• Title/Summary/Keyword: Cycle Structure

Search Result 1,518, Processing Time 0.036 seconds

Study on The Preventive Structure of field Lead Connector's V-Notch on Synchronic (동기발전기 회전자 계자접속부의 예각변형 방지구조에 관한 연구)

  • Cho, Ji-Won;Cho, Chang-Joo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.937-939
    • /
    • 2000
  • The preventive structure of field lead connector's V-notch on synchronous generator has been developed. The preventive structure of field lead, installed in the generator, prevent from V notch of field lead connector in rotor on daily start and stop (on-line). This development of study was performed at the Seoinchon combined cycle power plant on gas turbine generator. This preventive structure of field lead will be prevent from V-notch of field lead on synchronous generator's field.

  • PDF

The Effect of Trade Integration on Business Cycle Synchronization in East Asia

  • NGUYEN, Vinh Thi Hong;HOANG, Thuy Thi Thanh;NGUYEN, Sang Minh
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.225-231
    • /
    • 2020
  • The paper aims to investigate the impact of trade integration on business cycle synchronization for the East Asian countries during 2005- 2017 based on the endogeneity hypothesis of Optimum Currency Area criteria. We test the determinants of business cycles by calculating bilateral trade, financial integration, and business cycle synchronization. Applying the system Generalized Method of Moments for dynamic panel data models, the results show that business cycle synchronization is highly associated with trade and financial integration. These findings confirm the endogeneity hypothesis that more trade integration will mitigate asymmetric shocks, and have a positive impact on the business cycle synchronization. The increased trade intensity and financial linkage lead to more correlated business cycles in East Asia. Apart from trade and financial integration, the trade structure differential, monetary policy similarity also influence the business cycle comovement. The significantly negative impact of trade structure differential on business cycle synchronization suggests that countries with less similar structures are more likely to undergo asymmetric shocks. The results also indicate that monetary policy matters for output comovement. This study recommends that the East Asian countries should focus on bilateral trade as well as financial integration with each other to reap benefits from the integration process.

DLL Design of SMD Structure with DCC using Reduced Delay Lines (지연단을 줄인 SMD 구조의 DCC를 가지는 DLL 설계)

  • Hong, Seok-Yong;Cho, Seong-Ik;Shin, Hong-Gyu
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.6
    • /
    • pp.1133-1138
    • /
    • 2007
  • DLLs(Delay Locked Loops) have widely been used in many systems in order to achieve the clock synchronization. A SMD (Synchronous Mirror Delay) structure is used both for skew reduction and for DCC (Duty Cycle Correction). In this paper, a SMD based DLL with DCC using Reduced Delay Lines is proposed in order to reduce the clock skew and correct the duty cycle. The merged structure allows the forward delay array to be shared between the DLL and the DCC, and yields a 25% saving in the number of the required delay cells. The designed chip was fabricated using a $0.25{\mu}m$ 1-poly, 4-metal CMOS process. Measurement results showed the 3% duty cycle error when the input signal ranges from 80% to 20% and the clock frequency ranges from 400MHz to 600MHz. The locking operation needs 3 clock and duty correction requires only 5 clock cycles as feature with SMD structure.

Effects of Electroplating Current Density and Duty Cycle on Nanocrystal Size and Film Hardness

  • Sun, Yong-Bin
    • Journal of the Semiconductor & Display Technology
    • /
    • v.14 no.1
    • /
    • pp.67-71
    • /
    • 2015
  • Pulse electroplating was studied to form nanocrystal structure effectively by changing plating current density and duty cycle. When both of plating current density and duty cycle were decreased from $100mA/cm^2$ and 70% to $50mA/cm^2$ and 30%, the P content in the Ni matrix was increased almost up to the composition of $Ni_3P$ compound and the grain growth after annealing was retarded as well. The as-plated hardness values ranging from 660 to 753 HV are mainly based on the formation of nanocrystal structure. On the other hand, the post-anneal hardness values ranging from 898 to 1045 HV, which are comparable to the hardness of hard Cr, are coming from how competition worked between the precipitation of $Ni_3P$ and the grain coarsening. According to the ANOVA and regression analysis, the plating current density showed more strong effect on nanocrystal size and film hardness than the duty cycle.

An Analysis on Cost Factor Reduction of Life Cycle for High Speed Train(KTX-1) Based on the Maintenance Information (유지보수정보를 활용한 고속철도차량(KTX-1) 수명주기비용 요소절감 분석)

  • Kim, Jae-Moon;Kim, Yang-Su;Chang, Chin-Young;Lee, Jong-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2169-2170
    • /
    • 2011
  • This paper presents about the analysis on cost factor reduction using the life cycle cost model for motor block in the KTX-1. Until now, most life cycle cost of the system as a whole that has been studied. but in case of railway industry part, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. Therefore, In this paper presents cost breakdown structure for life cycle cost (LCC) estimation for localization development of propulsion control system (Motor Block) in high speed railway vehicle (KTX-1). Also to analysis LCC on motor block, it was analyzed physical breakdown structure (PBS) and preventive cost on propulsion control system in view of maintenance cost. Based on this, we describe life cycle cost on motor block of KTX-1.

