Jeong, Han Seok;Suh, Kyo;Jang, Tae Il;Seong, Choung Hyun;Kim, Hak Kwan;Park, Seung Woo
Journal of The Korean Society of Agricultural Engineers
/
v.55
no.2
/
pp.9-20
/
2013
Many studies have reported additional treatment is needed to use wastewater for agricultural purpose. Economic considerations should be taken into account to establish infrastructure for agricultural reuse because of a large amount of water use in irrigation and relatively low water quality requirement. The objective of this study was to conduct economic analysis of wastewater reclamation and reuse systems for agriculture. A system dynamics approach considering complexity and dynamics in the wastewater reuse systems was used for the economic analysis, which are related with social, environmental, and economic problems. Sensitivity and benefit cost analysis for wastewater reuse systems was conducted through the established economic assessment model. The result of sensitivity analysis showed that water resources development and installation cost were the most sensitive for total benefits and costs, respectively. The scenario-based test of the organized economic assessment model shows marginal cost ranges and enables decision-makers to decide reasonable cost for the wastewater reuse systems for agriculture.
The Transactions of The Korean Institute of Electrical Engineers
/
v.65
no.11
/
pp.1943-1947
/
2016
Korea Electrical Safety Cooperation(KESCO) have provided the electrical safety speed-call service from 2007 year. Purpose of the service is to reduce discomfort of electricity use and to prevent electrical accident like as electrical fire and shock accident by providing emergency treatment service on fault of the residential electrical facilities notified in the specific house like as a lower-income group and a social welfare facility. But efficiency and economic evaluation of the electrical safety speed-call service is impossible because analysis on the quantitative effect of the service is difficult. This paper presents cost-benefit analysis method and result of the electrical safety speed-call service. The presented cost-benefit analysis method has a two-step process: the first step is to measure quantitative electrical fire prevention effect of the service by using electrical accident statistics and developing outcome analysis logic model of the service effect, and the second step is to analysis cost-benefit(B/C)of the service by calculating quantitative benefit analysis on the measured quantitative electrical fire prevention effect. The results showed that cost-benefit(B/C)of the electrical safety speed-call service is over 4 after 2010 year.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.2
/
pp.781-790
/
2013
This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.
The Transactions of the Korea Information Processing Society
/
v.7
no.6
/
pp.1810-1817
/
2000
The purpose of this research is to develop an estimation model for information systems operating costs. Current cost estimation practices and types of sytem management projects have been reviewed an analyses. Typical operating project types of information systems are determined. They are application system operation, help disk operation, network management and operation, and hardware management. For each type of projects, cost factors ar identified and a structure of cost estimation model is defined. Cost estimation models have been constructed and tested by 24 real operation projects data. Statistical analysis shows derived models are statistically significant. User groups' opinion on these draft cost estimation model has been surveyed and summarized. The results of this research can be used as a cornerstone for future research on operating cost estimation, and for cost estimation guideline of information systems operation projects.
The Journal of Sustainable Design and Educational Environment Research
/
v.11
no.3
/
pp.46-54
/
2012
The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.
The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.
Korean Journal of Construction Engineering and Management
/
v.4
no.4
s.16
/
pp.212-219
/
2003
In construction project planning and control, a cost model performs a critical role such as cost determination on a contract stage and cost tracing. The model can maximize owner's profit and value within the project budget and optimize cost management works on overall construction implementation stages. A BoQ(Bill of Quantities) generally adopted in a unit price contract has been applied as an important tool for cost control and forecast. However a previous cost model based on the BoQ has shown limitations in that it requires too detailed information and heavy manpower on cost management and difficulty in keeping relationship with construction planning, scheduling and progress management. The each cost items and unit prices which constitute of construction works are individually very important management factors but the relative weight for each items and prices have a difference on the contents and conditions of each conditions of each construction works. In consideration of this structural mechanism of cost determination, this research is aimed at examining the critical factors affecting the construction cost determination and propose and verify a new cost forecasting model which is more simple and efficient and also keeps the accuracy of cost management.
Chang, Suk;Nam, Do Woo;Sim, Jeong Hwan;Kim, Dong Hee
Journal of the Korea Society for Simulation
/
v.29
no.4
/
pp.85-94
/
2020
In determining the feasibility of planning and launching railway transportation projects, various decision-making processes are essentially required. LCC(Life Cycle Cost) value including total construction cost and operation cost is estimated in approximation Model with rough guideline. In this study, modeling and simulation-based analysis method is proposed to support the decision making process of railroad transportation and derivation of LCC. Firstly, cost analysis model was constructed by collecting various existing rail transportation business data to enable analyze based on numerical data, and the result were analyzed by DOE(Design Of Experiments) and RSM (Response Surface Method) simulation. Professional commercial software tools were used for effective model construction and simulation. In order to verify the research results, the actual railroad transportation projects were selected, and the results of the analysis were compared.
Kim, Joo-Hwan;Yom, Jae-Hong;Sohn, Duk-Jae;Yeon, Sang-Ho
Journal of Korean Society for Geospatial Information Science
/
v.1
no.1
s.1
/
pp.217-225
/
1993
The cost/benefit analysis method is frequently used in the feasibility study of investments on geo-spatial information system. The cost/benefit analysis method has been applied extensively in the feasibility study of conventional information systems and recently efforts has been made to apply this method to geo-spatial information systems as well. This study efforts were made to present a cost/benefit model suitable for Korean GSIS and this model was then applied to Facility Management. In establishment of the cost model, the items of various costs were defined and a survey was made to find the average unit cost of each item. For the benefit model, the benefits of implementing a geo-spatial information system is classified into tangible and intangible benefits and only th tangible benefits were further classified. The established cost/benefit model was then applied to a gas distribution company with more than 100 employees and more than 300,000 customers. A GSIS was designed and the cost its implementation was compared to the present manual method of operation.
Journal of Korean Society of Industrial and Systems Engineering
/
v.18
no.35
/
pp.131-138
/
1995
For the purpose of the reduction of tile cost, a production/inventory model including the interference phenomenon was developed. By investigating the cause and the characteristics of the direct/indirect cost due to the interference phenomenon, a strategy for suitable production was developed. The developed model was quantitatively validated using an existing-EPQ model and the SIMAN package was used to simulate and animate the model. Consequently, it was presented that the total operating cost of the system could be decreased with tile proposed model.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.