시 장단점을 분석하였다. 다음, 3상 인버터의 계통 연계를 위한 필터 설계 방법론들을 분석하여 그리드 연계 시 고조파 요구 조건을 만족할 수 있는 효과적인 필터 설계 방법론을 결정하였다. 그리고 설계 방법론의 유효성을 확인하기 위해서 EMTP-RV를 이용하여 3상 인버터, LCL 필터 그리고 필터의 성능을 평가하기 위한 성능 평가 시스템을 모델링 하였다. 끝으로, 하나의 3상 인버터에 대한 LCL 필터를 설계하였으며, EMTP-RV 시뮬레이션 작업을 통해 3상 인버터의 출력 전류 리플의 크기가 제한됨을 확인함으로서 설계 방법론의 유효성을 검증할 수 있었다.

건축장 개념을 적용한 설계과정 연구 (The Study of the Process of Design on the Application of the Architectural Field Concept)

  • 이승용
    • 한국산학기술학회논문지
    • /
    • 제13권8호
    • /
    • pp.3698-3703
    • /
    • 2012
  • 건축설계과정은 프로그래밍 단계와 디자인 단계로 구분된다. 현대물리학 개념에 기초한 현대건축이론은 자료를 통합하는 디자인 단계에 적용되어 설계된다. 건축장 또한 디자인 단계에서 진행된다. 건축장은 건축장 특성으로 일체성, 상호성, 영역성을 구현하여 설계가 된다. 그리고 이 특성은 설계 시 고려하는 사항 및 접근하는 관점과 사고의 범위에 따라 영역성, 상호성, 일체성의 설계과정으로 진행이 된다. 영역성 설계는 주변 환경 및 구조물 등과 대지의 관계조직체계를 계획한다. 상호성 설계는 건축물이나 공간 등 상호 영향을 주고받는 상호간의 관계망을 계획한다. 일체성 설계는 공간과 건축물이 만나는 방식을 설계하는 것이다. 영역성과 상호성에서 설정된 설계 방향을 구현하고자 어떠한 방식이나 형상을 계획할 것인지에 관하여 구체적인 내용을 계획하게 된다. 결론적으로 건축장 특성을 정의하는 일련의 설계과정에 의하여 건축장이 만들어 진다.

어레이 마이크로폰용 광대역 소형 위상교정기의 설계 (Design of the broadband and compact phase-calibrator for array microphones)

  • 주형식;김양한
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 추계학술대회논문집
    • /
    • pp.1032-1035
    • /
    • 2004
  • Pressure distribution is measured by way microphones to identify noise sources in the space. For example, beam-forming method or acoustic holography use phase information to identify the source. Therefore, the phase is significant information to correctly identify the source position. However, due to the microphone characteristics and measuring systems, measured signals always have errors, which make the identification difficult. Therefore, phase calibration of microphones is needed. Duct and speaker systems are generally used as calibrators. Acoustic characteristics of the calibrator are, of course, functions of many Parameters of the system: i.e. duct size, frequency, and microphone spacing. In this paper, design parameters which effect on the performance and size of the calibrators are considered. Then the parameters would be applied to design and real product of the phase-calibrator.

  • PDF

송풍기 구동용 단상 SRM의 이론적 설계파라미터 산정 (Computation of theoretical design parameter of sin91e Phase SRM for a blower drives)

  • 이종한;이충원;이은웅;오영웅
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.88-90
    • /
    • 2003
  • SRM has a characteristic of a robust, simple structure and wide operating ranges. So, recently it has studied and developed in many kinds and forms with the technology of power electronics and analysis and design by use of computer. Also, It is used in a very wide range of industrial applications. In particular, single phase switched reluctance motor has a merit in practical use because it has simple operating drives and control systems, very high energy density per unit volume comparing with three phase SRM. But it must have a starting device. In this paper design procedures of single phase SRM development for blower drives are presented. It is selected the design parameters by compared with design theory of general electric machine and poly phase SRM. Also it is simulated the designed prototype model by FEM for the prediction of characteristics.

  • PDF

설계단계의 정보보호 활동 (Information Security Activities of The Design Phase)

  • 신성윤;김도관;;이현창;;박기홍
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2016년도 추계학술대회
    • /
    • pp.745-746
    • /
    • 2016
  • 설계 단계는 분석단계에서의 요구사항이 정보시스템으로 구현되기 위해 해석되고 구체화되는 과정이다. 설계 단계에서는 정보보호 설계, 정보보호 시험계획 수립 활동이 수행 된다.

