• Title/Summary/Keyword: Critical Time

Search Result 4,795, Processing Time 0.032 seconds

A Study on the Effect of Propagation Delay Time on Critical Time in Storage Elements (기억논리소자에서의 전달지연시간에 의한 Critical Time의 변화 양상 고찰)

  • Joo, Y.J.;Lee, S.H.;Ryoo, J.H.;Lee, S.H.;Sung, Y.K.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.922-924
    • /
    • 1995
  • The modeling of accurate timing in storage elements of ASIC cell library was studied. The propagation delay time of clock signal affects the critical time and this can cause malfunction in the chip designed in synchronous. In this paper, an analysis on the effect of input slope of clock signal in timing modeling were carried out. For the first time, in ASIC design, the design guides that can be used in both $0.6{\mu}M$ and $0.8{\mu}m$ design rule were offered, reducing the run time of SPICE and the time of cell library development.

  • PDF

Critical Temperature for Inter-Laminar Shear Strength and Effect of Exposure Time of FRP Rebars (FRP 보강근의 계면전단강도에 대한 임계온도와 노출시간의 영향)

  • Moon, Do-Young
    • Journal of the Korea Concrete Institute
    • /
    • v.25 no.1
    • /
    • pp.45-51
    • /
    • 2013
  • Short beam tests of GFRP and CFRP specimens exposed to high temperature were conducted to measure the inter-laminar shear strength. For the phase I test, the exposure time and temperature were varied to measure reduction in the strength due to the applied conditions. As a results, the critical temperature was found to $270^{\circ}C$ for the both FRP reinforcements. The high temperature, which causes 50% loss of inter-laminar shear strength, is defined as the critical temperature in this study. It should be noted that the critical temperature for the inter-laminar shear strength is mainly dependent on resin properties not on fiber type. In the phase II test, the effect of exposure time was investigated at intervals of 0.25hour for the critical temperature. All test results demonstrate that the exposure time effect is not significant compared to the maximum exposure temperature, but it is not negligible and, moreover, is significant at the critical temperature.

Measurement of critical time for optimum backpulsing time (최적 역충격을 위한 임계시간 측정)

  • 박상현;장진호;노수홍
    • Proceedings of the Membrane Society of Korea Conference
    • /
    • 1998.10a
    • /
    • pp.169-171
    • /
    • 1998
  • 막오염을 저감하는 여러 방법중의 하나인 backpulsing은 짧은 시간동안 고빈도로 역세척을 하는 것이다. 본 연구는 주기적인 역충격(frequence backpulsing)에 의한 중공사막의 오염을 줄이는데 있어서 적절한 역세 주기를 구하기 위하여 막이 오염되기 이전의 순수투과능을 나타내는 시간인 임계시간(critical time)을 구하는 것이 목적이다.

  • PDF

Development Model for Estimating Critical Path Probability of Element Path in PERT (PERT 요소공정의 주경로 확률 산정 모델 개발)

  • Youn, Deuk-No;Kim, Tae-Gon;Han, Yi-Cheol;Lee, Jeong-Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.2
    • /
    • pp.27-34
    • /
    • 2010
  • The PERT is one form of probabilistic network and can have many critical paths in the concept of each work has dispersed complete time. Here we propose two operators to estimate the probabilistic complete time about serial and parallel connections, and in each junction node, probability of critical path is estimated by new operator. Then we compare the estimated results with robability of critical path with deterministic CPM and Monte Carlo simulation (MCS). Our results show that all paths in PERT can be critical path, and proposed operators are efficient and accurate probabilistic calculators compare MCS result.

Stochastic analysis of a non-identical two-unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair

  • El-Sherbeny, M.S.
    • International Journal of Reliability and Applications
    • /
    • v.11 no.2
    • /
    • pp.123-138
    • /
    • 2010
  • This paper investigates a mathematical model of a system composed of two non-identical unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair, i.e. cheaper and costlier. This system goes for preventive maintenance at random epochs. We assume that the failure, repair and maintenance times are independent random variables. The failure rates, repair rates and preventive maintenance rate are constant for each unit. The system is analyzed by using the graphical evaluation and review technique (GERT) to obtain various related measures and we study the effect of the preventive maintenance preventive maintenance on the system performance. Certain important results have been derived as special cases. The plots for the mean time to system failure and the steady-state availability A(${\infty}$) of the system are drawn for different parametric values.

  • PDF

Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly (가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • v.34 no.6
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

Development of Enhanced Contingency Screening and Selection Algorithm for On-line Transient Security Assessment (과도안전도 평가를 위한 개선된 상정고장 선택 및 여과 알고리즘 개발)

  • Kim Yong-Hak;Song Sung-Geun;Nam Hae-Kon
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.6
    • /
    • pp.306-314
    • /
    • 2005
  • In this paper, a new approach that is based on EEAC & only with network solutions for CS&S in the transient stability assessment is developed. The proposed CS&S algorithm in conjunction with EEAC to include the capability of performing on-line TSA without TDS is used to calculate the critical clearing time for stability index. In this algorithm, all generators are represented by classical models and all loads are represented by constant impedance load models. The accelerating & synchronizing power coefficient as an index is determined at its disturbance through solving network equation directly. As mentioned above, a new index for generator is generally used to determine the critical generators group. The generator rotor angle is fixed for non-critical generators group, but has equal angle increments for critical generators group. Finally, the critical clearing time is calculated from the power-angle relationship of equivalent OMIB system. The proposed CS&S algorithm currently being implemented is applied to the KEPCO system. The CS&S result was remarkably similar to TSAT program and SIME. Therefore, it was found to be suitable for a fast & highly efficient CS&S algorithm in TSA. The time of CS&S for the 139 contingencies using proposed CS&S algorithm takes less than 3 seconds on Pentium 4, 3GHz Desktop.

