• Title/Summary/Keyword: Database Construction

Search Result 1,433, Processing Time 0.025 seconds

Comparison of Liquefaction Assessment Results with regard to Geotechnical Information DB Construction Method for Geostatistical Analyses (지반 보간을 위한 지반정보DB 구축 방법에 따른 액상화 평가 결과 비교)

  • Kang, Byeong-Ju;Hwang, Bum-Sik;Bang, Tea-Wan;Cho, Wan-Jei
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.4
    • /
    • pp.59-70
    • /
    • 2022
  • There is a growing interest in evaluating earthquake damage and determining disaster prevention measures due to the magnitude 5.8 earthquake in Pohang, Korea. Since the liquefaction phenomena occurred extensively in the residential area as a result of the earthquake, there was a demand for research on liquefaction phenomenon evaluation and liquefaction disaster prediction. Liquefaction is defined as a phenomenon where the strength of the ground is completely lost due to a sudden increase in excess pore water pressure caused due to large dynamic stress, such as an earthquake, acting on loose sand particles in a short period of time. The liquefaction potential index, which can identify the occurrence of liquefaction and predict the risk of liquefaction in a targeted area, can be used to create a liquefaction hazard map. However, since liquefaction assessment using existing field testing is predicated on a single borehole liquefaction assessment, there has been a representative issue for the whole targeted area. Spatial interpolation and geographic information systems can help to solve this issue to some extent. Therefore, in order to solve the representative problem of geotechnical information, this research uses the kriging method, one of the geostatistical spatial interpolation techniques, and constructs a geotechnical information database for liquefaction and spatial interpolation. Additionally, the liquefaction hazard map was created for each return period using the constructed geotechnical information database. Cross validation was used to confirm the accuracy of this liquefaction hazard map.

Study on Risk Priority for TBM Tunnel Collapse based on Bayes Theorem through Case Study (사례분석을 통한 베이즈 정리 기반 TBM 터널 붕괴 리스크 우선순위 도출 연구)

  • Kwon, Kibeom;Kang, Minkyu;Hwang, Byeonghyun;Choi, Hangseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.785-791
    • /
    • 2023
  • Risk management is essential for preventing accidents arising from uncertainties in TBM tunnel projects, especially concerning managing the risk of TBM tunnel collapse, which can cause extensive damage from the tunnel face to the ground surface. In addition, prioritizing risks is necessary to allocate resources efficiently within time and cost constraints. Therefore, this study aimed to establish a TBM risk database through case studies of TBM accidents and determine a risk priority for TBM tunnel collapse using the Bayes theorem. The database consisted of 87 cases, dealing with three accidents and five geological sources. Applying the Bayes theorem to the database, it was found that fault zones and weak ground significantly increased the probability of tunnel collapse, while the other sources showed low correlations with collapse. Therefore, the risk priority for TBM tunnel collapse, considering geological sources, is as follows: 1) Fault zone, 2) Weak ground, 3) Mixed ground, 4) High in-situ stress, and 5) Expansive ground. In practice, the derived risk priority can serve as a valuable reference for risk management, enhancing the safety and efficiency of TBM construction. It provides guidance for developing appropriate countermeasure plans and allocating resources effectively to mitigate the risk of TBM tunnel collapse.

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

A Study of Traffic Noise Characteristics on the National Highways (일반국도의 교통소음특성에 관한 연구)

