• Title/Summary/Keyword: Contract standard

Search Result 282, Processing Time 0.021 seconds

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

The Future of BlockChain Technology Leading Innovation in the Industrial Ecosystem (산업 생태계의 혁신을 선도할 블록체인 기술의 미래전망)

  • Kim, Jung-Sook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.6
    • /
    • pp.324-332
    • /
    • 2018
  • Blockchain technology has the potential to revolutionize trust models and business processes in a variety of industries. However, it is considered to be the initial stage of the system that pursues autonomy rather than efficiency, and it is necessary to monitor and inspect the distributed ledger technology from the price and introduction time as compared with the existing relational DB transaction technology. However, domestic and foreign private sectors have already been activated by applying block-chain technology in the national domain, and the block chain is devoid of doubt that it is an exaggerated technology, characterized by the invariance of the record, transparency, and autonomous execution of business rules. It has begun to be utilized in history, identity, certification and auditing in the financial industry as well as various industries. In this paper, we analyze the problems such as security weakness, insufficient regulatory environment, technical consensus and lack of common standard. In addition, the business sense and possibility of the block chain technology is expected to be the innovation of the industrial ecosystem by entering into the reality system from the concept through monitoring the actual introduction performance in the field of copyright, logistics, health care and environment.

Critical Success Factors for Nuclear Power Plant Construction Projects (원전건설의 성공적인 시공을 위한 핵심성공요인(CSFs) 도출)

  • Shin, Gisung;Bang, Seongdeok;Kim, Kyeongseok;Kim, Hyoungkwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.1
    • /
    • pp.48-57
    • /
    • 2017
  • The construction of the first nuclear power plant (Kori #1) in Korea started in 1971, Korea operates 24 nuclear power plants and is constructing 4 in 2015. During about 45 years of construction experience, insufficient studies have been investigated for the identification of critical success factors(CSFs) for nuclear power plant construction. Based on literature reviews and focus group interviews, this study presented a list of CSFs for construction of nuclear power plants. A survey for validating the results of CSFs was conducted with 164 experts. This study indicates that attentions should be placed upon the lowest price-based contract awarding policy, the need for reasonable pricing standard implementation, database development, and deployment for experienced nuclear power plant construction workers, identification and nurturing of competitive subcontractors, and minimization of lag times in construction activities.

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

MODTRAN 모델을 이용한 다목적 실용위성 2호 MSC의 입사복사량 계산

  • Kim, Yong-Seung;Kang, Chi-Ho
    • Aerospace Engineering and Technology
    • /
    • v.1 no.1
    • /
    • pp.173-176
    • /
    • 2002
  • This report summarizes the results of MODTRAN model that are used for the calculation of input radiance of the KOMPSAT-2 Multispectral Camera (MSC). We have calculated the input radiances for four months: January 15, April 15, July 15 and October 15. Annual averages are the arithmetic mean of results from four months. We used the mid-latitude winter and summer for the month of January and July, respectively, while US standard atmospheres are used for April and October. The orbital characteristics of KOMPSAT-2 and the seasonal variations of solar zenith angle over the Korean peninsula were incorporated as inputs to the model. The tropospheric aerosol extinction (visibility = 50 km) was assumed. The surface albedo used in the model calculation represents the global annual mean clear-sky albedo. MSC contract values are found to be considerably greater in the MSC spectral range than the total radiances calculated with the above general conditions. From these results, it can be inferred that the forthcoming MSC images would be somewhat dark. We certainly need a countermeasure for this issue.

  • PDF

Challenges and Solutions of Electronic Journal Consortium (전자저널 컨소시엄의 당면과제와 해결방안 모색)

  • Kim, Sang-Jun
    • Journal of Information Management
    • /
    • v.41 no.4
    • /
    • pp.93-118
    • /
    • 2010
  • This study was aimed to establish a workable strategies to operate KESLI consortium reliably. To encourage the research purposes, it was mainly investigated international literature on current challenges for the e-journals consortium in comparison with the domestic implications. Major issues and challenges are divided to six items by scholarly communication changes and e-journals percentage increase, a big deal for a contract -based consortium pricing model in vogue, a consortium of the price hikes and making budget difficulties, use the standard statistics by the results of the use, archiving and archive security uncertainty, and contracts public availability of such external conditions. As a result, the international challenges of E-journals consortium was similar to KESLI, but the depth of information and research on domestic was weaker than the international research. To see more research and a rational perception based on scientific evidence and alternatives that enable KESLI working in the field was needed to be.

