Browse > Article
http://dx.doi.org/10.6106/KJCEM.2012.13.1.118

Automatic Algorithms of Rebar Quantity Take-Off of Green Frame by Composite Precast Concrete Members  

Lee, Sung-Ho (경희대학교 대학원 건축공학과)
Kim, Seon-Hyung (경희대학교 대학원 건축공학과)
Lee, Goon-Jae (경희대학교 대학원 건축공학과)
Kim, Sun-Kuk (경희대학교 건축공학과)
Joo, Jin-Kyu (신동아건설)
Publication Information
Korean Journal of Construction Engineering and Management / v.13, no.1, 2012 , pp. 118-128 More about this Journal
Abstract
As the bearing wall structure, which has been widely applied to domestic apartment buildings since the 1980s, cause many problems during remodeling of buildings, the government encourages constructors to adopt flat plate or rahmen structure through legal incentives. In line with such a trend, the green frame, an eco-friendly rahmen structure that has removed the shortcomings of previous structures, was developed to enhance structural safety, constructability, and eco-friendliness. The construction of green frame can reduce the labor cost and facilitate the composition of iron bars to reduce rebar loss through calculating the quality and establishing the bar bending schedule automatically on the precast concrete member data collected over the design phase. Therefore, the purpose of this study is to develop the algorithm to automate the calculation of iron bar volume for the green frame designed on composite precast concrete members. Automated algorithm to calculate concrete structural design information and design information. Practices through the application site should prove efficacy. The database established by the developed algorithm will automate the establishment of iron bar processing map and bar cutting list and the calculation of optimal composition and order volume to minimize the rebar loss. This will also reduce the expenses on management staff and overall construction cost through the minimization of rebar loss.
Keywords
PC Members; Green Frame; Quantity of Rebar; Automation; Algorism;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 조훈희, 박우열, 강태경, 박현용, 윤석현, 허영기 (2007), 철근 공사의 공장가공 현황분석과 활성화 방안, 한국건설관리학회논문집, 제8권 1호, pp 57-65
2 홍원기, 김선국, 김형근, 윤태호, 윤대영, 김승일 (2010), 저탄소 및 장수명 공동주택 구현을 위한 Green Frame(GF)의 타당성 분석, 한국건축시공학회 논문집 제10권 1호, pp 57-63
3 SH공사 (2010), 100년 가는 장수명주택을 위한 Green Frame 설계매뉴얼
4 김광희, 박우열, 강경인 (2002), 국내 건축물 철근공사 품질.원가 개선을 위한 시스템 개발에 관한 연구, 대한건축학회논문집, 제18권 5호, pp 121-128
5 김동진, 김욱종 (1991), 철근공사 공장가공 합리화 방안, 대한건축학회 춘계학술발표대회 논문집, 제24권 1호, pp 419-422
6 2004김선국, 김문한, 철근 손율을 줄이기 위한 최적화 알고리즘 개발에 관한 연구, 대한건축학회논문집, 제7권 3호, pp 385-391
7 박우열, 김광희, 강경인 (2004), 국내 철근공사 실태분석 및 개선방안에 관한 연구, 한국건축시공학회논문집, 제4권 3호, pp 83-91
8 이승근, 저탄소 장수명 (2009), 공동주택의 공법 개발 및 타당성 분석, 경희대학교 일반대학원 석사학위 논문
9 박현용, 이승현, 강태경, 이유섭 (2008), 설치 위치 정보를 포함한 배근시공상세도 작성 및 가공철근 자동 물량산출 시스템 개발, 한국건축시공학회논문집, 제8권 2호, pp 63-70,