  • Son, Hyeon Jang;An, Deok-Soon;Baek, Cheolmin;Kwon, Soo-Ahn;Lee, Jaejun
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.11-18
    • /
    • 2013
  • PURPOSES : This study presents the noise level and frequency characteristics investigated in the national highways with the consideration of various measuring conditions and/or methods. METHODS : The noise levels on the asphalt concrete pavement(ACP) and the jointed plain concrete pavement(JPCP) of the national highway were measured and analysed with respect to three variables, i.e., pavement type, surface condition, and measurement distance. The PASS-By method is utilized for the noise measurement and then using CPB spectrum analysis method with 1/3 octave bandwidth, the noise levels and frequency characteristics were calculated for two-second periods before and after the peak noise. RESULTS : Depending on the pavement type, the noise level was changed as the average noise levels are 73.3dB(A) and 78.3dB(A) for ACP and JPCP, respectively. With respect to the effect of surface condition, the average noise levels for crack H(high), M(medium), and L (low) sections are 77.4dB(A), 77.4dB(A), and 78.1dB(A), respectively. Regarding the measurement distance, 1.2meter difference in measuring location reduces 1.6dB(A) of noise level; the average noise levels at 5.3m and 7.5m from the centerline of outer lane are 72.8dB(A) and 71.2dB(A), respectively. It should be noted that the noise levels are slightly different as a function of vehicle speed and type. However, the overall trends for each case was similar. It was found that the domain frequency bands for ACP and JPCP were 400Hz~2000Hz and 500Hz~2000Hz, respectively. CONCLUSIONS : Based on the analysis with the measured noise date from national highway, it was concluded that the noise level and frequency band vary depending on the various conditions. It was also found that some variables significantly affect the noise level while others do not. With further systematic investigation, the comprehensive noise characteristics on the national highway can be achieved. Using such database, it is possible to develop the fundamental noise reduction technology.

Prioritizing of Civil-BIM DB Construction based on Geo-Spatial Information System (지형공간정보체계 기반의 토목-BIM DB구축 우선순위 선정)

  • Park, Dong Hyun;Kang, In Joon;Jang, Yong Gu;Lee, Byung Gul
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.23 no.1
    • /
    • pp.73-79
    • /
    • 2015
  • Recently, BIM proliferates at high speeds so that BIM planning is trying to be used in various kinds of engineering. However, when using different software during design phase and construction phase, the problem of mutual compatibility is coming out. Even the BIM technology has been used or the practical applicability has been made into result, it would be fair to say that BIM has limitations in the visual level. In this research, it is meaningless to obtain the BIM result as the primary purpose. As the usefulness of it is judged incomplete, we committed to master the trend and problems of terrain spatial information systems and BIM. Furthermore, the plan of building the BIM in the civil field, especially the civil-BIM based on the technology ofterrain spatial information has been presented. It can be judged through this research that the high-capacity DB of BIM occurred during the whole process may cause poor performance of the following stage the structure system which connects the terrain spatial information and civil-BIM. In order to manage the optimal full cycle, the spatial analysis technology of the stages after choosing the DB has been described.

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members (합성 PC부재에 의한 그린 프레임의 철근물량 산출 자동화 알고리즘)

  • Lee, Sung-Ho;Kim, Seon-Hyung;Lee, Goon-Jae;Kim, Sun-Kuk;Joo, Jin-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.118-128
    • /
    • 2012
  • As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.

Analysis of Modeling Errors for BIM-based Facility Management Systems (BIM기반 시설물유지관리시스템을 위한 모델링 오류 분석)

  • An, Hyokyung;Lee, Seulki;Yu, Jungho;Son, Bosik;Jang, Hyounseung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.35-45
    • /
    • 2013
  • Facility Management is the longest in the building of life cycle. Because it occupies more than 80% of cost, the phase of Facility Management has to be managed and has to be perceived as important as design and construction phase. The method to manage building more efficiently is the introduction of Facility Management System used by CAD and database. But information Requirement is now input by hand in the most Facility Management System. This study aims to analyze the example of applying BIM in the Korea or abroad and the errors of this were deducted by many phase. Lastly, the possible solution is suggested in order to be used in the Facility Management System. This study's benchmarking is COBIE which is developed by the COE(Corps of Engineers) and now popular in the world. The suggestion in this study is the method that I have already mentioned is helpful for a designer to do modeling when a designer uses BIM S/W(software). To be more specific, the method plays a side role in helping data input considering the phase of Facility Management.

