• Title/Summary/Keyword: Construction of Reality

Search Result 523, Processing Time 0.023 seconds

A Study on the Simultaneous Loading Factors for the Fatigue Design of Bridges (교량 피로설계의 동시재하계수에 관한 연구)

  • Lee, Dong Uk;Seo, Won Chan;Choi, Jae Won
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.2 s.45
    • /
    • pp.151-165
    • /
    • 2000
  • Since vehicles become large and heavy and traffic volume is increased rapidly, many fatigue damages have been reported in bridge members. In order to prevent fatigue damages of bridge members and maintain safety it is essential to perform rational fatigue check. Only one vehicle is loaded on a bridge deck for the fatigue design. But in reality it is seldom that only one vehicle passes on a bridge deck. Usually more than two vehicles are passing on a bridge deck simultaneously. Therefore, it is necessary to consider the influence of simultaneous loading for a rational fatigue design. In this study, the influence of simultaneous loading is investigated by performing stress variation analysis due to vehicle load on the basis of linear superposition method and Monte-Carlo simulation of traffic flow, and then calculating the measure of fatigue damages.

  • PDF

A Study on the Fair Returns of Private Participants' Investments on BTO PPI Projects (BTO 민간투자사업 적정수익률에 관한 연구)

  • Shin, Sung-Hwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.121-131
    • /
    • 2009
  • This study will estimate the fair return on private participants' investments on BTO type PPI (Private Public Infrastructure) projects using the data from past BTO projects in Korea. In the past, the real returns of $6%\sim9%$ were provided to private participants. The results of this study show that those returns were too high compared with the estimated fair returns, especially for projects with the minimum revenue guarantee (MRG) by the government. Moreover, the excess portion of the return over the fair return becomes even larger when there is a demand forecast bias. In reality, most of the BTO projects have far lower actual revenues than the initial forecasted revenue in concession agreements. This phenomenon implies that BTO projects have a tendency of overly forecasting revenues. If so, the value of the minimum revenue guarantee becomes larger, and therefore, the fair return to private participants should decrease. It is hoped that this study helps future BTO projects' concession agreements between the government and private participants to become more fair from the perspectives of risk and return profiles.

Development of Disaster Management IETM for Effective Disaster Information Management of Construction Facilities (시설물의 효율적 재해정보관리를 위한 재해관리전자매뉴얼 구축 연구)

  • Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.255-265
    • /
    • 2009
  • Because the current disaster management task is being processed by using a separated operation system and an insufficient information system by each division, construction facilities suffer great damage by disaster. This research has classified the disaster management business phase and information by each phase through analyzing the existing disaster management information and business process. Then, it has built a disaster management information breakdown structure for integrating of individual disaster information, and also established a standard XML (eXtensible Markup Language) schema of disaster management electronic documents for a real-time utilization. The suggested methods in this research are verified by developing a manual system of electronic type. The disaster management IETM developed in this study provides the consistency for processing the disaster management tasks and the prevention of information omission. And it can be used as a electronic decision making tool for providing of integrated disaster management information.

A Study on the Construction of RDM in an Organization Using Big Data and Block Chain (빅데이터와 블록체인을 활용한 조직내 RDM 구축방안)

  • Lee, Kyung-Hee;Choi, Youngjin;Cho, Wan-Sup
    • The Journal of Bigdata
    • /
    • v.4 no.2
    • /
    • pp.127-139
    • /
    • 2019
  • Research Data Management (RDM) is a system that encompasses people, policies, resources and technologies that provide and support directions in producing, collecting, using, and preserving research data. RDMs consist of a wide range of activities, including supporting the creation of data management plans (DMPs), building data collections and repositories, and digital preservation and distribution. In advanced countries, systems for RDMs and related organizations are well organized and functioning, but in Korea, the management system is insufficient due to low level of data awareness. In this paper, we propose a plan to establish a research data management system suitable for the reality. In particular, it is important to reflect in RDM that the construction of big data platforms for the collection and management of big data in each field and organization is increasing rapidly. Also, we will discuss how to provide data provision and researchers' data sovereignty using blockchain technology, and propose a P2P-based decentralized RDM scheme.

  • PDF

Construction of Information System for Cultural Heritages Management Using Web (웹을 이용한 문화재 관리 정보시스템 구축)

  • Jang, Ho-Sik;Roh, Tae-Ho;Lee, Jong-Chool
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.1 s.28
    • /
    • pp.63-68
    • /
    • 2004
  • Since 20th century, the rapid growth in economy development and ill-advisable construction of infrastructure which causing injury of nature has generated an El Nino phenomenon problems. For this reason, establishment of heritage preservation plan is being required to prevent damages of important cultural assets from natural disaster. In this study, we obtained both 3D-dxf and VRML-wrl(which support 3D image) files from stone pagodas(stone cultural heritages) by using the digital photogrammetric program. Then database are formed by these two files with other attribute informations. And we made existing cultural heritages management information data format to be unified using JAVA, HTML, and Cosmo Player. Thus, we could construct the web-server for Cultural Heritages Management Information System to contribute not only effective management but also ease of use for expert or amateur user in using of cultural assets informations. And, in virtual reality system, we could make texture presented like as actual texture by using the VRML program.

