• Title/Summary/Keyword: Construction site office

Search Result 122, Processing Time 0.034 seconds

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

A Novel Treatment Method for the Wastes of Unsanitary Landfill at the Residential Development Site (택지개발 현장 내 비위생매립지의 매립쓰레기 처리방안 연구)

  • Son, Young-Gyu;Park, Beom-Guk;Lim, Myung-Hee;Kim, Won-Jang;Khim, Jee-Hyeong
    • Journal of Environmental Science International
    • /
    • v.17 no.2
    • /
    • pp.177-183
    • /
    • 2008
  • Characteristic of wastes in a unsanitary landfill at the residential development site in H city, Kyunggi-do was investigated for the disposal of huge amount of wastes. The total amount of wastes was estimated at 117,000 ton and construction solid wastes and municipal solid wastes were detected together. The portion of combustibles was very low and soils, concrete wastes, and pebbles were the major components in landfilled wastes. Because the site was the residential development site, the landfilled wastes should be removed immediately for the construction. Therefore the way that the unsanitary landfill was excavated and the wastes were sorted into three categories such as soils, noncombustibles and combustibles was selected as the best method. Soils and noncombustibles could be recycled and sorted combustibles could be re-landfilled in a smaller area or incinerated.

Development of Technical Breakdown Structure Standard in Temporary Works (건설가설공사의 표준기술분류체계 구축)

  • Park, Jun-Mo;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

Application Method of Remote Site Monitoring in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 적용방안에 관한 연구)

  • Ok, Hyun;Kim, Seong-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.12
    • /
    • pp.6550-6557
    • /
    • 2013
  • The public road construction projects awarded by the regional construction and management office, which is an affiliate of the Ministry of Land, Infrastructure and Transport, are managed by construction supervision officers. These officials frequently visit a large number of construction sites to conduct inspections and supervision tasks. Therefore, the site management efficiency is essential in terms of the time and money spent in travelling to the sites. The introduction of a site monitoring management system is considered necessary to minimize the number of site visits and enable remote monitoring of the construction progress to enhance the business efficiency of the construction supervision officers. In this study, a remote site monitoring system was constructed using web cameras for public road construction works. The trial applications were implemented by selecting ten constructions sites. The effectiveness of the system was analyzed to assess its applicability. In an assessment of the applicability of the verification results, remote site monitoring showed cost savings of approximately 35% compared to the existing site management. The guidelines for applying the site monitoring management system were provided, the introduction plan was investigated, and the improvement method was presented. The results showed that the system is likely to minimize the unnecessary site visits, remove the risk factors at vulnerable areas in the sites beforehand, and prevent a range of disasters and accidents. In addition, the quality of the infrastructures is likely to improve through the prevention of accidents and the elimination of substandard and faulty construction work.

Implementation of Ubiquitous-Based Construction Site Management System (유비쿼터스 기반 건설현장 관리시스템의 구현)

  • Yeon, Sang-Ho;Lee, Young-Wook
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.13 no.2
    • /
    • pp.239-244
    • /
    • 2013
  • A ubiquitous-based construction site management system coupled with construction processing status of a 3-D spatial information and sensor network for construction site management is implemented. The service of such management system is able to save efforts and times to check the processing status of construction sites and more the related construction staff in charge can receive the real time information of construction field or the related information can be transmitted to the office where the construction staffs in charge are. Especially we can provide on a mobile smart phone of real time processing status at construction field and environmental information of such temperature, humidity, information of GPS, etc. which are able to affect the construction status. In addition, construction processing and design modification etc. as well as necessary informations are able to be helped and provided at any time and to any place.

Annual Intensities (2016-2017) Analysis of Energy Use and CO2 Emission by End Use Based on Measurements of Sample Office Building (표본건물 계측에 의한 업무시설에서의 용도별 에너지사용량 및 CO2 배출량 연간 원단위 (2016 - 2017) 분석)

  • Lim, Han-Young;Lim, Su-Hyun;Jin, Hye-Sun;Kim, Sung-Im;Lee, Soo-Jin;Lim, Jae-Han;Song, Seung-Yeong
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.8
    • /
    • pp.19-27
    • /
    • 2018
  • In this study, annual site and primary energy use intensities (EUIs) and $CO_2$ emission intensities (CEIs) per area by end use were estimated based on the measurement data from June 2016 to May 2017 of 19 sample office buildings in Seoul. In addition, the estimated site EUIs by end use were compared to the U.S. Commercial Buildings Energy Consumption Survey (CBECS) 2012 data. Average site EUIs by end use were found to be in the order of electric appliance (typical floors) > heating > cooling > lighting > air movement > domestic hot water > vertical transportation > city water supply. In the case of primary EUIs and CEIs by end use, electric appliance was found to be the largest. As results of comparison with the CBECS 2012 data, it was found that the site EUIs were similar for heating, cooling, domestic hot water, and electric appliance, etc., but slightly different for lighting and air movement. The number of sample office buildings will continue to increase until 2020 (total number of samples 85) and intensities data by end use will be continuously updated through continuous collection of measurement data.