  • PDF

설계VE팀의 역량평가 체크리스트에 관한 연구 (A Study on Competency Evaluation Checklist of Design Phase VE Team)

  • 서하나;이학기
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.154-162
    • /
    • 2008
  • 건설교통부에서는 2006년부터 "설계의경제성등검토"를 총공사비 100억원 이상으로 확대 시행하고 있으며, 이에 따라 건설공사의 예산낭비와 비효율적인 요인을 사전제거함에 따라 설계VE의 중요성이 대두되고 있다. 이러한 제도적 뒷받침이나 기술적인 노력에도 불구하고 국내에서 설계VE는 수행과정에서 다수의 문제점이 지적되고 있어 설계VE도입에 대한효과가 극대화되지 못하고 있다. 따라서 본 연구에서는 효과적인 팀을 구성하여 설계VE의 성과를 극대화하기 위하여 설계VE팀의 역량을 강화 할 수 있는 역량평가 체크리스트를 제시하고자 하였다. 이를 위하여 설계VE팀의 특성에 따른 29개의 역량인자를 도출하였으며 팀 지식, 팀워크 스킬, 팀 태도로 구분하였다. 중요도에 따라 설계VE팀의 역량평가 항목으로 도출하고, 각평가항목에 대한 상대적인 중요도를 정량화하여 설계VE팀의 역량평가에 객관적 인 기준을 제시할 수 있는 역량평가 방안 제시하였다.

Coupled Inductor Design Method for 2-Phase Interleaved Boost Converters

  • Liang, Dong;Shin, Hwi-Beom
    • Journal of Power Electronics
    • /
    • 제19권2호
    • /
    • pp.344-352
    • /
    • 2019
  • To achieve high efficiency and reliability, multiphase interleaved converters with coupled inductors have been widely applied. In this paper, a coupled inductor design method for 2-phase interleaved boost converters is presented. A new area product equation is derived to select the proper core size. The wire size, number of turns and air gap length are also determined by using the proposed coupled inductor design method. Finally, the validity of the proposed coupled inductor design method is confirmed by simulation and experimental results obtained from a design example.

설계단계에서의 BIM 안전설계 품질검토 (BIM Quality Assurance for DFS in Design Phase)

  • 권오철;조주원;조찬원
    • 한국CDE학회논문집
    • /
    • 제18권5호
    • /
    • pp.348-358
    • /
    • 2013
  • Since the safety accidents on the construction sites take large part of total industry disasters, research on the construction safety has been getting important. Recently, as BIM technology allows cooperation between designer and constructor groups, it becomes more active worldwide than before to study on the ways of accomplish construction safety improvement in the design phase. In this paper, we suggested a checklist for assuring construction safety in the phase of design, and performed automatic evaluation by using a BIM quality checking tool. This shows that it is possible for us to find out the construction safety has been improved in the design phase. Once the standard checklist and assurance process are developed, they are expected to play a great role of reducing disasters in the construction industry.

A Geometric Constraint Solver for Parametric Modeling

  • Jae Yeol Lee;Kwangsoo Kim
    • 한국CDE학회논문집
    • /
    • 제3권4호
    • /
    • pp.211-222
    • /
    • 1998
  • Parametric design is an important modeling paradigm in CAD/CAM applications, enabling efficient design modifications and variations. One of the major issues in parametric design is to develop a geometric constraint solver that can handle a large set of geometric configurations efficiently and robustly. In this appear, we propose a new approach to geometric constraint solving that employs a graph-based method to solve the ruler-and-compass constructible configurations and a numerical method to solve the ruler-and-compass non-constructible configurations, in a way that combines the advantages of both methods. The geometric constraint solving process consists of two phases: 1) planning phase and 2) execution phase. In the planning phase, a sequence of construction steps is generated by clustering the constrained geometric entities and reducing the constraint graph in sequence. in the execution phase, each construction step is evaluated to determine the geometric entities, using both approaches. By combining the advantages of the graph-based constructive approach with the universality of the numerical approach, the proposed approach can maximize the efficiency, robustness, and extensibility of geometric constraint solver.

  • PDF