Journal of the Korean Society of Environmental Restoration Technology
/
v.19
no.2
/
pp.121-135
/
2016
The present study is an analysis of the monitoring results of the four areas that underwent the experimental construction of Straw-net+seedspray, Vegetation media spray method(t=2cm), and Vegetation media spray method(t=3cm), with the purpose of selecting the adequate revegetation of cutting slopes in weathered granite soil. Cutting slopes are mostly designed in the Straw-net+seedspray method, but since weathered granite soil slopes tend to have an infertile soil quality that runs down, it is difficult for seed germination and growth. It is difficult to apply Straw-net+seedspray to weathered granite soil slopes considering the germination rate and coverage rate of the Straw-net+seedspray method, which accompanies erosion and scouring. The final conclusions are summarized as follows. First, Straw-net+seedspray has difficulty recruiting plants to infertile weathered granite soil, which results in a lower coverage rate and fewer species, so it is not adequate construction method. Second, Vegetation spraying methods with wet media are more advantageous in early revegetation. The wet construction methods are faster than the dry construction methods in terms of early germination and its early growth are more excellent. Third, when constructing Vegetation spray methods with dry media, it were more advantageous if the thickness was thicker. When the soil-media is thicker, the soil is resilient to droughts, so the thickness must be flexibly applied according to the soil quality and slant of the weathered granite soil slope. The present study is a monitoring result for some areas of Gangwon-do, so its results may differ from other areas.
Among 28 land Categories, 'road' is that most frequently established or transformed. Like that of other 27 land categories, the boundary of road should be defined by boundary making principles and then fixed by cadastral laws. But, some criteria to determine the land boundary, especially in boundary making rule which can be used by geographical features, is confused partly in Land Use Planning stages. Because the purpose of making any rules in fixing road boundary may be misinterpreted, the gap between law and real land boundary can be occurred. Those related rules in determining the land boundary must be improved urgently. Cut surface' or 'slope' should be conformed as a legal term and I suggest that 'Structures' must be changed to 'geographical features'.
The mechanical behavior of the underground box culvert constructed by the open cut method depends mainly on the earth pressure acting on it. In this study, the earth pressure on the underground box culverts constructed by the open cut method during and after the construction sequence was numerically analysed by using FLAC. The results are compared with those of the Marston-Spangler's theory, silo theory, and the model tests. The results showed that the vertical earth pressure on the upper slab of the box structure was not uniform. It was as large as the overburden in the middle part of the slab but was smaller or larger than that at its end part depending on the slope of the excavation, the depth of the cover, and the width of the side refill. The horizontal earth pressure on the side wail was much smaller than the earth pressure at rest and grew nonlinearly with the depth.
Songgwang lead zinc mine is located in about 12km to the north-east of Jeonju City. Geology of the mine and its visinity is consisted of Jeonju series belonged to so-called Okcheon system, Seodaesan tuff formation, Silla series, and the quartz porphyry intruded into these formations. Jeonju series comprising 3 formations; that is, of Sadaeri, Sindong, and Girinbong. Jeonju series is generally distributed in southern part of the area, striking NNW, and diping NE $30^{\circ}$, or NW $30^{\circ}$. It is deformed to form synclinorium and anticlinorium plunging to the north with low angle. In the northern part of the area, Jeonju series was cut by Sinpeongri-fault of NEE direction near Sinpeongri. In the north side of the fault, it is overturned and shows NEE or NWW strikes and NW $60^{\circ}$ dips. At the west of Songgwangri, it is cut by 3 thrusts; the two are almost parallel each other, and the third oneis manifested by the fact that the lower black shale zone thrusted over the upper limestone. Songgwangri thrust, so named, is a post-mineral fault and its plane represents a premineral slip plane. Enrichment of are took place along the bedding plane or fissure parallel to it, as seen in adit No. 1 or No. 2 along the floor of the thrust, and along the sheared zone or the brecciated zone oblique to the plane near the thrust in crystalline limestone of Sindong formation as observed in the underground levels of inclined slope. Ore minerals are chiefly zincblende, galena, pyrrhotite, arsenopyrite, acompanied pyrite and chalcopyrite, and contain Au and Ag. In earlier stage of mineralization, the limestone was recrystalized, and sulphide minerals were enriched in the· permiable zone said above by pyrometasomatism, and in later stage the limestone was affected chloritization and sericitization. However hydrothermal replacement was weak, so that enrichment did not took place. It seems that minerallizing materials came up through the premineral slip plane and injected, and replaced the limestone in permiable zone said above with sulphide are minerals. Then Songgwangri thrust took place and, the lower black shale zone thrusted upon crystalline limestone.
