• 제목/요약/키워드: Cost Variance

검색결과 284건 처리시간 0.024초

벌크재료의 신뢰성보증을 위한 샘플링검사 방식 (A Bulk Sampling Plan for Reliability Assurance)

  • 김동철;김종걸
    • 대한안전경영과학회지
    • /
    • 제9권2호
    • /
    • pp.123-134
    • /
    • 2007
  • This paper focuses on the in-house reliability assurance plan for the bulk materials of each company. The reliability assurance needs in essence a long time and high cost for testing the materials. In order to reduce the time and cost, accelerated life test is adopted. The bulk sampling technique was used for acceptance. Design parameters might be total sample size(segments and increments}, stress level and so on. We focus on deciding the sample size by minimizing the asymptotic variance of test statistics as well as satisfying the consumer's risk. In bulk sampling, we also induce the sample size by adapting the normal life time distribution model when the variable of the lognormal life time distribution is transformed and adapted to the model. In addition, the sample size for both the segments and increments can be induced by minimizing the asymptotic variance of test statistics of the segments and increments with consumer's risk met. We can assure the reliability of the mean life and B100p life time of the bulk materials by using the calculated minimum sample size.

측정오차(測定誤差)가 증가(增加)하는 자동계량기(自動計量機)의 최적교체시기결정(最適交替時期決定)에 관한 연구(硏究) (The Optimal Replacement Policy of Auto - Scale with Increasing Error Variance)

  • 고종섭;윤덕표
    • 품질경영학회지
    • /
    • 제12권2호
    • /
    • pp.33-36
    • /
    • 1984
  • This paper is concerned with the optimal replacement policy of auto-scale with increasing error-variance. This optimization model is to minimize the sum of the cost of defective and excess weight allowance for a target value. The numerical example for the proposed problem is solved by Golden-Section Search and Simpsons's rule.

  • PDF

연속생산공정에서 공정목표값과 검사규격한계의 경제적인 결정에 관한 연구 (A Study on Economic Selection of the Process Target and the Screening Specification Limits in a Continuous Production Process)

  • 백종석;윤덕균
    • 품질경영학회지
    • /
    • 제25권4호
    • /
    • pp.57-70
    • /
    • 1997
  • Consider a production system where all manufactured products are screened through automatic inspection equipment. The products for which the measured value of quality characteristic is larger than the lower screening specification limit (SL) and smaller than the u, pp.r screeing specification limit(SU) are accepted. Those smaller than SL are reworked and those larger than SU are excluded from the process. Assuming that the quality characteristic is normally distributed with known variance, this paper suggests cost models which involve inspection cost, production cost, rework cost, exclusion cost and quality cost, and presents the methods of finding the optimal values of the screening specification limits and the process target. Numerical example is given to demonstrate the a, pp.icability of the cost models suggested in this paper.

  • PDF

음성인식에서 주 성분 분석에 의한 차원 저감 (Dimensionality Reduction in Speech Recognition by Principal Component Analysis)

  • 이창영
    • 한국전자통신학회논문지
    • /
    • 제8권9호
    • /
    • pp.1299-1305
    • /
    • 2013
  • 이 논문에서 우리는 MFCC 특징벡터의 차원 저감을 통해 음성 인식에서의 계산량을 줄이는 방법을 조사한다. 특징벡터의 특성분해는 벡터의 성분을 분산의 크기에 따라 배치되도록 선형 변환 시켜준다. 첫 번째 성분은 가장 큰 분산을 가져서 패턴 분류에서 가장 중요한 역할을 한다. 따라서, 분산이 작은 성분들을 제외시키는 차원 저감을 통하여, 계산량을 줄이면서 동시에 음성 인식 성능을 저하시키지 않는 방법을 생각할 수 있다. 실험 결과, MFCC 특징벡터의 성분을 절반 정도로 줄여도 음성인식 오류율에 큰 악영향이 없음이 확인되었다.

시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발 (Development of Earned Value Management System by Using Visualization Index and WBS Map)

  • 이우식;강인석;박서영
    • 한국건설관리학회논문집
    • /
    • 제10권1호
    • /
    • pp.26-35
    • /
    • 2009
  • 건설공사 공정 공사비 통합관리시스템(EVMS, Earned Value Management System)에서 대부분의 정보들은 공사정보 분류체계(WBS, Work Breakdown Structure)를 중심으로 활용된다. 즉, 공정편차와 비용편차 등의 EVM 성과정보 역시 WBS에서 선택된 공종을 중심으로 결과물이 분석되므로, EVMS에서 WBS는 정보중심 역할을 하게 된다. 본 연구에서는 WBS 정보가 4상한의 좌표방식으로 표현되어 프로젝트의 대 중 소 공종이 용이하게 표현될 수 있는 좌표식 공사정보분류체계(WBS Map) 표현기법을 구축하였다. 또한 연구에서는 WBS Map에 근거한 EVMS를 개발하였으며, 개발된 EVMS에서는 각종 속성 지표값들을 색상기호 등으로 시각화하는 방법론을 구축하여 EVMS 정보의 실무 활용성을 높일 수 있도록 하였다.

