1 |
Soroush H. M., 1994. The most critical path in a PERT network, In Operational Research Society 45(3): 287-300.
DOI
|
2 |
Van Slyke, R. M., 1963. Monte Carlo method and the PERT problem, In Operations Research and the Management Sciences 11(5): 839-860.
DOI
|
3 |
Williams T. M., 1992. Criticality in stochastic networks, In Operational Research Society 43(4): 353-357.
DOI
|
4 |
Yang, H. and Y. Chen, 2000. Finding the critical path in an activity network with time-switch constraints, In European Journal of Operational Research 120: 603-613.
DOI
|
5 |
Yao, M. and W. Chu, 2007. A new approximation algorithm for obtaining the probability distribution function for project complement time, In Computers and Mathematics with Applications 54(2): 282-295.
DOI
ScienceOn
|
6 |
Fatemi Ghomi, S. M. T. and E. Teimouri, 2001. Path critical index and activity critical index in PERT networks, In European Journal of Operational Research
141(1): 147-152.
DOI
|
7 |
Fulkerson, D. R., 1962. Expected critical path length in PERT networks, In Operations research 10(6): 808-817.
DOI
|
8 |
Gong, D. and J. E. Rowings Jr, 1995. Calculation of safe float use in risk-analysis-oriented network scheduling, In International Journal of Project Management 13(3): 187-194.
DOI
|
9 |
Liang G. and T. Han, 2004. Fuzzy critical path for project network, In Information and Management Science 15(4): 29-40.
|
10 |
Lee, J., H. Yi, M. Park and J. Lee, 2005. An investigation of project completion time estimation method in PERT network for planning and management in large-scale systems, In Proc. of the Korean Society of Agricultural Engineerings Conference 695-699.
과학기술학회마을
|
11 |
Malcom, D. G., J. H. Roseboom, C. E. Clack and W. Fazar, 1959. Application of a technique for research and development program Evaluation, In Operations
Research 7(5): 646-669.
DOI
ScienceOn
|
12 |
Ringer, L. J., 1969. Numerical operators for statistical PERT critical path analysis, In Management Science 16(2): 136-143
DOI
|
13 |
Ringer, L. J., 1971. A statistical theory for PERT in which completion times of activities are inter-dependent, Management Science 17(11): 717-723.
DOI
ScienceOn
|
14 |
Robillard, P. and M. Trahan, 1977. The completion time of PERT networks, In Operations Research 25(1): 15-29.
DOI
|
15 |
Sigal, C. E., A. A. B. Pritsker and J. J. Solberg, 1979. The use of cutsets in Monte Calros analysis of stochastic network, In Mathematic and Computers in Simulation 21(4): 376-384.
DOI
|
16 |
Chen, Y., Dan R. and Kwei T., 1997. Critical path in an activity network with time constraints, In European Journal of Operational Research 100(1): 122-133.
DOI
|
17 |
Burt, J. M. Jr., 1970. Monte Carlo techniques for stochastic network analysis, In Winter Simulation Conference, No. 9, 146-153. New York, United States.: IEEE.
|
18 |
Burt, J. M. and M. B. Garman, JR., 1971. Conditional Monte Carlo: A simulation technique for stochastic network analysis, In Management Science 8(3): 207-217.
DOI
ScienceOn
|
19 |
Chen, S. and T. Chang, 2001. Finding multiple possible critical path using fuzzy PERT, In Institute of Electrical and Electronics Engineers 31(6): 930-937.
DOI
|
20 |
Dodin, B., 1984. Determining the K most critical paths in PERT networks, In Operator Research Society of America 32(4): 859-877.
DOI
|
21 |
Dodin, B. and S. E. Elmaghraby 1985. Approximating the distribution functions in stochastic networks, In Computer and Operation Research 12(3): 251-264.
DOI
ScienceOn
|
22 |
Dodin, B. and M. Sirvanci., 1990. Stochastic networks and the extreme value distribution, In Computer and Operation Research 17(4): 397-409.
DOI
ScienceOn
|
23 |
Elmaghraby S. E., 2000. On criticality and sensitivity in activity networks, In European Journal of Operational Research 127(2): 220-238.
DOI
|