The Application of using BIM(Building Information Modeling) for a Mega-Complex Building Construction - Focused on using for L-Project - (초고층 대형복합 건축공사에 있어 BIM 활용에 관한 고찰 - 해운대 L-Project 적용 성과를 중심으로 -)

  • Park, Hee-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.42-43
    • /
    • 2020
  • Recently as construction projects have been complicated, it has been wearing thin to draw on their personal experiences for management. Although the advance of IT, using the technology for construction is insufficient in contrast to other industries. BIM has been steadily used in construction projects, but it is not easy to find the case of successful use. This research considers ways in which BIM technology can be applied to useful management on a construction site and derives a method of application of using BIM for a Mega-complex Building Project especially.

  • PDF

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

Analysis of Job Risk Matrix Exposed to Safety Accidents in Construction Field (건설현장 안전사고의 작업 리스크 매트릭스 분석)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.58-59
    • /
    • 2017
  • As the construction industry has been increasingly complex, aging workers, hard-working avoiding young generation, foreign workers having language problem for the past decades, delivering of construction qualified workers has been a rising problem. This misalignment between the complex jobs and the number of skilled workers will continue to be in issue that the construction industry will face for following decades. Construction field workers who are working outside in uncontrollable condition unlike manufacturing industry are exposed to easily construction safety accident. There are so many efforts to prevent and control the construction accident. However, the relationships between the construction works and construction safety accident has not been well dealt and investigated based on objective accident data except for the qualitative study through interview, delphi and so on. Therefore this study analyzes job risk matrix exposed to safety accidents based on statistic data for 20 years from Korean Occupational Safety & Health Agency in order to prevent the construction field accidents.

  • PDF

The Construction Method which attached Complex Stone Panel to Concrete Wall using High-Frequency Holt-Melt Machine (고주파 접착기를 사용한 복합석재판의 콘크리트 벽체 부착 시공)

  • Oh, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.45-49
    • /
    • 2010
  • The contamination(stain phenomenon) of natural marble(sipeol, bianko) of art wall of on-site interior finishing system and wall of elevator hall has occurred. The bottom of the art wall of stone junction tile has defects as cracks. To solve these problems, our research team developed eco-friendly complex stone panel(stone 4T + cement board 6T) and high-frequency hot-melt construction method that can construct in winter.

  • PDF

A Study on the Specificity of Construction Progress for Landscape Construction Schedule Management -With regard to Landscape Construction of Housing Complex- (조경공사 공정관리를 위한 공정진도의 특성에 관한 연구 -주택단지 조경공사 사례를 대상으로-)

  • 박원규
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.20 no.4
    • /
    • pp.93-101
    • /
    • 1993
  • The purpose of this study is to analyze th especificity of landscape construction progress in order to develop the model of landscape construction schedule management. Nine case study area in housing complex was selected and the graphic curve of the accumulative payment by landscape construction schedule was analyzed. And the results are as follows: The graphic curve of common construction progress is S-curve but that of landscape construction progress is parabolic-curve, because landscape construction concentrally progress in last period of construction schedule. And particularly parabolic-curve seems to rise up suddenly in the last period when landscape construction amount is small.

  • PDF

Nonlinear time-varying analysis algorithms for modeling the behavior of complex rigid long-span steel structures during construction processes

  • Tian, Li-Min;Hao, Ji-Ping
    • Steel and Composite Structures
    • /
    • v.18 no.5
    • /
    • pp.1197-1214
    • /
    • 2015
  • There is a great difference in mechanical behavior between design model one-time loading and step-by-step construction process. This paper presents practical computational methods for simulating the structural behavior of long-span rigid steel structures during construction processes. It introduces the positioning principle of node rectification for installation which is especially suitable for rigid long-span steel structures. Novel improved nonlinear analytical methods, known as element birth and death of node rectification, are introduced based on several calculating methods, as well as a forward iteration of node rectification method. These methods proposed in this paper can solve the problem of element's 'floating' and can be easily incorporated in commercial finite element software. These proposed methods were eventually implemented in the computer simulation and analysis of the main stadium for the Universiade Sports Center during the construction process. The optimum construction scheme of the structure is determined by the improved algorithm and the computational results matched well with the measured values in the project, thus indicating that the novel nonlinear time-varying analysis approach is effective construction simulation of complex rigid long-span steel structures and provides useful reference for future design and construction.