Construction of Correlation between Basic Soil Properties and Deformation Modulus of Trackbed Soils Based on Laboratory and Field Mechanical Tests (역학적 실내외 시험에 의한 철도궤도 상부노반용 흙재료의 기본물성과 변형계수 상관성 평가)

  • Park, Jae Beom;Choi, Chan Yong;Ji, Sang Hyun;Lim, Sang Jin;Lim, Yu Jin
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.204-212
    • /
    • 2016
  • The soils used as trackbed in Korea are selected using USCS utilizing basic soil properties such as Grain Size Distribution(GSD), % passing of #200 sieve ($P_{200}$), % passing of #4 sieve ($P_4$), Coefficient of uniformity ($C_u$), and Coefficient of curvature ($C_c$). Degree of compaction of the soils adapted in the code by KR should be evaluated by maximum dry density (${\gamma}_{d-max}$) and deformation modulus $E_{v2}$. The most important influencing factor that is critical to stability and deformation of the compacted soils used as trackbed is stiffness. Thus, it is necessary to construct a correlation between the modulus and the basic soil properties of trackbed soil in order to redefine a new soil classification system adaptable only to railway construction. To construct the relationship, basic soil test data is collected as a database, including GSD, maximum dry unit weight (${\gamma}_{d-max}$), OMC, $P_{200}$, $P_4$, $C_u$, $C_c$, etc.; deformation modulus $E_{v2}$ and $E_{vd}$ are obtained independently by performing a Repeated Plated Bearing Test (RPBT) and Light Weight Deflectometer Test (LWDT) for ten different railway construction sites. A linear regression analysis is performed using SPSS to obtain the relationship between the basic soil properties and the deformation modulus $E_{v2}$ and $E_v$. Based on the constructed relationship and the various obtained mechanical test data, a new soil classification system will be proposed later as a guideline for the design and construction of trackbed foundation in Korea.

Estimation of Resistance Bias Factors for the Ultimate Limit State of Aggregate Pier Reinforced Soil (쇄석다짐말뚝으로 개량된 지반의 극한한계상태에 대한 저항편향계수 산정)

  • Bong, Tae-Ho;Kim, Byoung-Il;Kim, Sung-Ryul
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.6
    • /
    • pp.17-26
    • /
    • 2019
  • In this study, the statistical characteristics of the resistance bias factors were analyzed using a high-quality field load test database, and the total resistance bias factors were estimated considering the soil uncertainty and construction errors for the application of the limit state design of aggregate pier foundation. The MLR model by Bong and Kim (2017), which has a higher prediction performance than the previous models was used for estimating the resistance bias factors, and its suitability was evaluated. The chi-square goodness of fit test was performed to estimate the probability distribution of the resistance bias factors, and the normal distribution was found to be most suitable. The total variability in the nominal resistance was estimated including the uncertainty of undrained shear strength and construction errors that can occur during the aggregate pier construction. Finally, the probability distribution of the total resistance bias factors is shown to follow a log-normal distribution. The parameters of the probability distribution according to the coefficient of variation of total resistance bias factors were estimated by Monte Carlo simulation, and their regression equations were proposed for simple application.

A Study on the Utilization of Drilling Investigation Information (시추조사 정보 활용방안에 관한 연구)

  • Jinhwan Kim;Yong Baek;Jong-Hyun Lee;Gyuphil Lee;Woo-Seok Kim
    • The Journal of Engineering Geology
    • /
    • v.33 no.4
    • /
    • pp.531-541
    • /
    • 2023
  • The most important thing in the 4th industry, AI era, and smart construction era is digital data. Basic data in the civil engineering field begins with ground investigation. The Ministry of Land, Infrastructure and Transport operates the Geotechnical Information Database Center to manage ground survey data, including drilling but the focus is on data distribution. This study seeks to devise a plan for long-term use of the results of drilling investigation conducted for the design and construction of various construction projects. For this purpose, a pilot area was set up and a 'geotechnical design parameters digital map' was created using some geotechnical design parameters from the drilling investigation data. Using the developed algorithm, a digital map of friction angle and permeability coefficient for the hard rock stratum in the pilot area was created. Geotechnical design parameters digital map can identify the overall condition of the ground, but reliability needs to be improved due to the lack of initial data input. Through additional research, it will be possible to produce a more complete geotechnical design parameters digital map.