Abstract
In case the overburden of a tunnel is too low to adopt NATM, cut and cover method generally can be chosen as alternative. However, in tunneling some area with very low or no overburden between two mountains, the cut and cover method requires additional construction of a couple of tunnel portals and the maintenance of portal slopes until backfilling is completed. As a solution for this problem, increasing the tunnel overburden by raising the ground level can be effective. This paper presents the case study for tunneling at C240 site in Taiwan High Speed Railway(THSR) in which soil-cement filling method was used for pre-banking before tunnel excavation. Cement content of filling material was $2\~4\%$ and thickness of filling a round was $130\~250\;mm$. The stability evaluation for the soil-cement slope and concrete lining of low cover tunnel was conducted by numerical analysis.
Keywords
Soil-cement fill; Low overburden; Tunnel excavation; Numerical analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Hyundai-Chung Lin lV, 2001, Method Statement for Soil Cement Fill
2 Hyundai-Chung Lin lV, 2003, Work Specification for Soil Cement Fill
3 Hyundai-Chung Lin lV, 2002, Tungsiao NO.5 Tunnel Mined Section T09 - Inner Lining - Numerical Analysis
4 Hyundai-Chung Lin JV, 2001, Tungsial No.5 Tunnel Mined Section T09 - Design and Analysis of Low Cover Section
5 THSR Contract C240, 2000, Design manual - volume 2, Mined Tunnel
6 Hyundai-Chung Lin lV, 2002, Shihu No.2 Tunnel Mined Section T03 - Design and Analysis of Compacted Backfill