• Title/Summary/Keyword: Database Construction

Search Result 1,433, Processing Time 0.031 seconds

BIM-Based VE Proposal Management Using Parametric Modeling (파라메트릭 모델링을 활용한 BIM기반 VE제안 관리 방안)

  • Kim, Dain;Choi, Jaehyun;Lee, Jin Gang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.163-164
    • /
    • 2023
  • The technical proposal bidding system emphasizes the evaluation of the construction company's technical capabilities, with the aim of improving the quality and cost-effectiveness of the construction. However, in the VE analysis and proposal process for technical proposal bidding, the ideas are often reused from similar past construction projects, and the application of new construction technologies/methods is often lacking. Therefore, this study proposes a methodology for managing VE proposal information by integrating it into a BIM model using parametric modeling. This research developed database based on the existing VE proposals and new construction technology/method information from the Korea Institute of Civil Engineering and Building Technology. And by using parametric modeling, the proposed method integrate the VE database with BIM model. The methodology proposed in this study is expected to improve the reliability and effectiveness of VE-related idea proposals in technical proposal bidding.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Digitalizing Technical Documents of Construction Projects Based on Database and XML (데이터베이스와 XML에 기반한 건설프로젝트 기술문서 전자화)

  • Jung Jong-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.190-198
    • /
    • 2005
  • This study describes the digitalization of technical documents of construction projects using database for storage and XML for exchange format on the web. First, for this purpose, the requirements for effective digitalization are identified. Second, the strategies for using database and XML are presented. These strategies include the way to store and search for the technical documents, to draw up the XML document for some parts of the technical documents, to arrange the components in their proper hierarchy, to manage the graphics and mathematical expressions in database and XML documents. Finally we discussed the validities of the results of this study by partial implementation for structural design sheets which has all the characteristics of technical documents.

Attributes for Developing a Database for Construction Information Interface

  • Moon, Sungwoo;Cho, Kyeongsu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.673-673
    • /
    • 2015
  • Earthwork is an operation that provides space for structures, and it takes up a large portion of the construction costs in a construction project. In large-scale earthwork, numerous types of construction equipment are used in the operation. The types of equipment should be selected based on the field conditions and the construction methods. These construction vehicles are constantly changing positions during the earthwork operation. Therefore, the equipment operators require effective communication to ensure the efficiency of the earthwork operation. All equipment operators should exchange information with the other equipment operators. Information should be exchanged continuously to support decision making and increase productivity during the earthwork operation at the construction site. This paper investigates the attributes required for an information interface between construction vehicles during an earthwork operation. This paper 1) discusses the importance of an information interface for construction vehicles in order to increase productivity during an earthwork operation, 2) analyses the types of attributes that need to be communicated between construction vehicles, and 3) provides a database that has been built for attribute control. The database built for the information interface between construction vehicles will enhance communication between vehicle operators. Table I shows the typical attributes that should be shared between the excavator operator and the dump truck operator. This information needs to be shared among the operators, as it helps them to plan the earthwork operation in a more efficient manner. A database has been developed to store this information in an entity relation diagram. A user-interface display environment is also developed to provide this information to the operators in the construction vehicles. The proposed interface can help exchange information effectively and facilitate a common understanding during the earthwork operation. For example, the vehicle operators will be aware of the planned volume, excavated volume, transportation time, and transportation numbers. As a part of this study, mobile devices, such as mobile phones and google glasses, will be used as hands-on communication tools.

  • PDF

A Study on Construction Method of Foreign Scientific Database by Utilizing Available Information Resources (가용자원을 활용한 해외학술정보 데이터베이스제작방법에 관한 연구)

  • 노경란;권오진
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2003.05a
    • /
    • pp.323-326
    • /
    • 2003
  • There are marv problems in conventional database Construction of foreign scientific journal from material aquisition to DB loading. This paper's purpose is to design database construction model which utilizes available information resources scattered several locations and uses agents technology to gather essential metadata efficiently. This paper describes component informations of foreign scientific database and related available resources. And it describes a process of DB construction that include metadata gathering method, automatic metadata classification method, and metadata quality monitoring method.