  • PDF

A Study on the Development of Life Cycle Cost Analysis Methodology in HVAC system for Decision Maker (의사 결정자를 위한 HVAC 시스템의 LCC 분석 방법론 개발에 관한 연구)

  • Jung, Soon-Sung
    • Journal of the Korean Solar Energy Society
    • /
    • v.24 no.4
    • /
    • pp.55-63
    • /
    • 2004
  • The purpose of this study is to development of life cycle cost analysis methodology of HVAC system for decision maker. The results of this study are as follows; maintenance/management, equipment construction, planning/design, and demolition/sell phases (1) To develop the cost breakdown structure for LCC in HVAC system, this study apply the method of additional pertinent level, title, CBS number, block number and variable index. (2) LCC analysis order of HVAC system compose four phase. (3) Life cycle costing influence diagram can bring us to make the most efficient decision through a visual graphical diagram that is shown relationship among variables and that decision maker traces easily from life cycle cost analysis situation.

Low-power/high-speed DCT structure using common sub-expression sharing (Common sub-expression sharing을 이용한 고속/저전력 DCT 구조)

  • Jang, Young-Beom;Yang, Se-Jung
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.29 no.1C
    • /
    • pp.119-128
    • /
    • 2004
  • In this paper, a low-power 8-point DCT structure is proposed using add and shift operations. Proposed structure adopts 4 cycles for complete 8-point DCT in order to minimize size of hardware and to enable high-speed processing. In the structure, hardware for the first cycle can be shared in the next 3 cycles since all columns in the DCT coefficient matrix are common except sign. Conventional DCT structures implemented with only add and shift operation use CSD(Canonic Signed Digit) form coefficients to reduce the number of adders. To reduce the number of adders further, we propose a new structure using common sub-expression sharing techniques. With this techniques, the proposed 8-point DCT structure achieves 19.5% adder reduction comparison to the conventional structure using only CSD coefficient form.

Gametogenic Cycle and Fine Structure of Ripe Germ Cells in the Pacific Oyster, Crassostrea gigas on the South Coast of Korea

  • Choi Youn Hee;Kim Tae Ik;Hur Young Baek;Go Chang-Soon;Chang Young Jin
    • Fisheries and Aquatic Sciences
    • /
    • v.6 no.2
    • /
    • pp.51-58
    • /
    • 2003
  • The gonadal development and the gametogenic cycle and the fine structure of ripe germ cells of the cultured Pacific oyster, Crassostrea gigas were investigated using oysters monthly collected from the southern coast of Korea from October 2000 to September 2001. Monthly changes in the condition index were similar to that of meat weight rate and the highest value was observed in between April and May, and the lowest value in August. The external colors of the testis and the ovary were milky white and yellowish, respectively. The spawning period of the Pacific oyster was continued from May to September, with a peak in July. The gametogenic cycle could be classified into five successive stages: multiplicative stage (December to March), growing stage (March and April), mature stage (April to June), spawning stage (June to August) and resting stage (August to January). Variety of egg yolk granules, lipid granules, mitochondria, and endoplasmic reticula were observed in cytoplasm of ripe oocyte. The spermatozoon consisted of the head, middle piece and tail; including cap-shaped acrosome with domed structure, elliptical shaped nucleus, four mitochondria, two centrioles and flagellum.

Life-cycle-cost optimization for the wind load design of tall buildings equipped with TMDs

  • Venanzi, Ilaria;Ierimonti, Laura;Caracoglia, Luca
    • Wind and Structures
    • /
    • v.30 no.4
    • /
    • pp.379-392
    • /
    • 2020
  • The paper presents a Life-Cycle Cost-based optimization framework for wind-excited tall buildings equipped with Tuned Mass Dampers (TMDs). The objective is to minimize the Life-Cycle Cost that comprises initial costs of the structure, the control system and costs related to repair, maintenance and downtime over the building's lifetime. The integrated optimization of structural sections and mass ratio of the TMDs is carried out, leading to a set of Pareto optimal solutions. The main advantage of the proposed methodology is that, differently from the traditional optimal design approach, it allows to perform the unified design of both the structure and the control system in a Life Cycle Cost Analysis framework. The procedure quantifies wind-induced losses, related to structural and nonstructural damage, considering the stochastic nature of the loads (wind velocity and direction), the specificity of the structural modeling (e.g., non-shear-type vibration modes and torsional effects) and the presence of the TMDs. Both serviceability and ultimate limit states related to the structure and the TMDs' damage are adopted for the computation of repair costs. The application to a case study tall building allows to demonstrate the efficiency of the procedure for the integrated design of the structure and the control system.

A Linkage Method for the Life Cycle Cost Breakdown Structure through an Analysis of Boundary Conditions (경계조건 분석을 통한 LCCBS 연계방안)

  • Jeong, Jae-Hyuk;Kim, Tae-Hui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.321-332
    • /
    • 2013
  • Costs and expenses are intertwined and incurred throughout an entire construction project, even from the pre-construction phase, and each phase has a different impact on the life cycle cost (LCC). However, the cost breakdown structure (CBS) is different in each phase of a building construction project, which makes it hard to reasonably calculate construction cost. For this reason, the boundary conditions were analyzed in this study based on the life cycle cost break structure (LCCBS). In addition, breakdown factors were analyzed based on the boundary conditions to derive a linkage method. The validity of the linkage method was verified through application to actual construction projects. Through the analysis, it was found that the problem of items being left out was reduced by more than 97.2 percent, and the work was done an average of 6 hours faster compared to the conventional method. It is expected that by applying the new LCC system, LCC will be both reduced and calculated in a more efficient manner.