Monitoring management for safely construction of deep shield tunnel (대심도 해저 쉴드터널 안전시공을 위한 계측관리)

  • 유길환;김영수;황대영;곽정민;정성교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.319-326
    • /
    • 2002
  • During the construction period of submarine shield tunnel, which is built firstly in very soft marine clay layer 40m deep in Korea, wide range problems were encountered such as safe launching against high earth pressure at shield entrance, technique of shield face pressure control when passing through complex multi-layered soils This paper introduces successful construction practice through development of state-of-the-art construction method and field monitoring.

  • PDF

SPACE STRUCTURE ANALYSIS OF COMPLEX CULTURE SHOPPING FACILITY.

  • Jae-Hong Hwang;Byung-ju Ank;Whoi-yul Kim;Jae-Joon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1128-1133
    • /
    • 2009
  • Recently super complex culture shopping facility development seeks consumer' convenience present and are coming restaurant neighborhood, cinema, shopping, hotel etc, according to intensive plan. Such as complex culture shopping facility was developed to most subway station area center and have concept that is space for a main facilities or space for environment protection, citizens' a rest in city. Howeve,r space of recently domestic large size complex culture shopping facility that do not plan systematically was lacking and caused result that do not use efficiently space. Limited extent of research that define complex culture shopping equipment and analyze form of space and present space planning with analysis of research connected with complex usage development.

  • PDF

Settlement behaviours and control measures of twin-tube curved buildings-crossing shield tunnel

  • Jianwei, Jia;Ruiqi, Gao;Defeng, Wang;Jianjun, Li;Ziwen, Song;Jinghui, Tan
    • Structural Engineering and Mechanics
    • /
    • v.84 no.5
    • /
    • pp.699-706
    • /
    • 2022
  • Settlement control techniques are critical for the safety of shield tunnel constructions, especially for facing complex situations. In this study, the shield tunnel structure from Huaita east road station to Heping Road station in Xuzhou metro No.3 line (China) is taken as engineering background, which has various complex problems of the upper-soft and lower-hard composite stratum conditions, twin curve shield tunnels, and underpass the foundation of the piled raft. The deformation characteristics of shield tunnelling passing through buildings are explored. Subsequently, comprehensive research methods of numerical simulation and field measurement are adopted to analyzing the effectiveness of settlement control by using the top grouting technique. The results show that the settlement of the buildings has obvious spatial characteristics, and the hysteresis effect can be obviously observed in soil deformation caused by shield construction. Meanwhile, the two shield constructions can cause repeated disturbances, reducing the soil deformation's hysteresis effect. Moreover, the shield tunnel's differential settlement is too large when a single line passes through, and the shield construction of the outer curve can cause more significant disturbance in the tunnel than the inside curve. Notably, the proposed process control parameters and secondary topgrouting method can effectively control the deformation of the shield tunnel, especially for the long-term deformation.

Domestic Economic Effects of Overall Industrial Complex Construction - Based on the Induced Coefficients by Development Stage of Industrial Complex - (해외 산업단지 건설의 국내경제 파급효과 분석 - 산업단지 개발단계별 유발계수를 기준으로 -)

  • Choi, Myoungsub;Cho, Kang-Joo;Kim, Myeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.117-125
    • /
    • 2019
  • This study was aimed to derive measures for maximizing ripple effect of construction of overseas industrial complexes on domestic economy. The induced coefficients were estimated for each step of development of industrial complexes by applying the raw data of ICAK and the input-output mode. As a result, for urban service, the fraction of labor costs was high, and for civil engineering, the fraction of profit & loss was high. However, the proportion of intermediate and profit & loss was high in Architecture. Consequently, compare to the same type of overseas constructions, larger effects were seen at urban service in terms of employment, at civil engineering and architecture in terms of business, and at national economy in terms of architecture. These results suggest that in order to maximize ripple effect of construction of overseas industrial complex on domestic economy, it will be needed to seek an order strategy including not only simply sell a land and but also building factories in the industrial complex.