  • PDF

Automated Construction of IndoorGML Data Using Point Cloud (포인트 클라우드를 이용한 IndoorGML 데이터의 자동적 구축)

  • Kim, Sung-Hwan;Li, Ki-Joune
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.38 no.6
    • /
    • pp.611-622
    • /
    • 2020
  • As the advancement of technologies on indoor positioning systems and measuring devices such as LiDAR (Light Detection And Ranging) and cameras, the demands on analyzing and searching indoor spaces and visualization services via virtual and augmented reality have rapidly increasing. To this end, it is necessary to model 3D objects from measured data from real-world structures. In addition, it is important to store these structured data in standardized formats to improve the applicability and interoperability. In this paper, we propose a method to construct IndoorGML data, which is an international standard for indoor modeling, from point cloud data acquired from LiDAR sensors. After examining considerations that should be addressed in IndoorGML data, we present a construction method, which consists of free space extraction and connectivity detection processes. With experimental results, we demonstrate that the proposed method can effectively reconstruct the 3D model from point cloud.

A Proposal of Media Exhibition Contents for the Aquarium - Focused on 'Gyeongpo Lagoon Ecological Museum' (아쿠아리움을 위한 미디어 전시 콘텐츠 제안 - 경포 석호생태관을 중심으로)

  • You, Mi;Woo, Jeonggueon
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.3
    • /
    • pp.116-124
    • /
    • 2016
  • In this paper, we propose digital exhibition contents for the aquarium, especially 'Gyeongpo Lagoon Ecological Museum'. We try to plan appropriate media contents that can be mixed with the aquarium storytelling. The aquarium must have special spaces that are not related with an exhibition directly but are necessary for survival of fishes such as a water circulation room. We design the special spaces using media contents and let visitors feel that the whole aquarium is in the ocean. First of all, we investigate the aquarium currently under construction. And then, we propose the appreciate media platforms and plan individual content. We suggest 3 types of media platforms, 3D water projection, interactive games utilizing Kinect, and a fog screen. Moreover, we produce 2D drawing concepts, 3D modeling images, and virtual exhibitions in virtual reality for the representation of the location in which those platforms are installed and the media contents we plan. The pre-visualization is helpful for the media platform construction and is used as a rough sketch to producing an animation shown in the exhibition.

Effectiveness of "Village Image Construction Tool Kit" in the Residents Workshop of a Housing Improvement Area (주거지 정비지역 주민 워크샵을 통한 마을이미지 맵 제작도구의 효용성 연구)

  • Lee, Yeun-Sook;Kim, Ju-Suck;Jung, Eun-Jung
    • Journal of the Korean housing association
    • /
    • v.21 no.1
    • /
    • pp.67-77
    • /
    • 2010
  • Citizen participation in local redevelopment has recently been regarded as essential, since progress in democracy and diversified public interests have contributed to more importance being placed on citizen participation in the implementation of public policies. While the importance of resident participation has been increasingly emphasized in principle, in reality more effort is still required in its application. We need to develop practical strategies of collecting community opinion in order to reflect it in public policy, if we are to achieve a resident and citizen-centered society. The purpose of this study is to develop an image map construction tool that can be applied to the "Maul-Mandulgi" projects as a visualized method to facilitate the exchange of opinions and work toward agreements. The tool is intended to assist public discussion by visualizing policies and plans and reducing the possibility of misunderstanding, so that residents can properly respond to the plans. Second, this study will verify the effectiveness of the tool in the application to local community workshops. The main research method is participant observation method and field study. Major findings are as follows, First, every resident who had participated in previous workshops gathered together, used the tool and represented their opinions unusually more than once. Each resident tried to make sure that other participants appropriately understood his or her opinion. The workshop finished when all participants agreed and produced a consensus. The workshop took much less time, which is in stark contrast to previous workshops in which it took significantly more time to collect opinions. Second, it proved that residents in the redevelopment area can strike a broad agreement by themselves on a method and direction for residential improvement. In previous workshops, conflicts between residents developed over the choice between the two methods, of local improvement and total demolition prior to multi-housing construction. In this study, opinions of residents were not limited to the two methods by finding a winwin solution. Third, the use of the tool kit for image map became efficient for inactive residents to develop their own opinions in regard to the direction and orientations of the residential improvement process. In addition, for those who have either no or a slight understanding of the residential improvement projects, the tool can provide access to information and knowledge. This study concludes that the developed tool for imaging of the redevelopment projection like a design game, rather than using forms of text and speech, can be a useful tool in collecting opinions and forming an agreed opinion for forthcoming residential improvement plans.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.

A Study on the Estimation of Change Orders Impact for the Public Construction (공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구)

  • Lee, Min-Jae;Park, Bum-Jin;Im, Keon-Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.363-369
    • /
    • 2008
  • Change is inevitable and is a reality of construction projects. Change adjustment includes the cost associated with materials, labor, etc. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. What is needed is a reliable method to identify and quantify the loss of productivity caused by cumulative impact of change orders. This study survey the change orders data in domestic area for public construction and analyze to quantify change order impact. This study developed concepts of "%CO", "%Delta", "%T" to capture change order effect on project and search the relationships between them. Finally, this study find strong relationship between change order and loss.