A Novel Interleaving Control Scheme for Boost Converters Operating in Critical Conduction Mode

  • Yang, Xu;Ying, Yanping;Chen, Wenjie
    • Journal of Power Electronics
    • /
    • v.10 no.2
    • /
    • pp.132-137
    • /
    • 2010
  • Interleaving techniques are widely used to reduce input/output ripples and to increase the power capacity of boost converters operating in critical conduction mode. Two types of phase-shift control schemes are studied in this paper, the turn-on time shifting method and the turn-off time shifting method. It is found that although the turn-off time shifting method exhibits better performance, it suffers from sub-harmonic oscillations at high input voltages. To solve this problem, an intensive quantitative analysis of the sub-harmonic oscillation phenomenon is made in this paper. Based upon that, a novel modified turn off time shifting control scheme for interleaved boost converters operating in critical conduction mode is proposed. An important advantage of this scheme is that both the master phase and the slave phase can operate stably in critical conduction mode without any oscillations in the full input voltage range. This method is implemented with a FPGA based digital PWM control platform, and tests were carried out on a two-phase interleaved boost PFC converter prototype. Experimental results demonstrated the feasibility and performance of the proposed phase-shift control scheme.

Theoretical Analysis of Critical Chloride Content in (Non)Carbonated Concrete Based on Characteristics of Hydration of Cement (시멘트 수화 특성 및 탄산화를 고려한 콘크리트의 임계 염소이온량에 대한 해석 기법)

  • Yoon, In-Seok
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.3
    • /
    • pp.367-375
    • /
    • 2007
  • Critical chloride content for corrosion initiation is a crucial parameter in determining the durability and integrity of reinforced concrete structures, however, the value is still ambiguous. Most of the studies reporting critical threshold chloride content have involved the experimental measurement of the average amount of the total chloride content at arbitrary time. The majority of these researches have not dealt with this issue combined with carbonation of concrete, although carbonation can significantly impact on critical threshold chloride content. Furthermore, the studies have tried to define the critical chloride content within the scope of their experimental concrete mix proportion at arbitrary time. However, critical chloride content for corrosion initiation is known to be affected by a lot of factors including cement content, type of binder, chloride binding, concentration of hydroxyl ions, and so on. It is necessary to define the unified formulation to express the critical chloride content for various mix proportions of concrete. The purpose of this study is to establish an analytical formulation of the critical chloride content of concrete. In this formulation, affecting factors, such as mix proportion, environment, chemical evolution of pore solution with elapsed time, carbonation of concrete and so on are taken into account. Based on the Gouda's experimental results, critical chloride content is defined as a function of $[Cl^-]$ vs. $[OH^-]$ in pore solution. This is expressed as free chloride content with mass unit to consider time evolution of $[OH^-]$ content in pore solution using the numerical simulation programme of cementitious materials, HYMOSTRUC. The result was compared with other experimental studies and various codes. It is believed that the approach suggested in this study can provide a good solution to determine the reasonable critical chloride content with original source of chloride ions, for example, marine sand at initial time, and sea water penetration later on.

Effects of Duration and Time Distribution of Probability Rainfall on Paddy Fields Inundation (설계강우의 지속시간 및 시간분포에 따른 배수개선 농경지 침수 영향 분석)

  • Jun, Sang-Min;Kim, Kwi-Hoon;Lee, Hyunji;Kang, Ki-Ho;Yoo, Seung-Hwan;Choi, Jin-Yong;Kang, Moon-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.64 no.2
    • /
    • pp.47-55
    • /
    • 2022
  • The objective of this study was to analyze the effect of the duration and time distribution of probability rainfall on farmland inundation for the paddy fields in the drainage improvement project site. In this study, eight drainage improvement project sites were selected for inundation modeling. Hourly rainfall data were collected, and 20- and 30-year frequency probability rainfalls were estimated for 14 different durations. Probability rainfalls were distributed using Intensity-Duration-Frequency (IDF) and Huff time distribution methods. Design floods were calculated for 48 hr and critical duration, and IDF time distribution and Huff time distribution were used for 48 hr duration and critical duration, respectively. Inundation modeling was carried out for each study district using 48 hr and critical duration rainfalls. The result showed that six of the eight districts had a larger flood discharge using the method of applying critical duration and Huff distribution. The results of inundation depth analysis showed similar trends to those of design flood calculations. However, the inundation durations showed different tendencies from the inundation depth. The IDF time distribution is a distribution in which most of the rainfall is concentrated at the beginning of rainfall, and the theoretical background is unclear. It is considered desirable to apply critical duration and Huff time distribution to agricultural production infrastructure design standards in consideration of uniformity with other design standards such as flood calculation standard guidelines.