• 제목/요약/키워드: Cost Approach

검색결과 3,186건 처리시간 0.025초

강상형교의 최적 Life Cycle Cost 설계 (Optimum Life Cycle Cost Design of Steel Box Girder Bridges)

  • 조효남;민대홍;김구선
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1998년도 가을 학술발표회 논문집
    • /
    • pp.151-158
    • /
    • 1998
  • This paper presents an optimal decision model for minimizing the life-cycle cost of steel box girder bridges. The point is that it takes into account service life process as a whole, and the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs and expected failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. The optimal solution identifies those values of the decision variables that result in minimum expected total cost. The performance constraints in the form of flexural failure and shear failure are those specified in the design code. Based on extensive numerical investigations, it may be positively stated that the optimum design of steel box girder bridges based on life-cycle cost approach proposed in this study provides a lot more rational and economical design, and thus the proposed approach will propose the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF

최소기대비용에 기초한 교량의 최적내진신뢰성 (Optimal Seismic Reliability of Bridges Based on Minimum Expected Life Cycle Costs)

  • 조효남;임종권;심성택
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.249-256
    • /
    • 1999
  • This study is intended to propose a systematic procedure for the development of the reliability-based seismic safety and cost-effective Performance criteria for design and upgrading of long span PC bridges. In the paper, a set of cost function models for life cycle cost analysis of bridges is proposed. The total life cycle cost functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect regional economic losses. The damage costs are successfully expressed in terms of Park-Ang median global damage indices and damage probabilities. The proposed approach is successfully applied to model bridges in both regions of a moderate seismicity area like Seoul, Korea and a high one like Tokyo, Japan. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as long span PC bridges.

  • PDF

저가 Redundant Manipulator의 최적 경로 생성을 위한 Deep Deterministic Policy Gradient(DDPG) 학습 (Learning Optimal Trajectory Generation for Low-Cost Redundant Manipulator using Deep Deterministic Policy Gradient(DDPG))

  • 이승현;진성호;황성현;이인호
    • 로봇학회논문지
    • /
    • 제17권1호
    • /
    • pp.58-67
    • /
    • 2022
  • In this paper, we propose an approach resolving inaccuracy of the low-cost redundant manipulator workspace with low encoder and low stiffness. When the manipulators are manufactured with low-cost encoders and low-cost links, the robots can run into workspace inaccuracy issues. Furthermore, trajectory generation based on conventional forward/inverse kinematics without taking into account inaccuracy issues will introduce the risk of end-effector fluctuations. Hence, we propose an optimization for the trajectory generation method based on the DDPG (Deep Deterministic Policy Gradient) algorithm for the low-cost redundant manipulators reaching the target position in Euclidean space. We designed the DDPG algorithm minimizing the distance along with the jacobian condition number. The training environment is selected with an error rate of randomly generated joint spaces in a simulator that implemented real-world physics, the test environment is a real robotic experiment and demonstrated our approach.

A Fuzzy Logic Based Software Development Cost Estimation Model with improved Accuracy

  • Shrabani Mallick;Dharmender Singh Kushwaha
    • International Journal of Computer Science & Network Security
    • /
    • 제24권6호
    • /
    • pp.17-22
    • /
    • 2024
  • Software cost and schedule estimation is usually based on the estimated size of the software. Advanced estimation techniques also make use of the diverse factors viz, nature of the project, staff skills available, time constraints, performance constraints, technology required and so on. Usually, estimation is based on an estimation model prepared with the help of experienced project managers. Estimation of software cost is predominantly a crucial activity as it incurs huge economic and strategic investment. However accurate estimation still remains a challenge as the algorithmic models used for Software Project planning and Estimation doesn't address the true dynamic nature of Software Development. This paper presents an efficient approach using the contemporary Constructive Cost Model (COCOMO) augmented with the desirable feature of fuzzy logic to address the uncertainty and flexibility associated with the cost drivers (Effort Multiplier Factor). The approach has been validated and interpreted by project experts and shows convincing results as compared to simple algorithmic models.

거래비용접근방법 불확실성요인과 거래관계성이 채널 충성도에 미치는 영향에 관한 연구 (The Influence of Transaction Cost Approach Factor on Channel Loyalty)

  • 이지은
    • 경영과정보연구
    • /
    • 제33권2호
    • /
    • pp.281-299
    • /
    • 2014
  • 소비의 득실에 따라 구매를 결정하는 구매자성향을 고려하여 본 연구는 채널충성도를 설명하기 위해서 거래비용이론의 불확실성을 검토하고 적용하였으며 거래빈도와 신뢰를 통하여 채널과 소비자와의 관계를 입증함으로써 유통채널구조에 대한 폭넓은 이해를 제공하고자 하였다. 채널충성도를 검증함에 있어서 거래비용접근방법(transaction cost approach) 요인을 고려하여 입증하였다. 채널충성도를 설명하기 위해서 거래비용접근방법 요인 중 불확실성을 검토하고 적용하였으며 거래빈도와 신뢰를 통하여 유통채널과 소비자와의 관계를 입증함으로써 유통채널구조에 대한 폭넓은 이해를 제공하고자 하였다. 연구결과를 바탕으로 유통채널상에서 채널관리전략을 수립하는 기업들에게 실무적 시사점을 제공하고자 한다.

