• Title/Summary/Keyword: Cost Improvement

Search Result 3,126, Processing Time 0.033 seconds

Productivity Measurement Model Based on Quality Cost (품질 코스트를 적용한 생산성측정 모형)

  • Lee, Jae-Ung;Sin, Yong-Baek
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.48-60
    • /
    • 1993
  • We have depended upon the quantitative analysis for productivity measurement. and excluded the qualitative analysis from productivity measurement. But I think that the qualitative analysis must be considered so as to get a effective productivity measurement This paper intened to establish improvement productivity measurement adopted quality cost of all the qualitative elements.

  • PDF

The Analysis on Power Development Options in Remote Islands and It's Implementation (도서지역 전원개발 대안분석 및 정책 개선방향)

  • Rhee Chang-Ho;Jo In-Seung
    • New & Renewable Energy
    • /
    • v.2 no.2 s.6
    • /
    • pp.108-117
    • /
    • 2006
  • This paper focus on power development options for remote islands. Recently, in accordance with progress in distributed generation technologies including renewable energy sources, many options are possible as power development option for island. At first we estimate generation cost by generation technology then recommend and suggest some countermeasures and implementation for institutional improvement.

  • PDF

Developing noise prediction software for Improvement of the construction noise management (공사장 소음 관리 효율화를 위한 소음예측프로그램 개발)

  • An, Jang-Ho;Lee, Jun-Seo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2009.04a
    • /
    • pp.155-156
    • /
    • 2009
  • Construction companies can easily understand present noise condition of their construction site via C-Noise. C-Noise is noise simulation software that simple to use. Construction companies spend time and cost for public complaints about construction noise. Construction site noise management using noise simulation software like C-Noise can reduce public complaint. achieve cost reduction to treat it.

  • PDF

Analysis of Air Traffic Delays at an Airpor (공항에서의 항공교통 지체현상 분석)

  • Kim, B.J.
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.8 no.1
    • /
    • pp.57-66
    • /
    • 2000
  • Benefit-cost analysis is one of key elements of feasibility study on a large scale investment for transportation infrastructure improvements. Benefit-cost analysis requires measuring expected benefits after the investment is completed. Reduction of delays is the major source for the benefit among other measurable benefits. Measurement methods for delays reduction have been reviewed and two methods were recommended for passenger delay and aircraft operation delay. Using these method, the effects of Cheju International Airport Improvement Projects were evaluated.

  • PDF

자동차엔진의 품질보증데이터 분석

  • Uk, Baek-Jae
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2004.07a
    • /
    • pp.183-190
    • /
    • 2004
  • Found important components in terms of frequency in the assembly (but not in terms of money). Component 39*** was most important. The failure mode was N69(no light on warning signal the cause of the failure was C15(bad connection). Formed a population for each component. Performed reliability and warranty cost analyses At the component level. At the subsystem level. At the system level. **They don'l trust the warranty cost analysis.** Reliability improvement. Among all the subsystems front \ulcorner subsystem is most vulnerable (among other things due to the large number of components in it), especially components 39*** and 28***.

  • PDF

P-RAM 기술의 전망

  • Jeong Hong-Sik
    • Proceedings of the Korean Society Of Semiconductor Equipment Technology
    • /
    • 2006.05a
    • /
    • pp.21-40
    • /
    • 2006
  • [ ${\Box}$ ] Opportunities for PRAM Nearly ideal memory characteristics Potential for high density & low cost memory ${\Box}$ Technical Challenges Writing current reduction is the most urgent issue. ${\to}$ chalcogenide, programming volume, current density, heat loss control Improvement of writing speed, reliability ${\Box}$ Prospects (PRAM as a Mainstream Memory) Evenn, We have demonstrated 256Mb PRAM Realization of high density and low cost PRAM with good reliability will be key succss factor. We need to develop PRAM specific applications.

  • PDF

Improvement on the estimation of workable-quantity per unit time for boring machine (기초공사 천공기계 시간당작업량 산정 개선방안)

  • Ahn, Bang-Ryul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.138-139
    • /
    • 2015
  • Human productivity of Boring Machine for stack is provided but not its hourly workable quantity(Q-value) in the Equipment ownership cost and expenses section of the Poom-Same that is used for construction cost estimation of public sectors in Korea, which leads to less realistic and subjective estimation for the works. The optimized Q-value of the machine is proposed as a result of thorough investigation into many of its operations.

  • PDF

The Performance Evaluation and The Layout Improvement of the Engine Manufacturing Line Using Simulation (시뮬레이션을 사용한 엔진생산라인의 성능평가 및 설계개선)

  • 오필범
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1999.10a
    • /
    • pp.224-228
    • /
    • 1999
  • When we construct a manufacturing plant, optimal design is very important. This paper is to simulate an engine manufacturing flow line for commercial vehicle. The parameters we consider in simulation include facility downtime, tool change time, buffer size between consecutive stations, and time to repair the facility. We use AutoMod to compare the alternatives. The objective is to minimize the total cost. Simulation results provide significant cost saving by improving the current design and policy.

  • PDF

Performance Improvement and Integrated Implementation for Minimum Cost Flow Problem (최소비용문제의 해법 효율화와 통합구현)

  • 정호연
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.67-79
    • /
    • 1997
  • In this paper we develop the integrated software that can compare algorithms of the minimum cost flow problem using PC. The chosen algorithms are the network simplex method, dual network simplex method, and out-of-kilter method, which methods correspond to primal, dual, and primal-dual approach respectively. We also present the improved methods obtaining the initial solution to increase the efficiency of algorithms, and experiment results shown the difference between the entering(dropping) selection rules.

  • PDF

Dynamic COQ Model for Different Quality Levels

  • Liu, Yumin
    • International Journal of Quality Innovation
    • /
    • v.8 no.1
    • /
    • pp.87-98
    • /
    • 2007
  • A COQ model plays an important role in the total quality cost survey. Based on the methodology of continuous quality improvement, a dynamic COQ model for different quality level is developed in this paper. A quality level is defined by Six Sigma level that can be measured by two indicators. The relationships among the four major quality costs are analyzed. Finally, the curves of total quality costs for different quality level are presented.