DOI QR코드

DOI QR Code

Reliability Analysis and Utilization of BIM-based Highway Construction Output Volume

BIM기반 고속도로 공사 물량산출 신뢰성 검토 및 활용

  • 정국영 (한국도로공사 설계처) ;
  • 우정원 (한국도로공사 설계처) ;
  • 강경돈 (한국도로공사 설계처) ;
  • 신재철 ((주)동성엔지니어링 기술연구소)
  • Received : 2013.08.29
  • Accepted : 2013.09.30
  • Published : 2013.09.30

Abstract

In case of applying the BIM method in the civil engineering of irregularly shaped structure, BIM method began to be introduced in the current building engineering area compared with the expected effects of the relatively high construction productivity has been recognized. In this paper, I have developed quantity calculation algorithms applying it to earthwork and bridge construction, tunnel construction, retaining wall construction, culvert construction and implemented BIM based 3D-BIM Modeling quantity calculation. Structure work in which errors occurred in range between -6.28% ~ 5.17%. Especially, understanding of the problem and improvement of the existing 2D-CAD based of quantity calculation through rock type quantity calculation error in range of -14.36% ~ 13.07% of earthwork quantity calculation. It's benefit and applicability of BIM method in civil engineering. In addition, routine method for quantity of earthwork has the same error tolerance negligible for that of structure work. But, rock type's quantity calculated as the error appears significantly to the reliability of 2D-based volume calculation shows that the problem could be. Through the estimating quantity of earthwork based 3D-BIM, proposed method has better reliability than routine method. BIM, as well as the design, construction, maintenance levels of information when you consider the benefits of integration, the introduction of BIM design in civil engineering and the possibility of applying for the effectiveness was confirmed. In addition, as the beginning phase of information integration, quantity document automation program has been developed for activation of BIM. And automatically enter the program code number, linkage and manual volume calculation program, quantity document automation programs, such as the development is now underway, and step-by-step procedures and methods are presented.

Keywords

References

  1. Korea Expressway Corporation (2010). Detailed Design of Busan ring road section 1, drawings and quantity calculations.
  2. Ministry of Land, Infrastructure and Transport (2007). Standard Method of Measurement for Civil Work.
  3. Jung, Guk-Young, Kang, Kyeong-Don, Baek, Young-In, Shin, Jae-Choul (2012). "Application of BIM to design of expressway", CODE2012 Post Conference Workshop, p. 26.
  4. Jung, Guk-Young, Kang, Kyeong-Don, Park, Gi-Yong, Jae-Choul Shin (2012). "Analysis of errors and applicability in bridge and tunnel quantity estimation with 3D-BIM compared with routine method based 2D", Collection of papers of Conference on Korean Institute of Building Information Modeling, 2(1):pp.63-64.
  5. Kang, Leen-Seok, Kwak, Joong-Min (2001). "Integrated code classification system for work sections in standard method of measurement and construction standard specifications", Collection of papers of Korea Institute of Construction Engineering and Management, 2(4): pp.80-91.
  6. Lee, Si-Won, Baek, Young-In, Shin, Jae-Choul, Jung, Guk-Young, Kang, Kyeong-Don, Park, Gi-Yong (2012). "A study on the application of construction classification for BIM of the tunnel and bridge", Collection of papers of Conference on Korean Geotechnical Society, pp. 396-399.
  7. Shin, Jae-Choul, Ahn, Se-Ran (2013). "Analysis of errors and reliability in earth-volume and retaining wall quantity estimation with 3D-BIM compared with routine method based 2D", Collection of papers of Conference on Korean Institute of Building Information Modeling, 3(1): pp.25-26.
  8. Shin, Jae-Choul, Woo, Jeong-Won, Kang, Kyeong-Don, Hwang, Ju-Hwan (2013). "Reliability analysis of BIM based bridge and tunnel design", Collection of papers of Korean Society of Road Engineers, 15(1):pp.47-55.
  9. Shin, Jae-Choul, Hwang, Ju-Hwan, Lee, Sang-Gyu, Lee, Si-Won (2012). "BIM-based reliability analysis and automation of quantity calculation", Journal of Korean Society of Hazard Mitigation, 12(3):pp.49-55. https://doi.org/10.9798/KOSHAM.2012.12.3.049
  10. Shin, Jae-Choul, Baek, Young-In, Park, Won-Tae (2011). "Analysis of errors in tunnel quantity estimation with 3D-BIM for routine method based 2D", Journal of Korean Geotechnical Society, 27(8):pp.63-71. https://doi.org/10.7843/kgs.2011.27.8.063
  11. Shin, Jae-Choul, Baek, Young-In, Eom, Byeong-Ho (2011). "BIM-modeling guideline for quantity stimation of NATM tunnel construction", Collection of papers of Conference on Korean Society of Hazard Mitigation, p.73.

Cited by

  1. An Accuracy Analysis on Quantity Take-off Using BIM-based Spatial Object vol.4, pp.4, 2014, https://doi.org/10.13161/kibim.2014.4.4.013
  2. Standardization of Infrastructure Information Modeling based on BIM Information Framework vol.19, pp.3, 2014, https://doi.org/10.7315/CADCAM.2014.281
  3. Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5 vol.4, pp.4, 2014, https://doi.org/10.13161/kibim.2014.4.4.001