  • PDF

A Bayesian approach to maintenance strategy for non-renewing free replacement-repair warranty

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • 제12권1호
    • /
    • pp.41-48
    • /
    • 2011
  • This paper considers the maintenance model suggested by Jung and Park (2010) to adopt the Bayesian approach and obtain an optimal replacement policy following the expiration of NFRRW. As the criteria to determine the optimal maintenance period, we use the expected cost during the life cycle of the system. When the failure times are assumed to follow a Weibull distribution with unknown parameters, we propose an optimal maintenance policy based on the Bayesian approach. Also, we describe the revision of uncertainty about parameters in the light of data observed. Some numerical examples are presented for illustrative purpose.

  • PDF

원자력 발전소의 최적 운행중지 시기 결정 방법 (Deciding the Optimal Shutdown time of a Nuclear Power Plant)

  • 양희중
    • 산업공학
    • /
    • 제13권2호
    • /
    • pp.211-216
    • /
    • 2000
  • A methodology that determines the optimal shutdown time of a nuclear power plant is suggested. The shutdown time is decided considering the trade off between the cost of accident and the loss of profit due to the early shutdown. We adopt the bayesian approach in manipulating the model parameter that predicts the accidents. We build decision tree models and apply dynamic programming approach to decide whether to shutdown immediately or operate one more period. The branch parameters in decision trees are updated by bayesian approach. We apply real data to this model and provide the cost of accidents that guarantees the immediate shutdown.

  • PDF

구조 수명간 지진위험도를 고려한 연속 PSC교의 LCC 최적 내진설계 (Optimum Life-Cycle Cost-Effective Seismic Design for Continuous PSC Bridges Considering Lifetime Expected Seismic Risks)

  • 조효남;이광민;박경훈;김평석
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2004년도 춘계 학술발표회 제16권1호
    • /
    • pp.720-723
    • /
    • 2004
  • This study is intended to propose a systematic approach for determining optimum Life-Cycle Cost (LCC)-effective seismic design for continuous PSC bridges considering lifetime expected seismic risks. In the paper, a set of cost function for LCC analysis of bridges is proposed. The total LCC functions consist of initial cost and direct/indirect damage costs considering repair/replacement costs, human losses and property damage costs, road user costs, and indirect socio-economic losses. The damage costs are expressed in terms of Park-Ang median global damage indices (Park and Ang, 1985) and lifetime damage probabilities. The proposed approach is applied to model bridges of both moderate seismicity regions like Korea and high seismicity regions like Japan. Since, in case of bridges, a number of parameters may have an influence on optimal target reliability, various sensitivity analyses are performed in this study. It may be expected that the proposed approach can be effectively utilized for the development of cost-effective performance criteria for design and upgrading of various types of bridges as well as continuous PC bridges.

  • PDF

시스템 다이내믹스를 이용한 농업용수 재이용시스템 경제성 분석 (Economic Analysis of Wastewater Reuse Systems for Agricultural Irrigation using a System Dynamics Approach)

  • 정한석;서교;장태일;성충현;김학관;박승우
    • 한국농공학회논문집
    • /
    • 제55권2호
    • /
    • pp.9-20
    • /
    • 2013
  • Many studies have reported additional treatment is needed to use wastewater for agricultural purpose. Economic considerations should be taken into account to establish infrastructure for agricultural reuse because of a large amount of water use in irrigation and relatively low water quality requirement. The objective of this study was to conduct economic analysis of wastewater reclamation and reuse systems for agriculture. A system dynamics approach considering complexity and dynamics in the wastewater reuse systems was used for the economic analysis, which are related with social, environmental, and economic problems. Sensitivity and benefit cost analysis for wastewater reuse systems was conducted through the established economic assessment model. The result of sensitivity analysis showed that water resources development and installation cost were the most sensitive for total benefits and costs, respectively. The scenario-based test of the organized economic assessment model shows marginal cost ranges and enables decision-makers to decide reasonable cost for the wastewater reuse systems for agriculture.

중앙창고 입지선정을 위한 회귀분석기반 해법 (A Regression-Based Approach for Central Warehouse Location Problem)

  • 유재욱;이동주
    • 산업경영시스템학회지
    • /
    • 제32권2호
    • /
    • pp.57-65
    • /
    • 2009
  • In continuous review inventory model, (${\varrho}$, ${\gamma}$) system, order quantity(${\varrho}$) and reorder point(${\gamma}$) should be determined to calculate inventory-related cost that consists of setup, holding, and penalty costs. The procedure to obtain the exact value of ${\varrho}$ and ${\gamma}$ is complex. In this paper, a regression analysis is proposed to get the approximate inventory-related cost without the determination of ${\varrho}$ and ${\gamma}$ in the case that the standard deviation(${\sigma}$) of the lead time demand is small or that the mean(${\mu}$) of the lead time demand is proportional to ${\sigma}$. To save inventory-related cost, central warehouses with (${\varrho}$, ${\gamma}$) system can be built. Central warehouse can provide some stores with products with the consideration of the tradeoff between inventory-related cost and transportation cost. The number and the location of central warehouses to cover all the stores are determined by a regression-based approach. The performance of the proposed approach is tested by using some computational experiments.