• Title/Summary/Keyword: Curtain Wall Building

Search Result 140, Processing Time 0.026 seconds

A Study on the Structural Performance Review as Design Change to the Unit Curtain Wall Profile (유닛 커튼월 프로파일 형상 변화에 따른 구조 성능 검토에 관한 연구)

  • Jung, Ui-In;Hong, Sang-Hun;Kim, Hae-Na;Park, Jun-Seo;Kim, Bong-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.247-248
    • /
    • 2023
  • The unit curtain wall is an exterior finish currently used on the exterior walls of high-rise buildings. Although the structural impact is not significant due to the non-strength wall, in the case of the unit curtain wall to which the factory manufacturing method is applied, deformation of the profile may occur according to its own weight. Therefore, in this study, stability is evaluated through design standard calculation applied when finishing the outer wall according to the design shape of the unit curtain wall profile.

  • PDF

A Study on the Insulation Performance of Unit Curtain Wall Profile Shape (유닛 커튼월 프로파일 형상에 따른 단열성능에 관한 연구)

  • Jung, Ui-In;Hong, Sang-Hun;Kim, Hae-Na;Park, Jun-Seo;Kim, Bong-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.245-246
    • /
    • 2023
  • The unit curtain wall is an exterior finish currently used on the exterior walls of high-rise buildings. Curtain walls used as non-endurance walls are largely classified into stick curtain walls and unit curtain walls, and their use has recently been on the rise to reduce risks at construction sites through factory manufacturing. Accordingly, this study attempted to examine the insulation performance according to the shape of the unit curtain wall profile through insulation simulation.

  • PDF

Performance Evaluations of Mock-up Tests for ALC Panel Curtain Wall in Building Exterior (ALC 패널을 활용한 건축물 외장 커튼월에 대한 Mock-up Test 성능 평가 연구)

  • Kim, Young-Ho;Lee, Yong-Soo
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2013
  • The green building is one of biggest factors to go the goal of energy saving and environmental conservation, reduction of energy consumption, friendly energy technology, recycling of resource, and environmental pollution reduction technology. The purpose of these green buildings realized by the energy-saving technology such as the exterior materials or curtain wall system. The curtain wall system is a element that come to insulated portions of building envelope that results in heat loss. The purpose of this paper is to carried out mock-up tests for exterior wall used in autoclaved lightweight concrete panels in green building practices. Mock-up test execute a mixed process between standard test procedure and complex test procedure based on AAMA 501(American Society for Testing and Materials) and ASTM 283, ASTM 330(American Society for Testing and Materials). In results, tests meet the requirements that grant values in steps of procedures provided on ASTM and AAMA. ALC panel is suitable for a exterior wall product to be gratified thermal cycling performance and structural capacity, deflection(H/200) and lateral displacement(H/50), for curtain walls.

A Study on the History of Technology in Korean Modern Architecture (한국 현대건축의 기술역사에 관한 연구)

  • Jung, In-Ha;Kim, Jin
    • Journal of architectural history
    • /
    • v.9 no.3 s.24
    • /
    • pp.51-69
    • /
    • 2000
  • This study tries to analyze the development of architectural technologies appeared in several tall buildings and large spatial structures from 1955 to 1999 in Korea. We suppose that these buildings represent the development of technology in Korean modern architecture. By the detailed analysis of these buildings, we can arrive at a conclusion as such; During the years 1955-1999, there existed a great changement in the eighties. We can find this fact very well in the domain of structural system and curtain wall system. In large spatial structures, the structural-system of shell and steel truss dome was replaced by that of space frame, space truss and cable truss with membrane. In tall building, the structural system of rigid frame and shear wall was replaced by tubular system, core and outrigger system. Korean architects introduced the aluminum curtain wall in the sixties, but its low technological level caused many problems in reality. Therefore, precast concrete curtain wall appeared from seventies as the main method for an outer wall in tall building. With the augmentation of height after 1980, PC curtain wall was replaced by the aluminum curtain wall of unit type and structural glass wall system. These systems help to stress the transparency in a tall building.

  • PDF

Bond Strength of Light-weight Inorganic Ceramic Board for Fire Resistant Curtain-wall System (커튼월 층간 화재확산방지구조 적용을 위한 경량무기발포 세라믹보드의 부착강도)

  • Shin, Hyeon-Uk;Song, Hun;Chu, Yong-Sik;Lee, Jong-Kyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.214-215
    • /
    • 2014
  • Technologies on energy saving and materials used in curtain walls have progressed with increase of high-rise and large buildings. This study is explain fire resistance performance of the curtain walls. And focused on bond strength of light-weight inorganic ceramic board in high temperature for fire resistant curtain-wall system. From the result, curtain-wall system high fire resistant using the light-weight inorganic ceramic board.

  • PDF

Heat Loss the Case Study of Office Building (사무소 건축물의 열손실 사례연구)

  • Kim, Kyeong-A;Kim, Bongl-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.51-54
    • /
    • 2011
  • In this study, It has the purpose to evaluate the insulation of the curtain wall of a building on the construction from 1990 to 2011 by measuring the inside and outside surface temperature of the curtain wall. The outside frame surface(mullion bar or spandrel bar) temperature of the curtain wall is 6℃~10℃ higher than that of the surface of glasses or insulation panel of curtain wall in winter. Furthermore the outside surface of frame anchor unit is 2℃~3℃ higher than section of other frame, so it was verified lossing lots of heating.

  • PDF

Construction of Super-block Unit Curtain Wall for High-rise Buildings Utilizing a Specialized Installing Equipment (전용 양중틀을 활용한 초고층 건물의 슈퍼블럭 유닛 커튼월 시공)

  • Chung, Sam-Yong;Lee, Sang-Heon;Ohk, Young-Mu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.174-181
    • /
    • 2004
  • We will introduce a method of construction of super-block curtain wall applied to Tower Palace III which is the highest high-rise complex building in Korea. Up-up method is utilized on Tower Palace III to shorten the term of works and it is that the curtain walls for the belt wall part are installed after the rests. The belt wall structure increases the horizontal structural stiffness of the building. The method of construction of super-block curtain wall is developed and used to raise and install the curtain wails of the belt wall floor. It is that the large block of curtain walls corresponding to three stories is fabricated on the ground in advance and the block is installed at a time by a tower crane. Specialized installing equipment :,s newly developed and applied to install the super-block. curtain wail. The curtain wall of the upper floor of the belt wall part is installed after the super-block. The installing equipment for this floor is developed utilizing a mini excavator and vacuum suctions. The application of this method had made it possible to omit the setting up the scaffold and financial profits such as the shortening of the terms of works was realized. The safety of works was secured and the productivity was also improved.

  • PDF

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

A study of Engineering analysis for improvement in practical use of RFID+4D system (RFID+4D 시스템 활용도 향상을 위한 엔지니어링 분석)

  • Hwang, Kyoung-Hoon;Ahn, Chi-Sun;Yoon, Su-Won;Schin, Sang-Yoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.173-175
    • /
    • 2011
  • A study is for improvement in practical use of RFID+4D. In the yard of construction industry, using information has become more important part to control total process. One of the way to improve the information using that comes from each step, RFID is getting attention. But it's not really adapted on construction industry. Especially, a study on the curtain wall part has a problem of engineering process. Each steps of curtain wall process are separated. If it' could be connect totally, controling information of curtain wall from producing to fitting become more efficient with adapted RFID+4D.

  • PDF