In terms of deregulation requests from business, incidents at construction sites are rapidly increasing after reducing the regular safety training hours. Especially, to prevent incidents through safety trainings for construction site workers, who have lots of hazardous tasks than general manufacturing, is not only to protect property of both the companies and the country but also to increase their profits. That is why there are loud voices regarding that the safety training is a core mandatory to prevent industrial incidents. But, most companies, as soon as the deregulation for safety training is implemented, mitigated conducting safety trainings to prevent incidents. With this, the incidents are currently to be increased and caught in a vicious circle of many incidents at the smaller companies because of their absentmindedness regarding safety training due to their poorness as subcontractors of major companies, comparing to major companies. This study explains that the difference between managers and workers are existing about safety awareness and knowledge. And, we confirmed that the educational factor led by deficiency of safety awareness and knowledge was the major factor.
Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.
According to industrial accident analysis of the Ministry of Employment and Labor in 2013, 38 workers were injured by fall accidents on average per day, and one worker died on average per day among them. In various industries such as heavy and construction industry, the full body harness is commonly used to prevent the fall accident. In developing full body harness, the designer considered only the workers' safety, without taking into account comfort and workability. The survey was conducted so as to search the problems of full body harness currently used by workers in heavy and construction industry. The survey questionnaire was given to 565 workers wearing full body harness in heavy and construction industry. The results of study showed that the development of new full body harness considering body size of korean was needed. The impotent factors for developing of new full body harness were the size and the weight of the full body harness. The full body harness taking into account body size was judged to contribute to more comfortable work, work efficiency and safety. The result of this study can be utilized as useful data in the development of new full body harness considering the body size of korean workers.
The purpose of this study is to propose and introduce Accidents Prevention Remedies(APRs) and their priorities especially for Accident Causing factors(ACFs) drawn by surveying and analyzing how much foreign workers in Korea have been exposed to dangers at a construction site. At frist as a result of the analysis of the questionnaire which 59 foreign industrial trainees working at the construction sites in Seoul-Kyunggi area had responsed, 12 ACFs and 11 APRs were put out by using the SPSS programme. Then, through the Analytic Hierarchy Process(AHP) about the questionnaire from 96 safety and civil engineers who have experienced in managing foreign labor at the construction sites all over the country, the APRs given their priorities of relative importances are as follows; First, it is absolutely necessary that every working order to foreign workers should be made more definitely in accordance with a concrete process schedule. Second, the owners should increase investments in improving foreign workers' welfare in order to minimize their potential human error. Third, Korean language education programme for simple technical terms should be made and executed at least.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.714-717
/
2007
This paper presents the findings that may be useful for establishing safety policies involved with safety plan, program, and control relative to fatal accidents in construction job site. The fatal accident investigation database maintained by Korean Production Household Mascot Safety Industrial Complex is accessed. The 5 years fatal accidents occurred in 2002 to 2006 were analyzed. The statistic relative to the fatal accidents in different project types is obtained using different classifications such as occupation, years of experience, accident type, and time in a day. This research would contribute to ensure the effectiveness of safety policy so as to enhance worker safety.
The purpose of this study is to investigate the correlation between aluminum form work and noise-induced deafness by conducting special health examination on construction aluminum worker and noise measurement at the workplace. All the 11 aluminum form workers were diagnosed with noise-induced deafness after holding a special health examination. The workers have not had any previous history of noise-induced deafness which indicates that aluminum form work is related to noise-induced deafness disease. The impact noise of 120 dB(A)~125 dB(A), which exceeds the regulations of industrial safety and health act, was found during the dismantling rather than installation when noise measurement was made at the aluminum workplace. The aluminum form workers could permanently lose the hearing sense if they are exposed to this impact noise. This study is to suggest the method to prevent noise-induced deafness for aluminum form workers by firstly giving out hearing protection equipment at the construction site and secondly installing rubber mat, soundproof panel as well as changing the noise-lowering technique.
International conference on construction engineering and project management
/
2022.06a
/
pp.1138-1145
/
2022
While pursuing digitalization and paperless projects, the construction industry needs to settle on how to make the most of digitized data and information. On-site workers, who currently rely on paper documents to check and review design and construction plans, will need alternative ways to efficiently access the information without using any paper. Augmented Reality is a potential solution where the information customized to a user is aligned with the physical world. This paper proposes the Augmented Reality framework to deliver the information on on-site resources (e.g., workers and equipment) using head-mounted devices. The proposed framework was developed by interoperating Augmented Reality-supported devices and a digital twin platform in which all information related to ongoing tasks is accumulated in real-time. On-site resources appearing in the user's field of view are automatically detected by an object detection algorithm and then assigned to the corresponding information by matching the data in the digital twin platform. Preliminary experiments show the feasibility of the proposed framework. Worker detection results can be visualized on HoloLens 2 in near real-time, and the matching process obtained the accuracy greater than 88%.
Kim Hong-Ryul;Yu Il-Han;Kim Kyung-Rai;Shin Dong-Woo
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.316-322
/
2002
In case of reducing working time, it is difficult that the construction industry is analyzed far-reaching effects caused by a reduction of working time, by approaching with just the total amount of work. Because it has the properties such as the singularity, the outdoor using, a sense of the season unlike other industries. In order to analyze the effect of a reduction of working time on the construction industry, the example of a reduction of working time in domestic other industries related with it was analyzed intensively first. And an example in Japan, which is similar to our existing related laws and industrial structure among foreign construction industries was analyzed, and a relation with the domestic construction industries and an issue were drown a conclusion. This was applied to a field worker and a related main group participating in a real production. And it showed the prediction model for a working pattern and a dealing plan to prepare in a construction site by predicting a working pattern in the management side of a construction site annually.
Journal of the Korea Institute of Building Construction
/
v.13
no.6
/
pp.619-626
/
2013
Many pictures are taken at a construction site, but the information of the pictures is not managed in an efficient and systematic manner. For this reason, when a construction worker has scant field experience or knowledge, it is hard to communicate with others efficiently. Therefore, the information of the pictures taken is not fully utilized in any deliberation or conflict among interested parties, facilities maintenance, and construction of another structure, although they were taken for those purposes. This study discusses the need for combining vector-photos with image and 5W and 1H information, and develops a prototype module for creating vector-photos and saving them in a server. The vector-photos taken can be saved to a server in real time, and efficiently managed by a DB system. If a system to link the vector-photos with a BIM model is developed in the future, it is expected that the vector information in the picture can be connected with the property information of an object. As a result, the vector-photos can be utilized in more diverse ways.
International conference on construction engineering and project management
/
2009.05a
/
pp.1113-1116
/
2009
The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.