Landscape Design of Busan Yeonje Post Office (부산연제우체국청사 조경설계)

  • 김정수;최연철
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.30 no.6
    • /
    • pp.109-118
    • /
    • 2003
  • This design is for the landscape of Busan Yeonje Post Office. The design requirements were: the preparation of an open space, the expression of regional identity, total design concept, and application of environmentally-friendly materials. The Busan Yeonje Post Office is not a just post office building but also a place for people including a communications center, rental offices, and a post office, facilities which require publicity, functionality, and symbolism. Therefore, this design reflected the design requirements, and considered the following to include the theme of "Pleasant messages and a pleasant post office with vitality and comfort. First, the open space was to be increased in the adjacent public vacant lot and street park by pulling back the construction line. In this way, the publicity, accessibility, and spatiality of the prepared open space were strengthened. Second, a sense of place for the landscape was expressed through the image of a wave representing Busan, a coastal town. Recognition of the space was strengthened, while regional identity and the concept of transmission of information were expressed. In addition, Citrus junos Sieb., representing 'Happy news' was Planted as a symbolic tree to denote a meaningful resting Place. Third, with respect to the design of reception facilities, considering the general purposes of the construction, post office stamps, envelopes, and postal delivery persons were portrayed on the walls, decorative walls, and environmental formations respectively The flooring was decorated with stamps and waves in keeping with of the total design concept. Fourth, to select environmentally-friendly materials, soil block and eco-grass block were introduced as major paving materials, and folk kinds of trees were included on site. According to the aforesaid plans, the researcher attempted to convert the public agency and office space characterized by feelings of dullness and rigidity into a soft and vivid outdoor space. It is expected that the location will be an open place in the downtown area and be recognized as a 'shared' space for citizens of Yeonje-gu.

The verification of the application of grouting in the bottom protection work of sea dikes in the field (그라우팅을 통한 방조제 바닥보호공 차수공법 현장 적용성 검증)

  • Lee, So-Yeal;Choi, Sae-Kyung;Jeong, Il-Han
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.29-39
    • /
    • 2010
  • By understanding the construction process of sea dikes and the current state of the thickness and speed of fluid in the bottom layer protection work of final closure gaps, a construction method applicable for the blocking of bottom layer work will be selected. The three construction methods selected will be tested in site through various methods, and the reinforcement of bottom layer protection and impervious effect will be verified. The verification results are as follows: 1) The overall riprap layer were 0.5~1.0m thicker than planned so that the grouting depth and grout input amount increased 2) The applied construction methods permeability of riprap layers were improved from $\alpha{\times}10^{-2}cm/s$ before the construction to $\alpha{\times}10^{-4}cm/s$ after construction. 3) The results of core extraction in order to grossly verify the hardening time and durability allowed the identification of grout injection effect. The amount of filling of the injection was difficult to judge because the slime in many areas made the reading of borehole photography difficult.

  • PDF

SMRT STnF Construction and Performance (서울특별시도시철도공사 STnF 구축과 성과)

  • Lee, Jong-Kye;Park, Jong-Hun;Kim, Ki-Chun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2573-2580
    • /
    • 2011
  • SMRT(Seoul Metropolitan Rapid Transit Corporation) changed PC-oriented office system to Smart-Phone oriented mobile office system(STnF: SMRT Talk & Flash), and provided smart phone to all staffs. STnF make it possible not only voice communication between staff, but also to input and inquiry all kind of information related to work(ex: Facility maintenance, Rolling Stock management, office management, Finance, human resource etc.) based on smart phone. STnF conquers the limitation of time and space. All staffs can commute to the site directly to reduce moving time and to share information between staffs, so SMRT improve speed and reliability of work by making a quick decision and action on the spot. After introduction of STnF, within 1 year, the equipment failure ratio fell to 47%. Mobile office system reduced and level-off the step of approval. so enhanced civil customer service. Quantification and scientific movement of work make it fast evolution and development. These business improvement make it possible to put more outstanding manpower on new business and R&D project, and this contributes to company's management effectiveness.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.