A STOCHASTIC VARIANCE REDUCTION METHOD FOR PCA BY AN EXACT PENALTY APPROACH

  • Jung, Yoon Mo;Lee, Jae Hwa;Yun, Sangwoon
    • 대한수학회보
    • /
    • 제55권4호
    • /
    • pp.1303-1315
    • /
    • 2018
  • For principal component analysis (PCA) to efficiently analyze large scale matrices, it is crucial to find a few singular vectors in cheaper computational cost and under lower memory requirement. To compute those in a fast and robust way, we propose a new stochastic method. Especially, we adopt the stochastic variance reduced gradient (SVRG) method [11] to avoid asymptotically slow convergence in stochastic gradient descent methods. For that purpose, we reformulate the PCA problem as a unconstrained optimization problem using a quadratic penalty. In general, increasing the penalty parameter to infinity is needed for the equivalence of the two problems. However, in this case, exact penalization is guaranteed by applying the analysis in [24]. We establish the convergence rate of the proposed method to a stationary point and numerical experiments illustrate the validity and efficiency of the proposed method.

A dual approach to input/output variance constrained control problem

  • Kim, Jac-Hoon
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1994년도 Proceedings of the Korea Automatic Control Conference, 9th (KACC) ; Taejeon, Korea; 17-20 Oct. 1994
    • /
    • pp.28-33
    • /
    • 1994
  • An optimal controller, e.g. LQG controller, may not be realistic in the sense that the required control power may not be achieved by existing actuators, and the measured output is not satisfactory. To be realistic, the controller should meet such constraints as sensor or actuator limitation, performance limit, etc. In this paper, the lnput/Output Variance Constrained (IOVC) control problem will be considered from the viewpoint of mathematical programming. A dual version shall be developed to solve the IOVC control problem, whose objective is to find a stabilizing control law attaining a minimum value of a quadratic cost function subject to the inequality constraint on each input and output variance for a stabilizable and detectable plant. One approach to the constrained optimization problem is to use the Kuhn-Tucker necessary conditions for the optimality and to seek an optimal point by an iterative algorithm. However, since the algorithm uses only the necessary conditions, the convergent point may not be optimal solution. Our algorithm will guarantee a sufficiency.

  • PDF

한국 제조업체의 중국시장 진입유형 선택 결정요인에 관한 연구 (A Study on Selection Determinant Factor in the China Market Entry of Korean Manufacture Firms)

  • 이제홍
    • 통상정보연구
    • /
    • 제10권4호
    • /
    • pp.417-437
    • /
    • 2008
  • Korean firms have had a short history of foreign direct investment and export in China market entry. This present study empirically analyzed determinants of the choice of foreign market entry modes, Particularly forcusing on the China market entry on Korean manufacture firms. This study developed a research model to determinant factor in the China market entry and collected 77 survey responses from the Korean manufacture firms. This study model construct in the third factor, China market character, company character and product character. In China market character, the variance are China trade barrier, culture different, competition power. The variance in company character are internationalization experience, enterprise rage and entry motivation. Also the variance in product character are product different, customer service and cost advantage. It is researcher's main interest that which type of China market entry format brought most positive evaluation form the Korean manufacture firms. therefor, these research results turned out to be different a little both export and direct investment in China market of Korean manufacture firms.

  • PDF

Cpm+ 기준에서의 공정평균이동에 대한 재조정 기간 결정 (Determination of the Resetting Time to the Process Mean Shift based on the Cpm+)

  • 이도경
    • 산업경영시스템학회지
    • /
    • 제41권1호
    • /
    • pp.110-117
    • /
    • 2018
  • Machines and facilities are physically or chemically degenerated by continuous usage. One of the results of this degeneration is the process mean shift. By the result of degeneration, non-conforming products and malfunction of machine occur. Therefore a periodic preventive resetting the process is necessary. This type of preventive action is called 'preventive maintenance policy.' Preventive maintenance presupposes that the preventive (resetting the process) cost is smaller than the cost of failure caused by the malfunction of machine. The process mean shift problem is a field of preventive maintenance. This field deals the interrelationship between the quality cost and the process resetting cost before machine breaks down. Quality cost is the sum of the non-conforming item cost and quality loss cost. Quality loss cost is due to the deviation between the quality characteristics from the target value. Under the process mean shift, the quality cost is increasing continuously whereas the process resetting cost is constant value. The objective function is total costs per unit wear, the decision variables are the wear limit (resetting period) and the initial process mean. Comparing the previous studies, we set the process variance as an increasing concave function and set the quality loss function as Cpm+ simultaneously. In the Cpm+, loss function has different cost coefficients according to the direction of the quality characteristics from target value. A numerical example is presented.

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • 제16권2호
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.