• 제목/요약/키워드: Cost Minimization

검색결과 415건 처리시간 0.027초

발전기 출력특성을 고려한 최적전원구성 연구 (A Study of Optimal Fuel-Mix Considering Power Generation Operation)

  • 정영범;김길신;박창호;윤용범
    • 조명전기설비학회논문지
    • /
    • 제25권10호
    • /
    • pp.28-37
    • /
    • 2011
  • Though Korea has introduced CBP(Cost Based pool) power trading system since 2001, long-term Generation system planning has been executed by government for Cost minimization every 2 years. Until currently the model which is used for Generation system planning and best-mix only considers cost minimization and total yearly or quarterly electricity demand every year. In a view point of one day power supply operation, technical characteristics, like the ramp up/down rate of total generation system, minimum up/down time and GFRQ(Governor Free Response Quantity), are very important. this paper analyzes Optimal Fuel-Mix for 2022 Korea generation system satisfying these constraints of each fuel type and considering pump storage plants, construction cost and $CO_2$ emission charge Using MILP(Mixed Integer Linear Programming) method. Also the sensitivity analysis which follows in future power industry environmental change accomplished.

MANET 환경에서의 DDoS 공격방지 알고리즘 분석 (Analysis of DDoS Prevention Algorithm in Mobile Ad-hoc Network)

  • 김동철
    • 융합보안논문지
    • /
    • 제13권1호
    • /
    • pp.11-17
    • /
    • 2013
  • 본 논문에서는 MANET(Mobile Ad-hoc Network) 환경에서의 보안 요구사항과 DDoS(Distributed Denial of Service) 공격방지를 위한 보호노드(게이트웨이) 설정 알고리즘을 제시한다. 이를 위하여, 정보보호를 위한 기반 기술 및 네트워크 응용기술과 보안위협을 분석하고 MANET에서 필수적으로 요구되는 보안 요구사항을 제시하며, 송신과 수신노드 사이 정보전달시 DDoS 공격을 효과적으로 방어하기 위한 보호노드 설정 알고리즘을 제시하고 성능을 분석한다. 보호노드 설정시 보호노드와 수신노드들 사이의 총링크 비용의 최대값을 최소화하는 경우와 평균비용을 최소화하는 경우로 구분하여 성능을 분석하며, 각 알고리즘의 성능을 All Enumeration 기법을 이용하여 구한 최적해와 비교, 분석한다. 분석결과, 보호노드와 수신노드들 사이의 최대비용을 이용하는 경우보다 평균비용을 이용하여 보호노드를 설정하는 경우 송신과 수신 노드들 사이의 총비용이 최소화됨을 알 수 있다.

Computer용 Monitor 완제품의 Burn-in 최적화에 관한 연구 (A Study on the Burn-in Optimization of Computer Monitor)

  • 박종만
    • 품질경영학회지
    • /
    • 제23권4호
    • /
    • pp.148-156
    • /
    • 1995
  • 많은 Buyer들이 품질의 기본조건으로 요구하는 완제품 Burn-in 시간은 실제 필요 이상으로 긴 시간일 수 있으며 생산자 입장에서 Cost, Delivery, Capacity 등의 제약으로 이행하기 어려운 경우가 종종 있다. 본 연구는 생산자에게 실무적으로 적용이 용이하고 Buyer에게 설득력있는 최적 Burn-in 시간 근거를 제시할 수 있도록, 구간개념과 Curve Fitting 방법을 적용하여 최적 Burn-in 시간을 추정하고 시간대별 Reliability를 산출 비교해 봄으로서 생산자 입장에서 Burn-in 시간을 결정하고 Reliability 추정 Model을 결정해 갈 수 있도록 하였다. 향후 제시된 Burn-in 시간의 최적여부는 Field Data로부터 검증되어야 할 것이다.

  • PDF

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

변동비반영 전시장(CBP)에서의 양수발전기 운영방안 (An Operation Method of Pumped Storage Hydroplants in The Cost Based Pool)

  • 김광인;김두중;박만근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.108-111
    • /
    • 2001
  • The electric power industries in Korea are launched into deregulation by introducing the CBP(Cost Based Pool), where generation sector of KEPCO was divided into six generation companies and the other sectors of KEPCO remains vertically integrated system. In deregulated market, participants are concerned with maximization of their profit rather than minimization of system-wide costs. Consequently, there are difficulties in applying the cost minimization for the scheduling of generation resources to CBP, because of the operation of pumped-storage hydroplants. This paper presents an operation method of pumped storage hydroplants which is helpful for the economic operation of power system considering the market in the CBP.

  • PDF

프리스트레스트 콘크리트 박스 거더 교량의 단면최적화 (The Section Optimization of Prestressed Concrete Box Girder Bridges)

  • 노금래;김만철;박선규;이인원
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 1998년도 가을 학술발표대회 논문집(III)
    • /
    • pp.718-723
    • /
    • 1998
  • The program which could determine cross-sectional dimension of the prestressed concrete box girder bridges at the stage of preliminary design was developed using the optimal technique in this study. It could minimize the cost required in the design of box girder bridges and the construction with the full staging method. Objective cost function consisted of six independent variables such as height of cross-section, jacking force and thickness of web and bottom flange. The SUMT(Sequntial Unconstrained minimization Technique) was used to solve the constrained nonlinear minimization optimal problem. Using the program developed in this study, optimum design was performed for existing bridges with one cell cross section of constant depth. The result verify the compatibility of the program.

