• 제목/요약/키워드: Contingency Analysis

검색결과 287건 처리시간 0.033초

제주계통의 STATCOM 상정사고를 고려한 전력품질 해석 (Power Quality Analysis Considering Contingency of STATCOM in Jeju Power Grid)

  • 고지한;김동완;김승현;김호민;김일환
    • 한국태양에너지학회 논문집
    • /
    • 제34권2호
    • /
    • pp.91-97
    • /
    • 2014
  • This paper presents the modeling and contingency analysis of Jeju power system. For the analysis of contingency with simulation, thermal power plants, current source type HVDC systems, wind farms, STATCOMs and Jeju power load are modeled by PSCAD/EMTDC program. And three kinds of simulation are carried out. Firstly, two STATCOMSs are in normal operation. Secondly, one STATCOM is in fault. Lastly, all of STATCOMs are in fault. These comparative studies will be useful for evaluating the effectiveness of STATCOM to stabilize for the Jeju power system.

온라인 고속 상정사고 선택에 관한 연구 (A Study on the on-line fast Automatic Contingency Selection)

  • 송길영;김영한;노대석
    • 대한전기학회논문지
    • /
    • 제36권5호
    • /
    • pp.309-318
    • /
    • 1987
  • In the on-line security analysis of power system, Automatic Contingency Selection (ACS) is commonly used to reduce the number of contingency cases which will be evaluated in detail. This paper describes a fast and reliable ACS method which adopts DC load flow in conjunction with compensation theorem to improve execution time, and applies severity performance index, divided on each limit level for considering overload rate, to make reliable contingency ranking. The method has been tested in IEEE 25 bus system and KEPCO 130 bus actual power system. The results of these tests verify its superiority to both the execution time and reliability, and illustrate its effectiveness for the practical use.

  • PDF

수학적 대상의 존재와 우연성 (The Existence of Mathematical Objects and Contingency)

  • 최원배
    • 논리연구
    • /
    • 제12권2호
    • /
    • pp.1-29
    • /
    • 2009
  • 유명론자인 필드에 따르면, 수학적 대상은 존재하지 않지만 존재할 수도 있었다. 이 글의 목적은 이런 필드의 '우연적' 유명론이 설득력이 있는지를 살펴보는 데 있다. 이를 위해 나는 여기서 필드와 플라톤주의자인 헤일과 라이트 사이에 벌어진 논쟁을 분석하고 평가한다. 나는 설명의 요구 논증은 여전히 유효하지만, 거기서 사용된 일반 원리를 뒷받침해줄 별도의 논증이 필요하다고 주장하며, 반절연 원리에 근거한 비판의 경우 그 원리 자체에 이미 각 진영의 철학적 입장이 전제되어 있다고 주장한다.

  • PDF

우연성과 설명의 요구 논증 (Contingency and the Argument of Explanation-Requirement)

  • 김세화
    • 논리연구
    • /
    • 제14권1호
    • /
    • pp.103-118
    • /
    • 2011
  • 최원배 교수는 논문 "수학적 대상의 존재와 우연성"에서 하트리 필드, 그리고 헤일/라이트 사이에서 벌어진 논쟁을 다룬다. 이들 사이에서 벌어진 논쟁은 간단하게 말해서 수학적 대상의 존재/비존재가 우연적이라면 이것에 대한 설명이 있어야 한다고 요구하는 헤일과 라이트의 주장과 그에 대한 설명이 있을 필요가 없다는 필드의 반박이라고 할 수 있다. 본 논문에서 필자는 최원배 교수의 논문에 대해 3가지의 의문점을 제기한다. 첫 번째와 세 번째 의문점은 최원배 교수의 논의에서 중요한 구분이 분명히 제시되어 있지 않거나 다소 잘못 이해한 부분이 있다는 것이고, 두 번째 의문점은 최원배 교수의 논증에 대한 반론이다.

  • PDF

발전량 변화와 미소신호안정도 상정사고 해석 (Contingency Analysis of Small Signal Stability for MW Changes)

  • 심관식;송성근;문채주;김용구;남해곤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.139-141
    • /
    • 2002
  • This paper describes a new contingency analysis methods for small signal security assessment based on the eigenvalue perturbation. The eigenvalue perturbation with respect to MW changes can be used to find possible sources of the low frequency oscillation, and to select contingency for small signal stability. The proposed algorithm has been successfully tested on the KEPCO systems.

  • PDF

Python 기반 WSCR 강건 지수를 이용한 미래계통 구축에 관한 연구 (A Study on Future System Construction Using WSCR Strengthness Index based on Python)

  • 박성준;허진;김현진;조윤성
    • 전기학회논문지
    • /
    • 제67권8호
    • /
    • pp.994-1001
    • /
    • 2018
  • In this paper, to studied about future power system construction using PSS / E-Python API. Python-based future system automatical construction methods and modeling of renewable sources. it confirmed the stability of the powert system for each renewable area by calculating the weighted short circuit ratio (WSCR) index. it calculated the short circuit ratio (SCR) and selected the transmission line linkage scenario to improve the stability of vulnerable areas. it confirmed the WSCR index improvement through the selected transmission line linkage of scenario, and analyzed the stability of the renewable power system applying the scenario. It describes Facts and Shunt devices adjustment for the load flow convergence. It describes the stable methed of the bus voltage through the transformer Ratio Tap adjustment. By performing PSS/E ASCC using the Python it was performed three-phase short circuit fault capacity analysis, it is confirmed whether excess of the fault current circuit breaker capacity. In order to contingency accident analysis, it have described the generation of one or two line list of each areas using the Python. The list is used to contingency analysis and describe the soluted of the transmission line overload through comparison before and after adding the scenario line.