  • PDF

Development of the Management Software and Construction of Database for the Genetic Resources of Silkworms (누에유전자원 관리프로그램 개발 및 정보 DB화)

  • 손봉희;강필돈;이상욱
    • Journal of Sericultural and Entomological Science
    • /
    • v.43 no.1
    • /
    • pp.29-32
    • /
    • 2001
  • At present, more than 300 races of the Silkworm are conserved and used as valuable genetic resources. But because of the uneffectiveness of manual data management, faster and systematic data base construction is needed. So, development of silkworm genetic resources management program has been begun and the result can be practically used. When developing the program, Visual basic was used for data input system construction, and MS Access for database. IIS(Internet Information System) and ASP(Active Server Page) was also used for searching data and information with Internet Web Server and Web Browser which is comfortable for constructing database and providing information. Data input item consists of 46 practical characteristics such as race name, moltinism, larval period and pupation percentage etc.. And these characteristics are classified with qualitative and quantitative character. Photographs of silkworm, cocoon and other related items were scanned and the image data was recorded on the database.

  • PDF

Development of the Quality Management Software of Spatial Database (공간데이터베이스 품질유지관리 소프트웨어 개발)

  • 최병길;조광희
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2003.04a
    • /
    • pp.285-290
    • /
    • 2003
  • This study is aimed at standardizing the process of spatial database construction and developing a software tool for process management. Knowhow of five GIS firms and provisions of NGI(National Geography Institute) were analyzed. In this study, the process of spatial database construction was standardize. The system from this study has the capability to manage the process of construction database using GIS and to deal with the metadata of unit map, generated from the process, systematically and continuously The process was also shown by using either Gantt chart or PERT chart after developing an interface for "MS Project". A software "Visual Basic for Application" was used for this study.

  • PDF

A Database Model for Financial Feasibility Study of Buildings Offered for Sale (분양형 건축물의 재무적 타당성검토를 위한 데이터베이스 모델)

  • Oh Hyun-Suk;Jung Jae-Gwan;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.577-580
    • /
    • 2003
  • The purpose of this study was to make a database model for financial feasibility study of buildings offered for sale which is helpful for improvement of business ability in construction and confidence of a project from a related participant. At first, we studied several thesis and met some professionalist which work for construction and did a first survey for examining latest situation of a feasibility study in construction. As a result, even though feasibility study is important, factors for information management wasn't systemized. So we did a second survey for fixing Factors of the database model. The database model was composed of the factors that we got from the second survey. ER(Entity-Relationship) analysis was used to making it. We expect thar we can get more reasonable information to study financial feasibility study and can diminish risks of project through the database model. So the result of this study was to make a database model for more reasonable financial feasibility study of building offered for sale.

  • PDF

Mapping IFC to Object-oriented Relational Database (IFC의 객체기반 관계형 데이터베이스로의 매핑)

  • Kim, Seon-Woo;Lee, Ghang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.301-305
    • /
    • 2007
  • Mapping of EXPRESS, which is object-favored language to represent IFC model, to Relational Database is not straightforward. Model size can be much bigger and data can be missed through process. However mapping to the object concept added database, such as Object Oriented Database or Object Relational Database, may be simpler and have lots of advantages. This study investigates previous IFC mapping studies, concept of Relational Database and Object Oriented Database, and mapping methodology to Object Relational Database using object.

  • PDF

Database Program for Managing Management Resources: General Contractor's Perspectives

  • Yong-Woo Kim;Sungwon Shin
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1100-1106
    • /
    • 2009
  • General contractors' overhead costs are increasing relative to direct costs. However, it is difficult to apply the traditional activity-based costing directly to the construction site overhead costing because the resource consumption rate per each activity is varied depending on the attributes of activities. The research develops a methodology of hybrid cost allocation system when resources are assigned to cost objects unlike the traditional activity-based costing. The study also develops a database program and demonstrates how it can be applied to the construction projects using a case study.

  • PDF