In case the overburden of a tunnel is too low to adopt NATM, cut and cover method generally can be chosen as alternative. However, in tunneling some area with very low or no overburden between two mountains, the cut and cover method requires additional construction of a couple of tunnel portals and the maintenance of portal slopes until backfilling is completed. As a solution for this problem, increasing the tunnel overburden by raising the ground level can be effective. This paper presents the case study for tunneling at C240 site in Taiwan High Speed Railway(THSR) in which soil-cement filling method was used for pre-banking before tunnel excavation. Cement content of filling material was $2\~4\%$ and thickness of filling a round was $130\~250\;mm$. The stability evaluation for the soil-cement slope and concrete lining of low cover tunnel was conducted by numerical analysis.
Rockfall protection fences are used for diminishing rockfall damage in roads side slopes. In order to install the fences in effective way, the conditions of rock slopes and total predicted impact energy of fa11ing rock should be considered. However, the fences have been constructed without any consideration for lithology, height and slope angle of rock slope in Korea. In addition, the information about the performance of the protection fences, which should be evaluated by in-situ test or laboratory test in order to check out the practical use in the field, is not available. Therefore, in design manual for the rockfall protection fence, the specific details for the installation of this type of fence are not provided yet. The full sized rockfall in situ test was carried out for the calculation of falling energy of rock and the evaluation of the maximum energy absorbing capacity of fence. For this test, the rock slopes whose heights are about 20 m and dip angle of 65 degree, have been chosen. This is because those geometries are mean height and slope angle of most road cut slopes along Korean national highway. Based on the preliminary simulation procedure, four different sizes of concrete ball (0.7, 1.3, 2.3 and 4.3 ton) were prepared and flour different types of protection fence were constructed. The results of this test provide information about the maximum energy absorbing capacity of the fence, kinetic energy of rockfall and restitution coefficient, and these results can be utilized in the establishment of rockfall fence design and construction manual.
Journal of the Korean Society of Environmental Restoration Technology
/
v.18
no.3
/
pp.97-107
/
2015
Research was initiated to investigate a vegetation characteristics of the species of ground cover plants mixed with herbeceous and woody plants on a cut slope. 4 different ground cover plants (Miscanthus sinensis var. purpurascens, Pennisetum alopecuroides, Festuca arundinacea and Zoysia japonica) were seeded at the same rate of $10.0g/m^2$ with herbaceous plants (Lotus corniculatus var. japonicus, Dianthus sinensis, Aster yomena, Chrysanthemum zawadskii and Coreopsis drummondii L) at the total seeding rate of $7.5g/m^2$ and native woody plants (Lespedeza bicolor Turcz, Indigofera pseudo-tinctoria and Albizzia julibrissin) at the total seeding rate of $7.5g/m^2$, respectively. This experiment was treated with 3 replications on a randomized block design. Data such as surface coverage rate(%), the germinating number, plant height and visual quality were analyzed. There were no statistic differences observed in the soil hardness and the soil moisture content while a significant difference was observed in the surface coverage rate and the germinating number. The surface coverage rate and the germinating number were significantly high in the Pennisetum alopecuroides plot when compared with the Miscanthus sinensis var. purpurascens plot, the Festuca arundinacea plot and the Zoysia japonica plot, respectively from the viewpoint of ground covers. Especially, the surface coverage rate was considerably low in the Festuca arundinacea plot. However, the surface coverage rate and the germinating number were no statistic differences observed in this treatment from the viewpoint of herbaceous and woody plants. Also, both of the plant height and visual quality were high in the Pennisetum alopecuroides plot when compared with the Miscanthus sinensis var. purpurascens plot, the Festuca arundinacea plot and the Zoysia japonica plot, respectively. We concluded that Pennisetum alopecuroides was the optimum plant from the treated ground covers mixed with native woody and herbaceous plants for the balanced emergence from the viewpoint of the ecological slope vegetation.
