Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume |
Jung, Guk-Young
(한국도로공사 설계처)
Woo, Jeong-Won (한국도로공사 설계처) Kang, Kyeong-Don (한국도로공사 설계처) Shin, Jae-Choul ((주)동성엔지니어링 기술연구소) |
1 | Korea Expressway Corporation (2010). Detailed Design of Busan ring road section 1, drawings and quantity calculations. |
2 | Ministry of Land, Infrastructure and Transport (2007). Standard Method of Measurement for Civil Work. |
3 | Jung, Guk-Young, Kang, Kyeong-Don, Baek, Young-In, Shin, Jae-Choul (2012). "Application of BIM to design of expressway", CODE2012 Post Conference Workshop, p. 26. |
4 | Jung, Guk-Young, Kang, Kyeong-Don, Park, Gi-Yong, Jae-Choul Shin (2012). "Analysis of errors and applicability in bridge and tunnel quantity estimation with 3D-BIM compared with routine method based 2D", Collection of papers of Conference on Korean Institute of Building Information Modeling, 2(1):pp.63-64. |
5 | Kang, Leen-Seok, Kwak, Joong-Min (2001). "Integrated code classification system for work sections in standard method of measurement and construction standard specifications", Collection of papers of Korea Institute of Construction Engineering and Management, 2(4): pp.80-91. |
6 | Lee, Si-Won, Baek, Young-In, Shin, Jae-Choul, Jung, Guk-Young, Kang, Kyeong-Don, Park, Gi-Yong (2012). "A study on the application of construction classification for BIM of the tunnel and bridge", Collection of papers of Conference on Korean Geotechnical Society, pp. 396-399. |
7 | Shin, Jae-Choul, Ahn, Se-Ran (2013). "Analysis of errors and reliability in earth-volume and retaining wall quantity estimation with 3D-BIM compared with routine method based 2D", Collection of papers of Conference on Korean Institute of Building Information Modeling, 3(1): pp.25-26. |
8 | Shin, Jae-Choul, Woo, Jeong-Won, Kang, Kyeong-Don, Hwang, Ju-Hwan (2013). "Reliability analysis of BIM based bridge and tunnel design", Collection of papers of Korean Society of Road Engineers, 15(1):pp.47-55. |
9 | Shin, Jae-Choul, Hwang, Ju-Hwan, Lee, Sang-Gyu, Lee, Si-Won (2012). "BIM-based reliability analysis and automation of quantity calculation", Journal of Korean Society of Hazard Mitigation, 12(3):pp.49-55. DOI ScienceOn |
10 | Shin, Jae-Choul, Baek, Young-In, Park, Won-Tae (2011). "Analysis of errors in tunnel quantity estimation with 3D-BIM for routine method based 2D", Journal of Korean Geotechnical Society, 27(8):pp.63-71. 과학기술학회마을 DOI ScienceOn |
11 | Shin, Jae-Choul, Baek, Young-In, Eom, Byeong-Ho (2011). "BIM-modeling guideline for quantity stimation of NATM tunnel construction", Collection of papers of Conference on Korean Society of Hazard Mitigation, p.73. |