Analysis of the Necessity of Introducing the Obligation to Take Safety and Health Measures for Construction Orderers using Multivariate Analysis (다변량 분석을 이용한 건설업 발주자의 안전보건조치 의무 도입 필요성 분석)

  • Lim, Se Jong;Seo, Jae Min;Won, Jeong-Hun;Kim, Chang-Won
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.1
    • /
    • pp.20-29
    • /
    • 2022
  • To stem the ever-prevalent occurrence of industrial accidents in the construction industry, which is emerging as a social problem, efforts must be invested by various stakeholders. Specifically, among stakeholders, the orderer is at the top of a project's decision-making structure. Therefore, the orderer's awareness of safety and health directly affects the process of securing the safety of the overall construction site. In this light, the present study aims to identify differences in the perceptions of each stakeholder regarding the obligatory safety and health measures for clients that have recently been introduced. In addition, it suggests specific implementation plans in the Korean context. The data used for analysis were collected through a survey targeting stakeholders such as orderers, safety managers, and site managers, and the collected data were quantitatively reviewed by using multivariate analysis methods such as analysis of variance. As a result of the analysis, the introduction of safety and health obligations for the owner was found to be necessary, and the designation and operation of safety and health experts as an action plan was deemed reasonable. The authors expect that the results of this study can be used as basic data for revising the related regulations in Korea. Moreover, as a further study, a review of the effectiveness after improving regulations would contribute strongly to the domain.

The Foreign Asset Leverage Effect of Oil & Gas Companies after the Financial Crisis (금융위기 이후 정유산업의 외화자산 레버리지효과 분석)

  • Dong-Gyun Kim
    • Korea Trade Review
    • /
    • v.46 no.2
    • /
    • pp.19-38
    • /
    • 2021
  • This study aims to analyze the foreign asset leverage effect on Korean oil & gas companies' foreign profits and to maintain the appropriate foreign asset volume for reducing exchange risk. For a long time, large Korean companies, including oil companies, overheld foreign currency liabilities. For this reason, most large companies have been burdened to hedge exchange risk and this excess limit holding deteriorated total profit and reduced foreign currency asset management efficiency. Our paper proceeds in presenting a three-stage analysis considering diversified exchange risk factors through estimation on transformation of foreign transactions a/c including annual trends of foreign asset and industry specifics. We also supplement incomplete the estimation method through a practical hedging case investigation. Our research parts are differentiated on the analyzing four periods considering period-specifics The FER value of the oil firms ranged from -0.3 to +2.3 over the entire period. The results of the FER Value are volatile and irregular; those results do not represent the industry standard comparative index. The Korean oil firms are over the credit limit without accurate prediction and finance high interest rate funds from foreign-owned banks on the basis on a biased relationship. Since the IMF crisis, liabilities of global firms have decreased. Above all, oil firms need to finance a minimum limit without opportunity losses on the demand forecast and prepare for uncertainty in the market. To reduce exchange risk from the over-the-limit position, we must consider factors that affect the corporate exchange risk on the entire business process, including the contract phase.

A Study on Expected Dispute Arbitration in Supply Chain ESG Management: Focusing on the cases of POSCO and NAVER (공급망 ESG 관리에서 예상되는 분쟁 중재에 관한 연구 - 포스코와 네이버 사례를 중심으로 -)

  • Lee, Geonwoo;Lee, Jungeun;Lee, Hunjong
    • Journal of Arbitration Studies
    • /
    • v.34 no.1
    • /
    • pp.75-101
    • /
    • 2024
  • "ESG management" guides companies to prioritize corporate social responsibility and sustainable development as key management objectives, going beyond mere financial performance pursuits. This approach involves creating a sustainable and robust supply chain by urging companies, acting as 'supply chain managers', to implement ESG management practices alongside their 'supply chain partners'. The domestic business community has been quick to respond to this trend, recognizing that failure to adhere to ESG standards set by organizations such as the EU and SEC could lead to severe repercussions, including exclusion from international trade and reputational damage. POSCO and NAVER, two leading Korean companies, are at the forefront of practicing ESG management effectively. They have both produced and publicly disclosed ESG management reports, showcasing their success in enhancing supply chain ESG management. However, as supply chain managers enforce ESG-related obligations on their suppliers, the likelihood of disputes between the parties may increase. In scenarios where supply chain ESG management leads to conflicts between supply chain managers and suppliers, commercial arbitration emerges as a viable solution for dispute resolution. This method offers several advantages, including the arbitrators' expertise, time and cost efficiency, the binding nature of decisions akin to a court's final judgment, international recognition under the New York Convention, confidentiality, and ample opportunity for parties to be heard. Our analysis focuses on the emerging disputes between supply chain managers and suppliers within the context of supply chain ESG management, particularly examining the cases of POSCO and NAVER. By categorizing the expected types of disputes and assessing the appropriateness of commercial arbitration for their resolution, we highlight the effectiveness of this approach. Furthermore, we propose leveraging the Korean Commercial Arbitration Board's role to enhance the use of arbitration in resolving supply chain ESG disputes, underscoring its potential as a strategic tool for maintaining sustainable and harmonious supply chain relationships.

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.