The formation of slopes is unavoidable under the special circumstance of Korea where $7%$ of the whole area are composed of mountains and civil engineering projects such as road and site developments are increasing with industrial development and horizontal expansions of urban area. Stability of slopes is one of quite important issues under special meteorological characteristics that over two-thirds of annual average rainfall is concentrated in summer season and the localized torrential downpour is getting more frequent recently. As a result of these circumstances, partial slope failures by debris flow of the high water content soils occur frequently in cut soil slopes. In this case of debris flow slope failure, slope declination method is selected fur the stable recovery because it is impossible to recover entirely by existing recovery methods. Seeding or special grass planting methods are followed separately without exception. The method by which entire recover with bigger stability ratio would be possible and grass planting work would be done simultaneously is developed. For debris flow failure slopes, this study secured the safety of slopes by preventing the inflow of rainwater and scour using geosynthetics-reinforced embankment, and created nature-friendly slopes by planting trees on the slopes.
Ji, Younghwan;Kim, Kihwan;Kim, Sungho;Hwang, Yeongcheol;Lee, Seungho
Journal of the Korean GEO-environmental Society
/
v.11
no.12
/
pp.47-56
/
2010
The construction of new roads and the consistent extension of already-existing roads or the line-shape revision of those roads are increased with the governmental investment to SOC facilities currently. Accordingly, the road cut slopes are in the trend of rapidly increasing. As the road slope has increased, a lot of human and property damages has entailed consequently and in the local case, numerous studies have carried out aiming at minimizing this damages caused by the rockfall and landslide. In general, standard falling rock prevention facility has employed for most of the local road slope based on "Guide for Installation and Management of Road Safety Facilities" published by MLTM(the Ministry of Land, Transport, and Maritime Affairs) but profound doubt has raised as to whether this rockfall prevention facility would function properly enough to prevent rockfall efficiently without any damages in case of actual occurrence of rockfall. In addition, it is a reality that in most cases, such work is relied on overseas technology as a whole as the local technical level is low and in case of rockfall prevention net, it is judged that a study on rockfall prevention net that is able to endure more powerful rockfall energy is required as the problem including net bursting is taken place as a result of enough bearing force being failed to be demonstrated due to its partial weak point(not uniformly made). Under this background, in this study, three kinds of model depending on mesh size of expanded metal that is considered to have an adoptability as rockfall prevention net, as target are selected and characteristics depending on mesh size of expanded metal is intended to be researched through a pull-out test performance by using pull-out test equipment rockfall prevention net.
Although wildlife bridge are built as a way to reduce habitat fragmentation caused by road construction, there is still a lot of debate about their effectiveness. Monitoring methods such as footprint traps and camera traps are used evaluate the effectiveness of wildlife bridge, but there is a limit to evaluate of effectiveness. In this study, the degree of use the wildlfe bridge was surveyed by striped field mouse that is likely use the wildlife bridge and surrounding as a habitat with capture-mark-recapture method.(Apodemus agraius). The distance and route of movement were identified by connecting the capture points, and the environmental factors on the use of the wildlife bridge implemented a generalized linear model(GLM) with the capture number of captured as a dependent variable. Consequently of capture, no individuals crossing the wildlife bridge, striped field mouse use the wildlife bridge as a habitat.The environmental factors affecting the use of mice were vegetation cover(1~2m, 2~8m, over 8m), vegetation construction, maximum diameter at breast height were positively correlated and slope was nagatively correlated. In conclusion, it is expected that the effectiveness of the wildlife bridge will be further improved by planting shrubs and trees and preventing high slope and cut slope increasing the utilization of the rat, such as being used as a food source in the ecosystem.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.