1 |
Juran, J.M., Quality Handbook, McGraw-Hill Companies, Inc., 1962.
|
2 |
Kamat, S.J., A Smoothed Bayes Control of a Variable Quality Characteristic with Linear Shift, Journal of Quality Technology, 1976, Vol. 8, No. 2, pp. 98-104.
DOI
|
3 |
Lee, D.K., Determination of The Retting time to the Process Mean Shift by the Loss Function, Journal of Society of Korea Industrial and Systems Engineering, 2017, Vol. 40, No. 1, pp. 165-172.
DOI
|
4 |
Lee, J.H., Park T.H., Kwon H.M., Hong S.H., and Lee M.K., Optimum target values for manufacturing processes when drifting rate in the process mean is normally distributed, Journal of the Korean Society for Quality Management, 2010, Vol. 38, No. 4, pp. 98-104.
|
5 |
Park, D.K., Lee, J.S. and Jo, G.H., A Study on the Wearing Analysis of Insert Tip and Chip's Shape in Turning Operations, Journal of the Korea Academia- Industrial cooperation Society, 2015, Vol. 16, No. 4, pp. 2430-2435.
DOI
|
6 |
Quesenberry, C.P., A SPG Approach to Compensating a Tool-Wear Process, Journal of Quality Technology, 1988, Vol. 20, No. 4, pp. 220-229.
DOI
|
7 |
Pandit, S.M. and Wu, S.M., Time Series and System Analysis with Applications, John Wiely & Sons, 1983, pp. 307, 490-491.
|
8 |
Lee, M.K. and Bai D.S., Determination of the Optimal Target Values for a Canning Process with Linear Shift in the Mean, Journal of the Korean Institute of Industrial Engineers, 1994, Vol. 20, No. 1, pp. 3-13.
|
9 |
Makis, V., Optimal tool replacement with asymmetric quadratic loss, IIIE Transaction, 1996, Vol. 28, No. 6, pp. 463-466.
DOI
|
10 |
Manuele, J., Control Chart for Determining Tool Wear, Industrial Quality Control, 1945, Vol. 1, No. 6, pp. 7-10.
|
11 |
Sule, D.R. and Harmon, B., Determination of Coordinated Maintenance Scheduling Frequencies for a Group of Machines, AIIE Transactions, 1979, Vol. 11, No. 1, pp. 540-548.
|
12 |
Rahim, M.A. and Tuffaha F., Integrated Model for Determining the Optimal Initial Settings of the Process Mean and the Optimal Production Run Assuming Quadratic Loss Functions, International Journal of Production Research, 2004, Vol. 42, No. 16, pp. 3281-3300.
DOI
|
13 |
Schneider, H., Colm O'Cinneide, and Tang, K., Optimal Production Process Subject to AOQL Constraint, Naval Research Logistics Quarterly, 1988, Vol. 35, No. 3, pp. 383-396.
DOI
|
14 |
Springer, C.H., A Method for Determining the Most Economic Position of a Process Mean, Industrial Quality Control, 1951, Vol. 8, pp. 36-39.
|
15 |
Ahn, G.H. and Jang J.S., Determination of Starting Value and the Resetting Time for a Production Process with Linear Shift in a Process Mean, Journal of the Korean Society for Quality Management, 1998, Vol. 26, No. 4, pp. 51-64.
|
16 |
Arcelus, F.J., Banerjee, P.K., and Chandra, R., Optimal Production Run for a Normally Distributed Quality Characteristics Exhibiting Non-Negative Shifts in Process Mean and Variance, IIE Transactions, 1982, Vol. 14, No. 2, pp. 90-98.
DOI
|
17 |
Boyles, R.A., The Taguchi Capability Index, Journal of Quality Technology, 1991, Vol. 23, No. 1, pp. 17-26.
DOI
|
18 |
Chen, C.H., Determining the optimum process mean based on Asymmetric Quality Loss Function and Rectifying Inspection Plan, IEEE : Industrial Engineering Management Conference, 2004, pp. 1080-1084.
|
19 |
Gibra, I.N., Optimal Control Processes Subject to Linear Trends, The Journal of Industrial Engineering, 1967, Vol. 18, No. 1, pp. 35-41.
|
20 |
Golhar, D.Y., Determination of the Best Mean Contents for a Canning problem, Journal of Quality Technology, 1987, Vol. 19, pp. 82-84.
DOI
|