  • PDF

컨베이어 시스템 분기점에서의 셋업 최소화 문제 (Setup Minimization Problem in a Diverging Point of the Conveyor System)

  • 김형태;한용희
    • 산업경영시스템학회지
    • /
    • 제36권3호
    • /
    • pp.95-108
    • /
    • 2013
  • The problem of constrained sequencing of a set of jobs on a conveyor system with the objective of minimizing setup cost is investigated in this paper. A setup cost is associated with extra material, labor, or energy required due to the change of attributes in consecutive jobs at processing stations. A finite set of attributes is considered in this research. Sequencing is constrained by the availability of conveyor junctions. The problem is motivated by the paint purge reduction problem at a major U.S. automotive manufacturer. We first model a diverging junction with a sequence-independent setup cost and predefined attributes as an assignment problem and this model is then extended for a more general situation by relaxing the initial assumptions in various ways.

구조물의 최적안전지수와 생애주기비용의 상관관계에 관한 연구 (A Study on the Correlation between Optimal Safety of Structures and Minimization of Life Cycle Cost(LCC))

  • 방명석
    • 한국안전학회지
    • /
    • 제29권6호
    • /
    • pp.94-98
    • /
    • 2014
  • 본 연구는 구조물의 최적안전수준과 수명기간동안 투자되는 총비용과의 상관관계를 연구하였다. 설계, 건설 및 공용 중 투자되는 총비용을 최소화하면서 최적의 안전수준을 결정하기 위하여 신뢰성해석을 수행하였다. 신뢰성해석에는 설계인자들의 불확실성과 설계 및 공사, 유지관리를 수행하는 인간의 오류 등 인적 불확실성을 확률변수로 고려하였다. 이러한 확률해석을 통한 안전지수와 생애주기비용의 상관관계를 연구하고, 생애주기비용의 분산도에 따른 안전지수의 민감도해석을 통하여 최적의 안전수준을 결정하였다. 해석결과는 이러한 평가방법이 교통시설물에 투자되는 비용을 최소화하면서 최적의 안전수준을 결정할 수 있는 정확하고 유용한 방법임을 보여주었다.

비용최소화와 환경영향을 고려한 철강기술 평가에 관한 연구 : MARKAL 모형의 응용 (A Study on the Model for Iron and Steel Technology Assessment Considering Cost Minimization and Environmental Effects : An Application of MARKAL Model)

  • 김종욱;홍종철;이장우;신희성;손재익;최기련
    • 에너지공학
    • /
    • 제6권2호
    • /
    • pp.188-197
    • /
    • 1997
  • 1992년을 기준으로 2032년을 목표년도로 한 철강기술의 비용경쟁력과 환경영향을 평가하기 위해 MARKAL(MARKet ALlocation)모형을 적용하였다. 철강부문의 에너지, 재료, 그리고 기술에 대한 분석을 통해 기준 철강시스템을 설계하였으며, 특히 국내 철강산업에 대한 분석에 초점을 두었다. 기술평가는 크게 비용최소화와 환경제약 두 측면을 고려하여 수행하였으며, 환경제약을 위해서는 3개의 $CO_2$배출량 규제, 2개의 SOx 비용화 제약방법을 사용하였다. 주어진 비용과 환경 제약하에서 각 철강기술의 경쟁력을 평가하였으며, 이를 통하여 비용 및 환경영향을 고려한 철강기술 평가에 MARKAL모형의 적용 가능성을 확인하였다.

  • PDF

철도노선의 생애주기비용에서 노반건설비와 에너지비용의 상대적 비중 분석 - 경부고속철도 사례를 중심으로 (Comparison of Relative Weights of Cost for Road-bed Construction and Energy on Life Cycle Cost of Railroad -in Case of Seoul-pusan High Speed Rail)

  • 서선덕;김정현
    • 대한토목학회논문집
    • /
    • 제34권4호
    • /
    • pp.1261-1267
    • /
    • 2014
  • 철도노선은 도로노선과 달리 운행비용, 특히 에너지비용이 전체 생애주기 비용에서 차지하는 비중이 높은 것으로 알려져 있다. 본 연구에서는 경부고속철도의 사례를 중심으로 철도 노반건설비와 에너지비용의 상대적 비중을 분석하였다. 이는 최근 활발하게 연구가 이루어지고 있는 전산화된 철도선형 최적화가 단순히 건설비 최소화만을 목적으로 할 수 없으며, 에너지 비용을 포함한 전반적인 생애주기 비용의 최소화를 목표로 하여야 함을 의미한다. 경부고속철도 운행실적이 아직 10년에 불과하기 때문에 향후 20년간의 운영 시나리오를 다양하게 설정하여 분석한 결과, 에너지비용이 건설비용의 10~30% 수준으로 나타났으며, 이는 일반적으로 알려진 비중보다 낮은 수치이다. 철도 선형 최적화를 위한 방법론 정립에 있어 에너지 비용을 고려할 경우, 그 상대적 비중을 고려할 수 있는 방안을 제시한데 본 연구의 의미가 있을 것이다.