• 제목/요약/키워드: Construction problem

검색결과 3,314건 처리시간 0.039초

시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발 (Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns)

  • 김승원;정희원;박대영;김동건;박주현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

건설현장에서 발생하는 유압식 항타진동의 특성에 관한 연구 (A Study on the Characteristics of Piling Vibration by Oil Pressure Method in Construction Field)

  • 박재영;곽광수;윤해동;김재수
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2000년도 춘계학술대회논문집
    • /
    • pp.921-926
    • /
    • 2000
  • Recently, in construction field, large construction equipment are used to reduce the construction schedule and labor cost. Therefore, construction vibration has caused much annoyance and that induced from operating of large construction equipment, has become a major problem for a number of dwellers in nearby construction field and it has become a very serious issue in our living environment. In this point, this study attempts to survey on the characteristics of piling vibration by oil pressure method in construction field. And this study intends to get the basic data to establish a standard about construction vibration.

  • PDF

Development and Verification of Technical Criteria for a U-Bridge

  • Kim, Kyoon-Tai;Kim, Chang-Han
    • 한국건축시공학회지
    • /
    • 제10권5호
    • /
    • pp.145-153
    • /
    • 2010
  • With the recent acceleration in the adoption of IT in industries, converged Construction-IT has been drawing attention as a new market driver in the IT fusion industry. Despite the simultaneous implementation of U-Cities all over Korea in a manner suiting each city's own attributes, Technical Criteria to build an optimized IT-infrastructure have not yet been prepared. To solve this problem, a standard for U-City construction should be prepared. This research, therefore, draw sample contents in order to establish and verify the criteria for U-City construction. The findings are expected to be meaningful, in that they would serve as significant data for establishing the criteria for future U-City construction.

흡착보양재의 오염물질방출 저감성능에 관한 연구 (A study on contaminant reduction performance of the adsorption protector for construction surface)

  • 허정용;최창호;이윤규
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.714-719
    • /
    • 2008
  • In a domestic construction field, after floor is constructed, protector for construction surface is set up to prevent the surface of the floor being scratched and polluted. However, the problem is that contaminants discharged with the removal of the protector for construction surface exert a bad influence for the indoor air quality. In the research, it tested to the contaminant reduction performance of the adsorption protector for construction surface using powder of charcoal by the alternative proposal of such protectors for construction surface

  • PDF

ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

IoT 기반의 건설현장 미세먼지 모니터링 시스템 개발에 관한 연구 (Particulate Matter Monitoring System Based on IoT for Construction Sites)

  • 김현식;태성호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.40-41
    • /
    • 2021
  • Recently, particulate matter(PM) caused by internal factors such as industrialization and urbanization as well as external factors such as Asian dust is a serious problem in Korea. In particular, while the emission due to construction appears to be very serious among the internal factors, it is necessary to manage PM in consideration of the characteristics of construction sites. Accordingly, in this study, a PM management system suitable for construction sites was developed to reduce civil complaints caused by PM and to minimize damage to field workers and nearby residents by supporting the fine dust management system of the state and local governments. The factors to be considered when measuring PM due to the specificity of construction sites were considered, and the system components were developed based on the considerations. As a result, an IoT based construction site PM monitoring system (CPMS) that integrates each component was established.

  • PDF

Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용 (Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume)

  • 정국영;우정원;강경돈;신재철
    • 한국BIM학회 논문집
    • /
    • 제3권3호
    • /
    • pp.9-18
    • /
    • 2013
  • In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

건설공사 공기단축으로 인한 추가비용의 산정규정에 관한 연구 (A Study of the Regulations for Calculation of Acceleration Costs on Construction Work)

  • 민병욱;박형근
    • 대한토목학회논문집
    • /
    • 제37권2호
    • /
    • pp.409-417
    • /
    • 2017
  • 본 연구는 건설 공사도중 계약상대자의 책임 없는 사유로 인하여 공사기간이 단축되는 경우 발생하는 추가비용과 관련하여 계약 당사자 사이에 발생하는 분쟁을 예방하는 방안의 연구를 목적으로 하였다. 공기단축으로 인한 추가비용에 대한 클레임 사례 및 법원의 판결 사례등을 검토한 결과 추가비용 산정에 대한 규정의 미비가 대표적인 문제점으로 나타났다. 이러한 문제점에 대한 연구의 결과로 1단계에서 추가비용을 처리하는 절차를 제시하였고, 절차 중 공기단축 계획 및 승인과정을 거치도록 하여 계약 당사자 사이의 추가비용에 대한 다툼을 예방하도록 하였다. 2단계로 추가비용 산정과 관련된 현행 규정의 미비한 문제점을 해소하는 규정의 제정 및 개정 방안을 제시하였다. 본 연구에서 제시한 절차 및 규정의 제 개정 방안을 통하여 공기단축과 관련한 현행 규정이 미비한 문제점을 해소하고 분쟁을 예방하며 이로 인한 손실 등을 방지하는 등 선진화된 계약관리의 기초가 되도록 하고자 한다.

커튼월 공사에서의 단계별 컨설턴트 참여방안 연구 (A Study on Participation of Consultant in Curtain Wall Construction)

  • 윤형수;이동섭;구교진;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.618-621
    • /
    • 2003
  • 이 연구의 목적은 현장 상황에 적절한 컨설턴트의 참여방안을 제안하는 것이다. 주의 깊게 고려된 컨설턴트의 참여는 공사비용과 기간을 단축시키고 공사 품질을 향상 시킬 수 있다. 연구의 첫 번째 단계는 커튼월 공사과정에 대한 문헌조사이다. 연구의 두 번째 단계는 공사에 관련된 전문가(설계자, 시공자. 전문시공업체, 컨설턴트)들에 대한 면담을 통한 커튼월 공사의 문제점을 분석하는 것이다. 이 때 우리는 컨설턴트가 이떻게 커튼일 공사의 문제를 해결할 수 있는지, 컨설턴트의 참여방안은 무엇인지 연구한다. 참여방안은 세 가지 방안으로 구성된다. 첫 번째 방안은 설계${\cdot}$시공단계 참여이고 두 번째 방안은 설계단계 참여, 참여, 세 번째 방안은 시공 단계 참여이다. 이러한 참여방안에 대한 검증은 전문가들의 면담을 통해 이루어졌다.

  • PDF