복구능력을 고려한 배전계통 상정사고 해석법 (Distribution contingency analysis considering restoration capability)

  • 박정은;김형승;최면송;이승재
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.318-320
    • /
    • 2015
  • The distribution system is operated radially in which electrical grid is complex. If a fault occurs in distribution system, it can make a huge impact on power supply. Therefore, The distribution contingency analysis is proposed in this paper based on the reference [1]. Using RSI (Restoration Section Index) calculated by feeder margin and section load, the operator can grasp restoration capability quickly.

  • PDF

TPLAN 프로그램을 적용한 전력계통 정상상태 상정사고 해석 고찰 (A Review of Steady State Contingency Analysis of Power System Using TPLAN Program)

  • 김동준;김호용;김태옥;심정운
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.116-118
    • /
    • 2003
  • This paper describes the contingency analysis methods which are used in the transmission reliability program, TPLAN. Reliability criterion, reliability assessment, ranking methods, and screening methods are discussed. In addition, a simple 25-bus system was tested with TPLAN and its analyses are presented in this paper.

  • PDF

COMPENSATION STRUCTURE AND CONTINGENCY ALLOCATION IN INTEGRATED PROJECT DELIVERY SYSTEMS

  • Mei Liu;F. H. (Bud) Griffis;Andrew Bates
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.338-343
    • /
    • 2013
  • Integrated Project Delivery (IPD) as a delivery method fully capitalizes on an integrated project team that takes advantage of the knowledge of all team members to maximize project outcomes. IPD is currently the highest form of collaboration available because all three core project stakeholders, owner, designer and contractor, are aligned to the same purpose. Compared with traditional project delivery approaches such as Design-Bid-Build (DBB), Design-Build (DB), and CM at-Risk, IPD is distinguished in that it eliminates the adversarial nature of the business by encouraging transparency, open communication, honesty and collaboration among all project stakeholders. The team appropriately shares the project risk and reward. Sharing reward is easy, while it is hard to fairly share a failure. So the compensation structure and the contingency in IPD are very different from those in traditional delivery methods and they are expected to encourage motivation, inspiration and creativity of all project stakeholders to achieve project success. This paper investigates the compensation structure in IPD and provides a method to determine the proper level of contingency allocation to reduce the risk of cost overrun. It also proposes a method in which contingency could be used as a functional monetary incentive when established to produce the desired level of collaboration in IPD. Based on the compensation structure scenario discovered, a probabilistic contingency calculation model was created by evaluating the random nature of changes and various risk drivers. The model can be used by the IPD team to forecast the probability of the cost overrun and equip the IPD team with confidence to really enjoy the benefits of collaborative team work.

  • PDF

플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석 (A Comparative Analysis of Risk Assessment Depending on International Project Types)

  • 백승원;한승헌;정우용
    • 한국건설관리학회논문집
    • /
    • 제20권5호
    • /
    • pp.125-136
    • /
    • 2019
  • 본 연구는 국내 대형 건설 기업이 수행한 124건의 해외사업에 대해 입찰 전 예측 리스크, 수주 후 실제 리스크, 예비비 반영률, 원가 상승률 등을 조사하였다. 이를 기반으로 플랜트, 건축, 토목 공종별 예측 리스크 수준, 실제 리스크 수준, 입찰 전 예측 리스크와 예비비 간 관계, 실제 리스크와 원가 상승률의 상관성을 분석하여 다음과 같은 결론을 얻었다. 첫째, 플랜트와 토목 사업은 건축 사업에 비해 예측 리스크와 실제 리스크 수준이 높았다. 특히, 플랜트와 토목 사업에서는 국가 리스크가 가장 높았으나 건축사업에서는 프로젝트 리스크가 가장 높았던 것으로 나타났다. 둘째, 플랜트와 토목 사업이 건축 사업보다 예비비를 많이 설정하였으나 입찰 전 예측 리스크 수준과는 상관성이 없었다. 이는 우리 기업의 예비비 산정에 문제가 있음을 내포하고 있다. 셋째, 세 개 공종 모두 실제 리스크 발생 수준과 원가 상승률 사이에 유의미한 상관성이 존재하는 것으로 나타났다. 이는 리스크 관리가 실행원가 관리에 중요한 요소임을 보여준다. 본 연구에서 도출된 결과는 국내 기업들의 공종별로 차별화된 보다 실전적인 리스크 관리를 지원할 것으로 기대된다.